X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0304250302000

Well Details

Well ID: 0304250302000
Loading map...
Location: 00/02-03-030-25W4/0
Location Alias: 00/02-03-30-25 W4M
Location Alias 2: 00/02-03-030-25 W4/00
Country: Canada
Province: Alberta
Township: 030
Meridian: 4
Range: 25
Section: 03
County/Municipality: Kneehill County
Well Name: EMBER SD SWALWELL 2-3-30-25
Operator Name: Ember Resources Inc.
License Number: 0437547
License Date: 2011-10-07
License Status: Issued
Spud Date: 2011-11-29
Final Drill Date: 2011-11-30
Well Total Depth: 1153.00 m
Surface Hole Latitude: 51.531866
Surface Hole Longitude: -113.443080

For data sources see[1][2]

Well History

Date Event
2011-10-07 Obtained License
2011-11-29 Direction Drilling Operation Performed - Deviate
2011-11-29 Surface Casing Operation Performed
2011-11-30 Finished Drilling
2011-11-30 Production Casing Operation Performed
2011-11-30 Well Mode changed to Drilled and Cased
2011-12-01 Rig Released
2012-01-04 Perforation Treatment Performed - Jet Perforation
2012-01-12 Perforation Treatment Performed - Fractured
2012-01-31 Well Began Production
2012-01-31 Well Fluid changed to Coalbed Methane-Coals and Other
2012-01-31 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-11-29 0.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-01-04 Perforation 314.50 316.00 13
2012-01-04 Perforation 517.60 518.60 13
2012-01-04 Perforation 524.00 524.50 13
2012-01-04 Perforation 549.00 550.00 13
2012-01-04 Perforation 552.10 553.10 13
2012-01-04 Perforation 562.50 564.00 13
2012-01-04 Perforation 578.50 580.00 13
2012-01-04 Perforation 584.30 587.30 13
2012-01-04 Perforation 603.50 605.00 13
2012-01-04 Perforation 618.00 620.00 13
2012-01-04 Perforation 630.00 632.00 13
2012-01-04 Perforation 321.50 323.50 13
2012-01-04 Perforation 632.00 634.00 13
2012-01-04 Perforation 635.40 636.40 13
2012-01-04 Perforation 641.00 642.00 13
2012-01-04 Perforation 642.80 644.30 13
2012-01-04 Perforation 673.50 675.50 13
2012-01-04 Perforation 674.90 677.90 13
2012-01-04 Perforation 690.00 691.50 13
2012-01-04 Perforation 707.50 710.00 13
2012-01-04 Perforation 714.40 715.40 13
2012-01-04 Perforation 739.00 741.00 13
2012-01-04 Perforation 390.50 391.50 13
2012-01-04 Perforation 740.80 743.30 13
2012-01-04 Perforation 751.70 752.70 13
2012-01-04 Perforation 763.20 765.70 13
2012-01-04 Perforation 791.20 792.20 13
2012-01-04 Perforation 1067.00 1069.00 13
2012-01-04 Perforation 1113.00 1115.00 13
2012-01-12 Fracture 314.50 792.20 0
2012-01-04 Perforation 398.70 399.70 13
2012-01-04 Perforation 404.30 405.80 13
2012-01-04 Perforation 415.20 416.20 13
2012-01-04 Perforation 421.30 422.80 13
2012-01-04 Perforation 459.00 462.00 13
2012-01-04 Perforation 485.00 486.00 13

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 7146 0.0 0.0 0.0
2013 5908 0.0 0.0 0.0
2014 7983 0.0 0.0 0.0
2015 8735 0.0 0.0 0.0
2016 8757 0.0 0.0 0.0
2017 8721 0.0 0.0 0.0
2018 8686 0.0 0.0 0.0
2019 8704 0.0 0.0 0.0
2020 2180 0.0 0.0 0.0

For data sources see[6]

References