If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0304241506002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.568452,"lon":-113.301358,"icon":""}]} |
Location: 00/06-15-030-24W4/2 | |
Location Alias: 00/06-15-30-24 W4M | |
Location Alias 2: 00/06-15-030-24 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 030 | |
Meridian: 4 | |
Range: 24 | |
Section: 15 | |
County/Municipality: Kneehill County | |
Well Name: EMBER TWINING 6-15-30-24 | |
Operator Name: Ember Resources Inc. | |
License Number: 0337600 | |
License Date: 2005-09-01 | |
License Status: Amended | |
Spud Date: 2005-09-24 | |
Final Drill Date: 2005-09-29 | |
Well Total Depth: 911.00 m | |
Surface Hole Latitude: 51.568452 | |
Surface Hole Longitude: -113.301358 |
Date | Event |
---|---|
2005-09-01 | Obtained License |
2005-09-24 | Surface Casing Operation Performed |
2005-09-29 | Finished Drilling |
2005-09-29 | Production Casing Operation Performed |
2005-09-29 | Rig Released |
2005-09-29 | Well Mode changed to Drilled and Cased |
2005-11-24 | Well Log Performed |
2005-12-20 | Perforation Treatment Performed - Jet Perforation |
2006-01-16 | Perforation Treatment Performed - Jet Perforation |
2006-02-10 | Perforation Treatment Performed - Fractured |
2006-02-28 | Well Began Production |
2006-02-28 | Well Fluid changed to Coalbed Methane-Coals Only |
2006-02-28 | Well Mode changed to Flowing |
2008-02-13 | Well Structure changed to Commingled |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2005-12-20 | Perforation | 869.20 | 870.70 | 14 |
2006-01-16 | Perforation | 507.50 | 508.00 | 14 |
2006-01-16 | Perforation | 536.00 | 537.00 | 14 |
2006-01-16 | Perforation | 542.50 | 543.00 | 14 |
2006-01-16 | Perforation | 547.60 | 548.10 | 14 |
2006-01-16 | Perforation | 552.50 | 553.00 | 14 |
2006-02-10 | Fracture | 869.20 | 870.70 | 0 |
2006-02-10 | Fracture | 552.50 | 553.00 | 0 |
2006-02-10 | Fracture | 547.60 | 548.10 | 0 |
2006-02-10 | Fracture | 542.50 | 543.00 | 0 |
2006-02-10 | Fracture | 536.00 | 537.00 | 0 |
2006-01-16 | Perforation | 398.70 | 400.20 | 14 |
2006-02-10 | Fracture | 507.50 | 508.00 | 0 |
2006-02-10 | Fracture | 479.00 | 481.00 | 0 |
2006-02-10 | Fracture | 469.20 | 470.20 | 0 |
2006-02-10 | Fracture | 432.50 | 433.50 | 0 |
2006-02-10 | Fracture | 428.50 | 429.00 | 0 |
2006-02-10 | Fracture | 413.00 | 414.00 | 0 |
2006-02-10 | Fracture | 410.00 | 410.50 | 0 |
2006-02-10 | Fracture | 405.00 | 406.00 | 0 |
2006-02-10 | Fracture | 398.70 | 400.20 | 0 |
2006-01-16 | Perforation | 405.00 | 406.00 | 14 |
2006-01-16 | Perforation | 410.00 | 410.50 | 14 |
2006-01-16 | Perforation | 413.00 | 414.00 | 14 |
2006-01-16 | Perforation | 428.50 | 429.00 | 14 |
2006-01-16 | Perforation | 432.50 | 433.50 | 14 |
2006-01-16 | Perforation | 469.20 | 470.20 | 14 |
2006-01-16 | Perforation | 479.00 | 481.00 | 14 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2006 | 7367 | 0.0 | 0.0 | 0.0 |
2007 | 8759 | 0.0 | 0.0 | 0.0 |
2008 | 1032 | 0.0 | 0.0 | 0.0 |
For data sources see[5]