X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0304240208000

Well Details

Well ID: 0304240208000
Loading map...
Location: 00/08-02-030-24W4/0
Location Alias: 00/08-02-30-24 W4M
Location Alias 2: 00/08-02-030-24 W4/00
Country: Canada
Province: Alberta
Township: 030
Meridian: 4
Range: 24
Section: 02
County/Municipality: Kneehill County
Well Name: EMBER TWINING 8-2-30-24
Operator Name: Ember Resources Inc.
License Number: 0335206
License Date: 2005-07-25
License Status: Issued
Spud Date: 2005-08-02
Final Drill Date: 2005-08-23
Well Total Depth: 868.00 m
Surface Hole Latitude: 51.539360
Surface Hole Longitude: -113.264810

For data sources see[1][2]

Well History

Date Event
2005-07-25 Obtained License
2005-08-02 Surface Casing Operation Performed
2005-08-22 Production Casing Operation Performed
2005-08-23 Finished Drilling
2005-08-23 Rig Released
2005-08-23 Well Mode changed to Drilled and Cased
2005-08-31 Well Log Performed
2005-09-19 Perforation Treatment Performed - Jet Perforation
2005-09-20 Perforation Treatment Performed - Jet Perforation
2005-09-25 Perforation Treatment Performed - Fractured
2005-11-09 Well Log Performed
2005-12-15 Well Began Production
2005-12-15 Well Fluid changed to Coalbed Methane-Coals and Other
2005-12-15 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2005-09-19 Perforation 398.00 399.00 14
2005-09-19 Perforation 538.00 539.00 14
2005-09-20 Perforation 314.00 317.00 14
2005-09-20 Perforation 319.00 320.00 14
2005-09-20 Perforation 323.70 324.20 14
2005-09-20 Perforation 375.00 375.50 14
2005-09-20 Perforation 377.50 379.00 14
2005-09-20 Perforation 382.80 383.30 14
2005-09-20 Perforation 391.30 392.80 14
2005-09-20 Perforation 256.00 256.50 14
2005-09-20 Perforation 261.00 261.50 14
2005-09-19 Perforation 423.70 424.70 14
2005-09-25 Fracture 319.00 320.00 0
2005-09-25 Fracture 314.00 317.00 0
2005-09-25 Fracture 538.00 539.00 0
2005-09-25 Fracture 519.00 520.00 0
2005-09-25 Fracture 505.80 506.80 0
2005-09-25 Fracture 501.00 501.50 0
2005-09-25 Fracture 495.00 496.00 0
2005-09-25 Fracture 470.00 471.00 0
2005-09-25 Fracture 441.00 443.50 0
2005-09-25 Fracture 435.20 436.20 0
2005-09-19 Perforation 435.20 436.20 14
2005-09-25 Fracture 423.70 424.70 0
2005-09-25 Fracture 398.00 399.00 0
2005-09-25 Fracture 391.30 392.80 0
2005-09-25 Fracture 382.80 383.30 0
2005-09-25 Fracture 375.00 379.00 0
2005-09-25 Fracture 323.70 324.20 0
2005-09-25 Fracture 261.00 261.50 0
2005-09-25 Fracture 256.00 256.50 0
2005-09-19 Perforation 441.00 443.50 14
2005-09-19 Perforation 470.00 471.00 14
2005-09-19 Perforation 495.00 496.00 14
2005-09-19 Perforation 501.00 501.50 14
2005-09-19 Perforation 505.80 506.80 14
2005-09-19 Perforation 519.00 520.00 14

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2005 408 0.0 0.0 0.0
2006 8759 0.0 0.0 0.0
2007 8759 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 8759 0.0 0.0 0.0
2011 8759 0.0 0.0 0.0
2012 8714 0.0 0.0 0.0
2013 8759 0.0 0.0 0.0
2014 8751 0.0 0.0 0.0
2015 8754 0.0 0.0 0.0
2016 8778 0.0 0.0 0.0
2017 8696 0.0 0.0 0.0
2018 8701 0.0 0.0 0.0
2019 8577 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References