If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0304250708000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.553754,"lon":-113.501944,"icon":""}]} |
Location: 00/08-07-030-25W4/0 | |
Location Alias: 00/08-07-30-25 W4M | |
Location Alias 2: 00/08-07-030-25 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 030 | |
Meridian: 4 | |
Range: 25 | |
Section: 07 | |
County/Municipality: Kneehill County | |
Well Name: EMBER TWINING 8-7-30-25 | |
Operator Name: Ember Resources Inc. | |
License Number: 0423162 | |
License Date: 2010-09-01 | |
License Status: Issued | |
Spud Date: 2010-10-06 | |
Final Drill Date: 2010-10-09 | |
Well Total Depth: 961.00 m | |
Surface Hole Latitude: 51.553754 | |
Surface Hole Longitude: -113.501944 |
Date | Event |
---|---|
2010-09-01 | Obtained License |
2010-10-06 | Surface Casing Operation Performed |
2010-10-09 | Finished Drilling |
2010-10-09 | Production Casing Operation Performed |
2010-10-09 | Rig Released |
2010-10-09 | Well Mode changed to Drilled and Cased |
2010-10-13 | Well Log Performed |
2010-11-01 | Perforation Treatment Performed - Jet Perforation |
2010-11-02 | Perforation Treatment Performed - Fractured |
2010-11-05 | Well Fluid changed to Coalbed Methane-Coals and Other |
2010-11-05 | Well Mode changed to Testing |
2011-01-13 | Well Began Production |
2011-01-13 | Well Fluid changed to Coalbed Methane-Coals and Other |
2011-01-13 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2010-11-01 | Perforation | 442.80 | 443.30 | 13 |
2010-11-01 | Perforation | 319.00 | 319.50 | 13 |
2010-11-01 | Perforation | 322.30 | 322.80 | 13 |
2010-11-01 | Perforation | 568.00 | 569.00 | 13 |
2010-11-01 | Perforation | 316.90 | 317.40 | 13 |
2010-11-01 | Perforation | 326.20 | 326.70 | 13 |
2010-11-01 | Perforation | 392.60 | 393.10 | 13 |
2010-11-01 | Perforation | 399.60 | 400.10 | 13 |
2010-11-01 | Perforation | 335.20 | 335.70 | 13 |
2010-11-01 | Perforation | 391.00 | 391.50 | 13 |
2010-11-01 | Perforation | 594.70 | 595.20 | 13 |
2010-11-01 | Perforation | 446.50 | 447.00 | 13 |
2010-11-01 | Perforation | 596.90 | 597.90 | 13 |
2010-11-01 | Perforation | 589.60 | 590.10 | 13 |
2010-11-01 | Perforation | 591.80 | 592.30 | 13 |
2010-11-01 | Perforation | 612.30 | 613.30 | 13 |
2010-11-01 | Perforation | 619.00 | 619.50 | 13 |
2010-11-01 | Perforation | 600.40 | 600.90 | 13 |
2010-11-01 | Perforation | 608.80 | 609.30 | 13 |
2010-11-01 | Perforation | 580.30 | 581.30 | 13 |
2010-11-01 | Perforation | 523.20 | 523.70 | 13 |
2010-11-01 | Perforation | 544.30 | 544.80 | 13 |
2010-11-01 | Perforation | 438.80 | 439.30 | 13 |
2010-11-01 | Perforation | 517.60 | 518.60 | 13 |
2010-11-01 | Perforation | 521.20 | 522.20 | 13 |
2010-11-01 | Perforation | 561.90 | 562.40 | 13 |
2010-11-01 | Perforation | 573.60 | 575.10 | 13 |
2010-11-01 | Perforation | 549.60 | 550.10 | 13 |
2010-11-01 | Perforation | 547.00 | 548.00 | 13 |
2010-11-02 | Fracture | 568.00 | 569.00 | 0 |
2010-11-02 | Fracture | 316.90 | 562.40 | 0 |
2010-11-02 | Fracture | 608.80 | 619.50 | 0 |
2010-11-02 | Fracture | 573.60 | 600.90 | 0 |
2010-11-01 | Perforation | 439.70 | 440.20 | 13 |
2010-11-01 | Perforation | 457.50 | 458.50 | 13 |
2010-11-01 | Perforation | 493.50 | 494.00 | 13 |
2010-11-01 | Perforation | 497.90 | 498.90 | 13 |
2010-11-01 | Perforation | 460.30 | 460.80 | 13 |
2010-11-01 | Perforation | 471.60 | 472.10 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2010 | 24 | 0.0 | 0.0 | 0.0 |
2011 | 8455 | 0.0 | 0.0 | 0.0 |
2012 | 8645 | 0.0 | 0.0 | 0.0 |
2013 | 8694 | 0.0 | 0.0 | 0.0 |
2014 | 8685 | 0.0 | 0.0 | 0.0 |
2015 | 8545 | 0.0 | 0.0 | 0.0 |
2016 | 8667 | 0.0 | 0.0 | 0.0 |
2017 | 8582 | 0.0 | 0.0 | 0.0 |
2018 | 8604 | 0.0 | 0.0 | 0.0 |
2019 | 8672 | 0.0 | 0.0 | 0.0 |
2020 | 2156 | 0.0 | 0.0 | 0.0 |
For data sources see[5]