X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0304241106000

Well Details

Well ID: 0304241106000
Loading map...
Location: 00/06-11-030-24W4/0
Location Alias: 00/06-11-30-24 W4M
Location Alias 2: 00/06-11-030-24 W4/00
Country: Canada
Province: Alberta
Township: 030
Meridian: 4
Range: 24
Section: 11
County/Municipality: Kneehill County
Well Name: EMBER TWINING 6-11-30-24
Operator Name: Ember Resources Inc.
License Number: 0337572
License Date: 2005-09-01
License Status: Issued
Spud Date: 2005-10-12
Final Drill Date: 2005-10-15
Well Total Depth: 883.00 m
Surface Hole Latitude: 51.553754
Surface Hole Longitude: -113.275670

For data sources see[1][2]

Well History

Date Event
2005-09-01 Obtained License
2005-10-12 Surface Casing Operation Performed
2005-10-15 Finished Drilling
2005-10-15 Well Mode changed to Drilled and Cased
2005-10-16 Production Casing Operation Performed
2005-10-16 Rig Released
2005-10-27 Well Log Performed
2005-12-03 Perforation Treatment Performed - Jet Perforation
2005-12-04 Perforation Treatment Performed - Jet Perforation
2005-12-09 Perforation Treatment Performed - Fractured
2005-12-21 Well Began Production
2005-12-21 Well Fluid changed to Coalbed Methane-Coals and Other
2005-12-21 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2005-12-03 Perforation 519.00 520.00 14
2005-12-04 Perforation 404.00 405.00 14
2005-12-04 Perforation 415.50 418.00 14
2005-12-04 Perforation 440.70 441.70 14
2005-12-04 Perforation 451.70 452.20 14
2005-12-04 Perforation 453.20 454.70 14
2005-12-04 Perforation 458.00 459.50 14
2005-12-04 Perforation 483.50 484.00 14
2005-12-04 Perforation 512.20 513.20 14
2005-12-09 Fracture 525.00 528.30 0
2005-12-09 Fracture 519.00 520.00 0
2005-12-03 Perforation 525.00 525.50 14
2005-12-09 Fracture 512.20 513.20 0
2005-12-09 Fracture 483.50 484.00 0
2005-12-09 Fracture 458.00 459.50 0
2005-12-09 Fracture 451.70 454.70 0
2005-12-09 Fracture 440.70 441.70 0
2005-12-09 Fracture 415.50 418.00 0
2005-12-09 Fracture 404.00 405.00 0
2005-12-09 Fracture 395.50 396.00 0
2005-12-09 Fracture 389.00 390.00 0
2005-12-09 Fracture 330.60 332.60 0
2005-12-03 Perforation 527.80 528.30 14
2005-12-09 Fracture 287.40 287.90 0
2005-12-09 Fracture 273.00 274.00 0
2005-12-09 Fracture 177.50 178.00 0
2005-12-04 Perforation 177.50 178.00 14
2005-12-04 Perforation 273.00 274.00 14
2005-12-04 Perforation 287.40 287.90 14
2005-12-04 Perforation 330.60 332.60 14
2005-12-04 Perforation 389.00 390.00 14
2005-12-04 Perforation 395.50 396.00 14

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2005 264 0.0 0.0 0.0
2006 7296 0.0 0.0 0.0
2007 8759 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 8759 0.0 0.0 0.0
2011 8735 0.0 0.0 0.0
2012 8653 0.0 0.0 0.0
2013 8759 0.0 0.0 0.0
2014 8751 0.0 0.0 0.0
2015 8754 0.0 0.0 0.0
2016 8778 0.0 0.0 0.0
2017 8696 0.0 0.0 0.0
2018 8701 0.0 0.0 0.0
2019 8577 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References