If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0304251806000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.566714,"lon":-113.512458,"icon":""}]} |
Location: 00/06-18-030-25W4/0 | |
Location Alias: 00/06-18-30-25 W4M | |
Location Alias 2: 00/06-18-030-25 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 030 | |
Meridian: 4 | |
Range: 25 | |
Section: 18 | |
County/Municipality: Kneehill County | |
Well Name: EMBER TWINING 6-18-30-25 | |
Operator Name: Ember Resources Inc. | |
License Number: 0423139 | |
License Date: 2010-09-01 | |
License Status: Issued | |
Spud Date: 2010-10-21 | |
Final Drill Date: 2010-11-03 | |
Well Total Depth: 958.00 m | |
Surface Hole Latitude: 51.566714 | |
Surface Hole Longitude: -113.512458 |
Date | Event |
---|---|
2010-09-01 | Obtained License |
2010-10-21 | Surface Casing Operation Performed |
2010-11-03 | Finished Drilling |
2010-11-03 | Production Casing Operation Performed |
2010-11-03 | Rig Released |
2010-11-03 | Well Mode changed to Drilled and Cased |
2010-11-06 | Well Log Performed |
2010-11-16 | Perforation Treatment Performed - Jet Perforation |
2010-11-22 | Perforation Treatment Performed - Fractured |
2010-11-26 | Well Fluid changed to Coalbed Methane-Coals and Other |
2010-11-26 | Well Mode changed to Testing |
2011-01-13 | Well Began Production |
2011-01-13 | Well Fluid changed to Coalbed Methane-Coals and Other |
2011-01-13 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2010-11-16 | Perforation | 523.00 | 524.00 | 13 |
2010-11-16 | Perforation | 394.40 | 394.90 | 13 |
2010-11-16 | Perforation | 411.00 | 414.00 | 13 |
2010-11-16 | Perforation | 454.50 | 455.50 | 13 |
2010-11-16 | Perforation | 466.60 | 467.10 | 13 |
2010-11-16 | Perforation | 462.50 | 464.50 | 13 |
2010-11-16 | Perforation | 459.50 | 460.50 | 13 |
2010-11-16 | Perforation | 604.80 | 605.30 | 13 |
2010-11-16 | Perforation | 603.80 | 604.30 | 13 |
2010-11-16 | Perforation | 602.30 | 602.80 | 13 |
2010-11-16 | Perforation | 611.60 | 612.10 | 13 |
2010-11-16 | Perforation | 503.20 | 504.20 | 13 |
2010-11-16 | Perforation | 626.30 | 626.80 | 13 |
2010-11-16 | Perforation | 618.60 | 619.60 | 13 |
2010-11-16 | Perforation | 613.60 | 614.10 | 13 |
2010-11-16 | Perforation | 580.20 | 581.70 | 13 |
2010-11-16 | Perforation | 585.60 | 586.60 | 13 |
2010-11-16 | Perforation | 558.30 | 558.80 | 13 |
2010-11-16 | Perforation | 567.00 | 567.50 | 13 |
2010-11-16 | Perforation | 600.90 | 601.40 | 13 |
2010-11-16 | Perforation | 595.80 | 596.30 | 13 |
2010-11-16 | Perforation | 597.40 | 598.40 | 13 |
2010-11-16 | Perforation | 499.10 | 499.60 | 13 |
2010-11-22 | Fracture | 411.00 | 414.00 | 0 |
2010-11-22 | Fracture | 611.60 | 626.80 | 0 |
2010-11-22 | Fracture | 477.80 | 598.40 | 0 |
2010-11-22 | Fracture | 454.50 | 464.50 | 0 |
2010-11-22 | Fracture | 477.80 | 598.40 | 0 |
2010-11-16 | Perforation | 528.20 | 529.20 | 13 |
2010-11-16 | Perforation | 551.90 | 552.40 | 13 |
2010-11-16 | Perforation | 549.70 | 550.20 | 13 |
2010-11-16 | Perforation | 548.30 | 548.80 | 13 |
2010-11-16 | Perforation | 477.80 | 478.30 | 13 |
2010-11-16 | Perforation | 405.10 | 405.60 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2010 | 24 | 0.0 | 0.0 | 0.0 |
2011 | 8455 | 0.0 | 0.0 | 0.0 |
2012 | 8645 | 0.0 | 0.0 | 0.0 |
2013 | 8694 | 0.0 | 0.0 | 0.0 |
2014 | 8685 | 0.0 | 0.0 | 0.0 |
2015 | 8545 | 0.0 | 0.0 | 0.0 |
2016 | 8667 | 0.0 | 0.0 | 0.0 |
2017 | 8582 | 0.0 | 0.0 | 0.0 |
2018 | 8604 | 0.0 | 0.0 | 0.0 |
2019 | 8672 | 0.0 | 0.0 | 0.0 |
2020 | 2156 | 0.0 | 0.0 | 0.0 |
For data sources see[5]