X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0304250213000

Well Details

Well ID: 0304250213000
Loading map...
Location: 00/13-02-030-25W4/0
Location Alias: 00/13-02-30-25 W4M
Location Alias 2: 00/13-02-030-25 W4/00
Country: Canada
Province: Alberta
Township: 030
Meridian: 4
Range: 25
Section: 02
County/Municipality: Kneehill County
Well Name: EMBER SD TWINING 13-2-30-25
Operator Name: Ember Resources Inc.
License Number: 0437124
License Date: 2011-09-23
License Status: Issued
Spud Date: 2011-11-23
Final Drill Date: 2011-11-24
Well Total Depth: 1089.00 m
Surface Hole Latitude: 51.545518
Surface Hole Longitude: -113.414894

For data sources see[1][2]

Well History

Date Event
2011-09-23 Obtained License
2011-11-23 Direction Drilling Operation Performed - Deviate
2011-11-23 Surface Casing Operation Performed
2011-11-24 Finished Drilling
2011-11-24 Production Casing Operation Performed
2011-11-24 Well Mode changed to Drilled and Cased
2011-11-25 Rig Released
2011-12-19 Perforation Treatment Performed - Jet Perforation
2012-01-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-01-03 Perforation Treatment Performed - Jet Perforation
2012-01-06 Perforation Treatment Performed - Fractured
2012-01-20 Well Began Production
2012-01-20 Well Fluid changed to Coalbed Methane-Coals and Other
2012-01-20 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-11-23 0.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-12-19 Perforation 774.80 775.80 13
2012-01-03 Perforation 417.00 418.00 13
2012-01-03 Perforation 420.50 422.00 13
2012-01-03 Perforation 426.70 428.20 13
2012-01-03 Perforation 490.30 491.30 13
2012-01-03 Perforation 492.80 493.30 13
2012-01-03 Perforation 510.30 511.30 13
2012-01-03 Perforation 530.00 532.00 13
2012-01-03 Perforation 538.00 541.00 13
2012-01-03 Perforation 566.40 567.90 13
2012-01-03 Perforation 574.80 575.80 13
2011-12-19 Perforation 969.00 972.00 13
2012-01-03 Perforation 591.90 593.90 13
2012-01-03 Perforation 612.20 613.20 13
2012-01-03 Perforation 640.80 642.30 13
2012-01-03 Perforation 647.10 649.10 13
2012-01-03 Perforation 665.00 667.00 13
2012-01-03 Perforation 673.50 675.50 13
2012-01-03 Perforation 678.50 681.50 13
2012-01-03 Perforation 700.20 701.70 13
2012-01-03 Perforation 705.00 705.50 13
2012-01-03 Perforation 721.40 722.40 13
2011-12-19 Perforation 1048.00 1049.00 13
2012-01-03 Perforation 726.50 729.00 13
2012-01-03 Perforation 736.00 737.00 13
2012-01-03 Perforation 746.40 747.90 13
2012-01-03 Perforation 754.00 754.50 13
2012-01-03 Perforation 755.10 755.60 13
2012-01-03 Packing Device Capped w/Cement 957.00 965.00 0
2012-01-06 Fracture 317.10 318.10 0
2012-01-06 Fracture 344.00 345.50 0
2012-01-06 Fracture 369.00 372.00 0
2012-01-06 Fracture 373.00 375.00 0
2011-12-19 Perforation 1050.00 1051.00 13
2012-01-06 Fracture 396.30 397.30 0
2012-01-06 Fracture 417.00 418.00 0
2012-01-06 Fracture 420.50 422.00 0
2012-01-06 Fracture 426.70 428.20 0
2012-01-06 Fracture 490.30 491.30 0
2012-01-06 Fracture 492.80 493.30 0
2012-01-06 Fracture 510.30 511.30 0
2012-01-06 Fracture 530.00 532.00 0
2012-01-06 Fracture 538.00 541.00 0
2012-01-06 Fracture 566.40 567.90 0
2012-01-03 Perforation 317.10 318.10 13
2012-01-06 Fracture 574.80 575.80 0
2012-01-06 Fracture 591.90 593.90 0
2012-01-06 Fracture 612.20 613.20 0
2012-01-06 Fracture 640.80 642.30 0
2012-01-06 Fracture 647.10 649.10 0
2012-01-06 Fracture 665.00 667.00 0
2012-01-06 Fracture 673.50 675.50 0
2012-01-06 Fracture 678.50 681.50 0
2012-01-06 Fracture 700.20 701.70 0
2012-01-06 Fracture 705.00 705.50 0
2012-01-03 Perforation 344.00 345.50 13
2012-01-06 Fracture 721.40 722.40 0
2012-01-06 Fracture 726.50 729.00 0
2012-01-06 Fracture 736.00 737.00 0
2012-01-06 Fracture 746.40 747.90 0
2012-01-06 Fracture 754.00 754.50 0
2012-01-06 Fracture 755.10 755.60 0
2012-01-06 Fracture 774.80 775.80 0
2012-01-03 Perforation 369.00 372.00 13
2012-01-03 Perforation 373.00 375.00 13
2012-01-03 Perforation 396.30 397.30 13

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 8161 0.0 0.0 0.0
2013 8504 0.0 0.0 0.0
2014 8197 0.0 0.0 0.0
2015 8744 0.0 0.0 0.0
2016 8757 0.0 0.0 0.0
2017 8721 0.0 0.0 0.0
2018 8710 0.0 0.0 0.0
2019 8703 0.0 0.0 0.0
2020 2180 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-01-09 No Incident Encountered 0.00 0.00

For data sources see[7]

References