If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0304251005000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.555941,"lon":-113.444465,"icon":""}]} |
Location: 00/05-10-030-25W4/0 | |
Location Alias: 00/05-10-30-25 W4M | |
Location Alias 2: 00/05-10-030-25 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 030 | |
Meridian: 4 | |
Range: 25 | |
Section: 10 | |
County/Municipality: Kneehill County | |
Well Name: EMBER SD TWINING 5-10-30-25 | |
Operator Name: Ember Resources Inc. | |
License Number: 0436751 | |
License Date: 2011-09-13 | |
License Status: Issued | |
Spud Date: 2011-12-10 | |
Final Drill Date: 2011-12-11 | |
Well Total Depth: 1124.00 m | |
Surface Hole Latitude: 51.555941 | |
Surface Hole Longitude: -113.444465 |
Date | Event |
---|---|
2011-09-13 | Obtained License |
2011-12-10 | Direction Drilling Operation Performed - Deviate |
2011-12-10 | Surface Casing Operation Performed |
2011-12-11 | Finished Drilling |
2011-12-11 | Production Casing Operation Performed |
2011-12-11 | Well Mode changed to Drilled and Cased |
2011-12-12 | Rig Released |
2012-01-13 | Perforation Treatment Performed - Jet Perforation |
2012-01-15 | Perforation Treatment Performed - Fractured |
2012-01-30 | Well Began Production |
2012-01-30 | Well Fluid changed to Coalbed Methane-Coals and Other |
2012-01-30 | Well Mode changed to Flowing |
2015-09-03 | Well Log Performed |
2019-08-24 | Well Log Performed |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2011-12-10 | 0.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-01-13 | Perforation | 320.30 | 321.30 | 13 |
2012-01-13 | Perforation | 581.10 | 584.10 | 13 |
2012-01-13 | Perforation | 590.00 | 590.50 | 13 |
2012-01-13 | Perforation | 596.10 | 598.60 | 13 |
2012-01-13 | Perforation | 603.80 | 604.80 | 13 |
2012-01-13 | Perforation | 606.60 | 607.10 | 13 |
2012-01-13 | Perforation | 617.50 | 618.50 | 13 |
2012-01-13 | Perforation | 649.60 | 650.60 | 13 |
2012-01-13 | Perforation | 653.90 | 655.90 | 13 |
2012-01-13 | Perforation | 665.10 | 666.10 | 13 |
2012-01-13 | Perforation | 678.70 | 680.20 | 13 |
2012-01-13 | Perforation | 407.20 | 408.70 | 13 |
2012-01-13 | Perforation | 685.00 | 687.00 | 13 |
2012-01-13 | Perforation | 702.10 | 704.60 | 13 |
2012-01-13 | Perforation | 707.00 | 707.50 | 13 |
2012-01-13 | Perforation | 724.30 | 725.30 | 13 |
2012-01-13 | Perforation | 734.30 | 736.30 | 13 |
2012-01-13 | Perforation | 742.20 | 743.70 | 13 |
2012-01-13 | Perforation | 753.70 | 754.20 | 13 |
2012-01-13 | Perforation | 754.80 | 755.80 | 13 |
2012-01-13 | Perforation | 759.40 | 760.40 | 13 |
2012-01-13 | Perforation | 763.00 | 764.00 | 13 |
2012-01-13 | Perforation | 423.00 | 424.50 | 13 |
2012-01-13 | Perforation | 773.70 | 774.20 | 13 |
2012-01-13 | Perforation | 775.00 | 775.50 | 13 |
2012-01-13 | Perforation | 776.80 | 777.80 | 13 |
2012-01-13 | Perforation | 965.50 | 967.00 | 13 |
2012-01-13 | Perforation | 1037.50 | 1038.50 | 13 |
2012-01-13 | Perforation | 1075.00 | 1078.00 | 13 |
2012-01-13 | Perforation | 1086.50 | 1088.00 | 13 |
2012-01-13 | Perforation | 1108.50 | 1110.50 | 13 |
2012-01-15 | Fracture | 320.30 | 777.80 | 0 |
2012-01-13 | Perforation | 427.50 | 429.50 | 13 |
2012-01-13 | Perforation | 431.00 | 432.50 | 13 |
2012-01-13 | Perforation | 433.60 | 434.60 | 13 |
2012-01-13 | Perforation | 479.50 | 482.00 | 13 |
2012-01-13 | Perforation | 559.10 | 559.60 | 13 |
2012-01-13 | Perforation | 575.00 | 576.50 | 13 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 7333 | 0.0 | 0.0 | 0.0 |
2013 | 8521 | 0.0 | 0.0 | 0.0 |
2014 | 8016 | 0.0 | 0.0 | 0.0 |
2015 | 8735 | 0.0 | 0.0 | 0.0 |
2016 | 8733 | 0.0 | 0.0 | 0.0 |
2017 | 8721 | 0.0 | 0.0 | 0.0 |
2018 | 8710 | 0.0 | 0.0 | 0.0 |
2019 | 8463 | 0.0 | 0.0 | 0.0 |
2020 | 2180 | 0.0 | 0.0 | 0.0 |
For data sources see[6]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2019-08-24 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[7]