X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0304240506000

Well Details

Well ID: 0304240506000
Loading map...
Location: 00/06-05-030-24W4/0
Location Alias: 00/06-05-30-24 W4M
Location Alias 2: 00/06-05-030-24 W4/00
Country: Canada
Province: Alberta
Township: 030
Meridian: 4
Range: 24
Section: 05
County/Municipality: Kneehill County
Well Name: BUMPER ENRON SWALWELL 6-5-30-24
Operator Name: Marathon Canada Limited
License Number: 0051538
License Date: 1974-10-18
License Status: RecCertified
Spud Date: 1974-10-24
Final Drill Date: 1974-11-04
Well Total Depth: 1731.30 m
Surface Hole Latitude: 51.537985
Surface Hole Longitude: -113.348210

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1974-10-18 Obtained License
1974-11-04 Finished Drilling
1974-11-04 Well Mode changed to Drilled and Cased
1974-11-05 Drill Stem Test Performed
1974-11-06 Production Casing Operation Performed
1974-12-02 Perforation Treatment Performed - Jet Perforation
1974-12-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1974-12-12 Well Began Production
1974-12-12 Well Fluid changed to Crude Oil
1974-12-12 Well Mode changed to Flowing
1976-03-16 Well Fluid changed to Crude Oil
1976-03-16 Well Mode changed to Pumping
1976-03-17 Well Fluid changed to Crude Oil
1976-03-17 Well Mode changed to Pumping
1987-06-26 Perforation Treatment Performed - Jet Perforation
1987-06-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-07-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-05-31 Well Fluid changed to Crude Oil
1993-05-31 Well Mode changed to Suspended
1994-09-16 Perforation Treatment Performed - Cement Plug
1994-09-16 Plug Back Performed
1994-09-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-09-24 Perforation Treatment Performed - Jet Perforation
1994-09-24 Plug Back Performed
1994-09-24 Well Log Performed
1994-09-26 Perforation Treatment Performed - Cement Plug
1994-09-26 Perforation Treatment Performed - Remedial Casing
1994-09-26 Well Fluid changed to Crude Oil
1994-09-26 Well Mode changed to Abandoned
1994-09-28 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1974-12-02 Perforation 1651.40 1656.60 3
1994-09-26 Remedial Casing Cementing 300.00 301.00 0
1994-09-26 Cement Plug 270.00 301.00 0
1974-12-02 Perforation 1659.00 1661.80 3
1974-12-03 Acid Treatment 1651.40 1661.80 0
1987-06-26 Perforation 1693.50 1695.90 13
1987-06-27 Acid Treatment 1651.40 1695.90 0
1987-07-01 Acid Treatment 1693.50 1695.90 0
1994-09-16 Cement Plug 1680.00 1710.00 0
1994-09-24 Packing Device Capped w/Cement 1632.00 1640.00 0
1994-09-24 Perforation 300.00 301.00 10

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1974 184 0.0 0.0 0.0
1975 6440 0.0 0.0 0.0
1976 6525 0.0 0.0 0.0
1977 6133 0.0 0.0 0.0
1978 6015 0.0 0.0 0.0
1979 6362 0.0 0.0 0.0
1980 5035 0.0 0.0 0.0
1981 7759 0.0 0.0 0.0
1982 7144 0.0 0.0 0.0
1983 7313 0.0 0.0 0.0
1984 8443 0.0 0.0 0.0
1985 7030 0.0 0.0 0.0
1986 1872 0.0 0.0 0.0
1987 3846 0.0 0.0 0.0
1988 8461 0.0 0.0 0.0
1989 4255 0.0 0.0 0.0
1990 876 0.0 0.0 0.0

For data sources see[5]

References