X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0304240808003

Well Details

Well ID: 0304240808003
Loading map...
Location: 00/08-08-030-24W4/3
Location Alias: 00/08-08-30-24 W4M
Location Alias 2: 00/08-08-030-24 W4/03
Country: Canada
Province: Alberta
Township: 030
Meridian: 4
Range: 24
Section: 08
County/Municipality: Kneehill County
Well Name: EMBER SWALWELL 8-8-30-24
Operator Name: Ember Resources Inc.
License Number: 0066416
License Date: 1977-10-28
License Status: Abandoned
Spud Date: 1978-04-01
Final Drill Date: 1978-04-10
Well Total Depth: 1704.40 m
Surface Hole Latitude: 51.552735
Surface Hole Longitude: -113.336888

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1977-10-28 Obtained License
1978-04-10 Finished Drilling
1978-04-10 Well Mode changed to Drilled and Cased
1978-04-11 Drill Stem Test Performed
1978-04-11 Well Log Performed
1978-04-12 Drill Stem Test Performed
1978-04-13 Drill Stem Test Performed
1978-04-14 Production Casing Operation Performed
1978-06-16 Perforation Treatment Performed - Jet Perforation
1978-06-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-11-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1980-11-23 Perforation Treatment Performed - Jet Perforation
2003-02-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-02-26 Plug Back Performed
2003-02-27 Perforation Treatment Performed - Jet Perforation
2003-02-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-02-28 Perforation Treatment Performed - Jet Perforation
2003-02-28 Plug Back Performed
2003-03-05 Perforation Treatment Performed - Jet Perforation
2003-03-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-03-06 Perforation Treatment Performed - Jet Perforation
2003-03-06 Plug Back Performed
2003-03-06 Well Mode changed to Abandoned Zone
2003-03-07 Perforation Treatment Performed - Fractured
2011-02-06 Well Log Performed
2011-03-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-03-26 Perforation Treatment Performed - Jet Perforation
2011-03-26 Plug Back Performed
2011-06-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-06-01 Perforation Treatment Performed - Cement Squeeze
2011-06-01 Plug Back Performed
2011-06-03 Well Log Performed
2011-06-07 Perforation Treatment Performed - Jet Perforation
2011-06-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-06-08 Perforation Treatment Performed - Cement Squeeze
2011-06-08 Plug Back Performed
2011-06-09 Well Log Performed
2011-06-14 Perforation Treatment Performed - Jet Perforation
2011-06-14 Perforation Treatment Performed - Remedial Casing
2011-09-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-09-06 Well Log Performed
2011-09-20 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1978-06-16 Perforation 1649.90 1650.80 7
2003-02-27 Perforation 1472.20 1473.70 13
2003-02-28 Packing Device Capped w/Cement 1469.00 1469.50 0
2003-02-28 Perforation 1410.00 1411.20 13
2003-03-05 Perforation 1410.00 1411.80 13
2003-03-06 Packing Device Capped w/Cement 1401.50 1402.00 0
2003-03-06 Perforation 729.80 732.80 13
2003-03-07 Fracture 729.80 732.80 0
2011-03-26 Packing Device Capped w/Cement 712.00 720.80 0
2011-03-26 Perforation 535.00 535.50 13
2011-06-01 Cement Squeeze 535.00 535.50 0
1978-06-16 Perforation 1654.80 1656.90 7
2011-06-01 Packing Device Capped w/Cement 516.00 525.80 0
2011-06-07 Perforation 425.00 425.50 13
2011-06-08 Cement Squeeze 425.00 425.50 0
2011-06-08 Packing Device Capped w/Cement 408.00 419.30 0
2011-06-14 Perforation 350.00 351.00 13
2011-06-14 Remedial Casing Cementing 350.00 351.00 0
2011-09-06 Packing Device Capped w/Cement 62.00 70.00 0
1978-06-16 Perforation 1662.10 1663.60 7
1978-06-16 Perforation 1677.90 1680.40 7
1978-06-20 Acid Treatment 1649.90 1650.80 0
1978-06-20 Acid Treatment 1677.90 1680.40 0
1980-11-22 Packing Device Capped w/Cement 1648.80 1648.80 0
1980-11-23 Perforation 1641.70 1643.50 13
2003-02-26 Packing Device Capped w/Cement 1638.00 1638.50 0

For data sources see[4]



References