If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0304251402000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.563868,"lon":-113.414705,"icon":""}]} |
Location: 00/02-14-030-25W4/0 | |
Location Alias: 00/02-14-30-25 W4M | |
Location Alias 2: 00/02-14-030-25 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 030 | |
Meridian: 4 | |
Range: 25 | |
Section: 14 | |
County/Municipality: Kneehill County | |
Well Name: EMBER TWINING 2-14-30-25 | |
Operator Name: Ember Resources Inc. | |
License Number: 0418783 | |
License Date: 2010-02-22 | |
License Status: Issued | |
Spud Date: 2010-08-09 | |
Final Drill Date: 2010-09-05 | |
Well Total Depth: 629.00 m | |
Surface Hole Latitude: 51.563868 | |
Surface Hole Longitude: -113.414705 |
Date | Event |
---|---|
2010-02-22 | Obtained License |
2010-08-11 | Surface Casing Operation Performed |
2010-09-05 | Finished Drilling |
2010-09-05 | Production Casing Operation Performed |
2010-09-05 | Rig Released |
2010-09-05 | Well Mode changed to Drilled and Cased |
2010-09-10 | Well Log Performed |
2010-10-07 | Perforation Treatment Performed - Jet Perforation |
2010-10-12 | Perforation Treatment Performed - Jet Perforation |
2010-10-20 | Perforation Treatment Performed - Fractured |
2010-10-24 | Well Fluid changed to Coalbed Methane-Coals and Other |
2010-10-24 | Well Mode changed to Testing |
2010-10-31 | Well Began Production |
2010-10-31 | Well Fluid changed to Coalbed Methane-Coals and Other |
2010-10-31 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2010-10-07 | Perforation | 540.70 | 541.70 | 13 |
2010-10-07 | Perforation | 556.60 | 557.60 | 13 |
2010-10-12 | Perforation | 409.60 | 410.60 | 13 |
2010-10-12 | Perforation | 406.20 | 407.20 | 13 |
2010-10-12 | Perforation | 427.50 | 428.50 | 13 |
2010-10-12 | Perforation | 419.30 | 421.30 | 13 |
2010-10-12 | Perforation | 299.70 | 300.70 | 13 |
2010-10-12 | Perforation | 472.50 | 473.50 | 13 |
2010-10-12 | Perforation | 320.40 | 321.40 | 13 |
2010-10-12 | Perforation | 292.00 | 293.00 | 13 |
2010-10-12 | Perforation | 289.00 | 290.00 | 13 |
2010-10-07 | Perforation | 549.30 | 550.30 | 13 |
2010-10-12 | Perforation | 476.30 | 477.30 | 13 |
2010-10-12 | Perforation | 475.10 | 476.10 | 13 |
2010-10-12 | Perforation | 504.30 | 506.30 | 13 |
2010-10-12 | Perforation | 478.10 | 480.10 | 13 |
2010-10-12 | Perforation | 457.40 | 458.40 | 13 |
2010-10-12 | Perforation | 435.00 | 436.00 | 13 |
2010-10-12 | Perforation | 468.10 | 469.10 | 13 |
2010-10-12 | Perforation | 461.40 | 463.40 | 13 |
2010-10-12 | Perforation | 406.00 | 406.00 | 13 |
2010-10-20 | Fracture | 320.40 | 321.40 | 0 |
2010-10-07 | Perforation | 532.70 | 534.70 | 13 |
2010-10-20 | Fracture | 472.50 | 473.50 | 0 |
2010-10-20 | Fracture | 289.00 | 559.80 | 0 |
2010-10-20 | Fracture | 568.40 | 583.10 | 0 |
2010-10-07 | Perforation | 508.40 | 509.40 | 13 |
2010-10-07 | Perforation | 522.80 | 523.80 | 13 |
2010-10-07 | Perforation | 550.30 | 551.30 | 13 |
2010-10-07 | Perforation | 568.40 | 569.40 | 13 |
2010-10-07 | Perforation | 582.10 | 583.10 | 13 |
2010-10-07 | Perforation | 558.80 | 559.80 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2010 | 1475 | 0.0 | 0.0 | 0.0 |
2011 | 8726 | 0.0 | 0.0 | 0.0 |
2012 | 8668 | 0.0 | 0.0 | 0.0 |
2013 | 8751 | 0.0 | 0.0 | 0.0 |
2014 | 8734 | 0.0 | 0.0 | 0.0 |
2015 | 8744 | 0.0 | 0.0 | 0.0 |
2016 | 8757 | 0.0 | 0.0 | 0.0 |
2017 | 8721 | 0.0 | 0.0 | 0.0 |
2018 | 8710 | 0.0 | 0.0 | 0.0 |
2019 | 8704 | 0.0 | 0.0 | 0.0 |
2020 | 2180 | 0.0 | 0.0 | 0.0 |
For data sources see[5]