X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0304242514020

Well Details

Well ID: 0304242514020
Loading map...
Location: 02/14-25-030-24W4/0
Location Alias: 02/14-25-30-24 W4M
Location Alias 2: 02/14-25-030-24 W4/00
Country: Canada
Province: Alberta
Township: 030
Meridian: 4
Range: 24
Section: 25
County/Municipality: Kneehill County
Well Name: EMBER 102 TWINING 14-25-30-24
Operator Name: Ember Resources Inc.
License Number: 0340151
License Date: 2005-10-15
License Status: Issued
Spud Date: 2005-10-29
Final Drill Date: 2005-10-31
Well Total Depth: 821.00 m
Surface Hole Latitude: 51.604665
Surface Hole Longitude: -113.256356

For data sources see[1][2]

Well History

Date Event
2005-10-15 Obtained License
2005-10-26 Surface Casing Operation Performed
2005-10-31 Finished Drilling
2005-10-31 Production Casing Operation Performed
2005-10-31 Rig Released
2005-10-31 Well Mode changed to Drilled and Cased
2005-11-07 Well Log Performed
2005-11-28 Perforation Treatment Performed - Jet Perforation
2005-12-03 Perforation Treatment Performed - Fractured
2006-04-12 Well Began Production
2006-04-12 Well Fluid changed to Coalbed Methane-Coals and Other
2006-04-12 Well Mode changed to Flowing
2006-07-11 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2005-11-28 Perforation 288.00 289.00 14
2005-11-28 Perforation 394.90 395.40 14
2005-11-28 Perforation 399.90 400.90 14
2005-11-28 Perforation 428.50 429.50 14
2005-11-28 Perforation 443.50 444.00 14
2005-11-28 Perforation 452.50 453.50 14
2005-11-28 Perforation 459.60 460.10 14
2005-11-28 Perforation 467.00 467.50 14
2005-11-28 Perforation 468.50 469.00 14
2005-11-28 Perforation 476.00 477.00 14
2005-12-03 Fracture 476.00 477.00 0
2005-11-28 Perforation 309.00 313.00 14
2005-12-03 Fracture 467.00 469.00 0
2005-12-03 Fracture 459.60 460.10 0
2005-12-03 Fracture 386.00 388.70 0
2005-12-03 Fracture 452.50 453.50 0
2005-12-03 Fracture 443.50 444.00 0
2005-12-03 Fracture 428.50 429.50 0
2005-12-03 Fracture 399.90 400.60 0
2005-12-03 Fracture 394.90 395.40 0
2005-12-03 Fracture 390.00 394.50 0
2005-12-03 Fracture 382.00 382.50 0
2005-11-28 Perforation 325.80 326.80 14
2005-12-03 Fracture 349.20 349.70 0
2005-12-03 Fracture 330.00 331.00 0
2005-12-03 Fracture 325.80 326.80 0
2005-12-03 Fracture 309.00 313.00 0
2005-12-03 Fracture 288.00 289.00 0
2005-11-28 Perforation 330.00 331.00 14
2005-11-28 Perforation 349.20 349.70 14
2005-11-28 Perforation 382.00 382.50 14
2005-11-28 Perforation 386.00 387.00 14
2005-11-28 Perforation 388.20 388.70 14
2005-11-28 Perforation 390.00 394.50 14

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2006 6336 0.0 0.0 0.0
2007 8759 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 8759 0.0 0.0 0.0
2011 8753 0.0 0.0 0.0
2012 8768 0.0 0.0 0.0
2013 8735 0.0 0.0 0.0
2014 8749 0.0 0.0 0.0
2015 8758 0.0 0.0 0.0
2016 8746 0.0 0.0 0.0
2017 8741 0.0 0.0 0.0
2018 8747 0.0 0.0 0.0
2019 8727 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References