If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0304250203000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.5392,"lon":-113.422704,"icon":""}]} |
Location: 00/03-02-030-25W4/0 | |
Location Alias: 00/03-02-30-25 W4M | |
Location Alias 2: 00/03-02-030-25 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 030 | |
Meridian: 4 | |
Range: 25 | |
Section: 02 | |
County/Municipality: Kneehill County | |
Well Name: EMBER SD TWINING 3-2-30-25 | |
Operator Name: Ember Resources Inc. | |
License Number: 0437007 | |
License Date: 2011-09-21 | |
License Status: Issued | |
Spud Date: 2011-11-27 | |
Final Drill Date: 2011-11-28 | |
Well Total Depth: 1065.00 m | |
Surface Hole Latitude: 51.539200 | |
Surface Hole Longitude: -113.422704 |
Date | Event |
---|---|
2011-09-21 | Obtained License |
2011-11-27 | Direction Drilling Operation Performed - Deviate |
2011-11-27 | Surface Casing Operation Performed |
2011-11-28 | Finished Drilling |
2011-11-28 | Production Casing Operation Performed |
2011-11-28 | Rig Released |
2011-11-28 | Well Mode changed to Drilled and Cased |
2012-01-03 | Perforation Treatment Performed - Jet Perforation |
2012-01-04 | Perforation Treatment Performed - Jet Perforation |
2012-01-07 | Perforation Treatment Performed - Fractured |
2012-01-24 | Well Began Production |
2012-01-24 | Well Fluid changed to Coalbed Methane-Coals and Other |
2012-01-24 | Well Mode changed to Flowing |
2015-09-25 | Well Log Performed |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2011-11-27 | 0.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-01-03 | Perforation | 575.00 | 576.50 | 13 |
2012-01-03 | Perforation | 668.50 | 669.50 | 13 |
2012-01-03 | Perforation | 693.10 | 696.10 | 13 |
2012-01-03 | Perforation | 704.70 | 705.70 | 13 |
2012-01-03 | Perforation | 713.60 | 715.60 | 13 |
2012-01-03 | Perforation | 721.50 | 722.50 | 13 |
2012-01-03 | Perforation | 723.20 | 723.70 | 13 |
2012-01-03 | Perforation | 737.10 | 737.60 | 13 |
2012-01-03 | Perforation | 743.20 | 744.20 | 13 |
2012-01-03 | Perforation | 862.00 | 863.50 | 13 |
2012-01-03 | Perforation | 927.00 | 928.00 | 13 |
2012-01-03 | Perforation | 591.50 | 592.50 | 13 |
2012-01-03 | Perforation | 997.00 | 999.00 | 13 |
2012-01-04 | Perforation | 353.30 | 354.30 | 13 |
2012-01-04 | Perforation | 356.60 | 357.60 | 13 |
2012-01-04 | Perforation | 360.40 | 361.40 | 13 |
2012-01-04 | Perforation | 367.40 | 368.40 | 13 |
2012-01-04 | Perforation | 379.90 | 381.90 | 13 |
2012-01-04 | Perforation | 386.30 | 387.30 | 13 |
2012-01-04 | Perforation | 395.10 | 396.60 | 13 |
2012-01-04 | Perforation | 426.50 | 429.50 | 13 |
2012-01-04 | Perforation | 440.20 | 440.70 | 13 |
2012-01-03 | Perforation | 598.40 | 599.90 | 13 |
2012-01-04 | Perforation | 447.90 | 449.90 | 13 |
2012-01-04 | Perforation | 450.40 | 450.90 | 13 |
2012-01-04 | Perforation | 470.50 | 472.00 | 13 |
2012-01-04 | Perforation | 476.50 | 478.00 | 13 |
2012-01-04 | Perforation | 507.00 | 508.50 | 13 |
2012-01-04 | Perforation | 516.90 | 517.90 | 13 |
2012-01-04 | Perforation | 520.90 | 523.90 | 13 |
2012-01-04 | Perforation | 530.30 | 530.80 | 13 |
2012-01-04 | Perforation | 533.10 | 533.60 | 13 |
2012-01-04 | Perforation | 544.20 | 546.70 | 13 |
2012-01-03 | Perforation | 612.30 | 612.80 | 13 |
2012-01-04 | Perforation | 563.40 | 564.90 | 13 |
2012-01-07 | Fracture | 353.30 | 744.20 | 0 |
2012-01-03 | Perforation | 624.60 | 626.60 | 13 |
2012-01-03 | Perforation | 626.60 | 628.60 | 13 |
2012-01-03 | Perforation | 639.50 | 640.50 | 13 |
2012-01-03 | Perforation | 642.00 | 644.00 | 13 |
2012-01-03 | Perforation | 663.20 | 664.70 | 13 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 8110 | 0.0 | 0.0 | 0.0 |
2013 | 8254 | 0.0 | 0.0 | 0.0 |
2014 | 7782 | 0.0 | 0.0 | 0.0 |
2015 | 8744 | 0.0 | 0.0 | 0.0 |
2016 | 8757 | 0.0 | 0.0 | 0.0 |
2017 | 8721 | 0.0 | 0.0 | 0.0 |
2018 | 8710 | 0.0 | 0.0 | 0.0 |
2019 | 8703 | 0.0 | 0.0 | 0.0 |
2020 | 2180 | 0.0 | 0.0 | 0.0 |
For data sources see[6]