If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0304250103000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.53324,"lon":-113.39657,"icon":""}]} |
Location: 00/03-01-030-25W4/0 | |
Location Alias: 00/03-01-30-25 W4M | |
Location Alias 2: 00/03-01-030-25 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 030 | |
Meridian: 4 | |
Range: 25 | |
Section: 01 | |
County/Municipality: Kneehill County | |
Well Name: EMBER TWINING 3-1-30-25 | |
Operator Name: Ember Resources Inc. | |
License Number: 0425712 | |
License Date: 2010-11-10 | |
License Status: Issued | |
Spud Date: 2010-12-10 | |
Final Drill Date: 2010-12-12 | |
Well Total Depth: 872.00 m | |
Surface Hole Latitude: 51.533240 | |
Surface Hole Longitude: -113.396570 |
Date | Event |
---|---|
2010-11-10 | Obtained License |
2010-12-10 | Surface Casing Operation Performed |
2010-12-12 | Finished Drilling |
2010-12-12 | Well Mode changed to Drilled and Cased |
2010-12-13 | Production Casing Operation Performed |
2010-12-13 | Rig Released |
2010-12-22 | Well Log Performed |
2011-02-04 | Perforation Treatment Performed - Jet Perforation |
2011-02-10 | Perforation Treatment Performed - Jet Perforation |
2011-02-22 | Perforation Treatment Performed - Fractured |
2011-02-25 | Well Fluid changed to Coalbed Methane-Coals and Other |
2011-02-25 | Well Mode changed to Testing |
2011-03-04 | Well Began Production |
2011-03-04 | Well Fluid changed to Coalbed Methane-Coals and Other |
2011-03-04 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-02-04 | Perforation | 843.00 | 844.00 | 13 |
2011-02-10 | Perforation | 256.60 | 257.60 | 13 |
2011-02-10 | Perforation | 271.00 | 272.00 | 13 |
2011-02-10 | Perforation | 436.00 | 437.00 | 13 |
2011-02-10 | Perforation | 253.20 | 254.20 | 13 |
2011-02-10 | Perforation | 309.70 | 310.70 | 13 |
2011-02-10 | Perforation | 318.50 | 319.50 | 13 |
2011-02-10 | Perforation | 274.00 | 275.00 | 13 |
2011-02-10 | Perforation | 283.10 | 284.10 | 13 |
2011-02-10 | Perforation | 508.30 | 509.30 | 13 |
2011-02-10 | Perforation | 498.60 | 500.60 | 13 |
2011-02-10 | Perforation | 369.50 | 370.50 | 13 |
2011-02-10 | Perforation | 487.10 | 489.10 | 13 |
2011-02-10 | Perforation | 515.60 | 517.10 | 13 |
2011-02-10 | Perforation | 786.00 | 787.00 | 13 |
2011-02-10 | Perforation | 552.20 | 552.70 | 13 |
2011-02-10 | Perforation | 522.80 | 523.30 | 13 |
2011-02-10 | Perforation | 470.50 | 471.50 | 13 |
2011-02-10 | Perforation | 423.20 | 425.20 | 13 |
2011-02-10 | Perforation | 419.40 | 421.90 | 13 |
2011-02-10 | Perforation | 398.00 | 399.00 | 13 |
2011-02-10 | Perforation | 431.60 | 432.10 | 13 |
2011-02-10 | Perforation | 370.90 | 371.90 | 13 |
2011-02-10 | Perforation | 444.50 | 446.00 | 13 |
2011-02-10 | Perforation | 468.40 | 469.40 | 13 |
2011-02-10 | Perforation | 440.00 | 442.00 | 13 |
2011-02-22 | Fracture | 436.00 | 437.00 | 0 |
2011-02-22 | Fracture | 552.20 | 552.70 | 0 |
2011-02-22 | Fracture | 253.20 | 523.30 | 0 |
2011-02-10 | Perforation | 340.40 | 341.40 | 13 |
2011-02-10 | Perforation | 364.90 | 366.40 | 13 |
2011-02-10 | Perforation | 389.50 | 391.00 | 13 |
2011-02-10 | Perforation | 392.00 | 393.50 | 13 |
2011-02-10 | Perforation | 373.20 | 374.20 | 13 |
2011-02-10 | Perforation | 384.90 | 385.90 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 7283 | 0.0 | 0.0 | 0.0 |
2012 | 8668 | 0.0 | 0.0 | 0.0 |
2013 | 8751 | 0.0 | 0.0 | 0.0 |
2014 | 8734 | 0.0 | 0.0 | 0.0 |
2015 | 8735 | 0.0 | 0.0 | 0.0 |
2016 | 8757 | 0.0 | 0.0 | 0.0 |
2017 | 8721 | 0.0 | 0.0 | 0.0 |
2018 | 8710 | 0.0 | 0.0 | 0.0 |
2019 | 8703 | 0.0 | 0.0 | 0.0 |
2020 | 2180 | 0.0 | 0.0 | 0.0 |
For data sources see[5]