X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0304233216002

Well Details

Well ID: 0304233216002
Loading map...
Location: 00/16-32-030-23W4/2
Location Alias: 00/16-32-30-23 W4M
Location Alias 2: 00/16-32-030-23 W4/02
Country: Canada
Province: Alberta
Township: 030
Meridian: 4
Range: 23
Section: 32
County/Municipality: Kneehill County
Well Name: EMBER TWINING 16-32-30-23
Operator Name: Ember Resources Inc.
License Number: 0339933
License Date: 2005-10-13
License Status: Issued
Spud Date: 2005-10-17
Final Drill Date: 2006-01-28
Well Total Depth: 823.00 m
Surface Hole Latitude: 51.616994
Surface Hole Longitude: -113.198071

For data sources see[1][2]

Well History

Date Event
2005-10-13 Obtained License
2005-10-17 Surface Casing Operation Performed
2006-01-27 Production Casing Operation Performed
2006-01-28 Finished Drilling
2006-01-28 Rig Released
2006-01-28 Well Mode changed to Drilled and Cased
2006-02-07 Well Log Performed
2006-03-06 Perforation Treatment Performed - Jet Perforation
2006-03-15 Perforation Treatment Performed - Jet Perforation
2006-03-25 Perforation Treatment Performed - Fractured
2006-07-21 Well Began Production
2006-07-21 Well Fluid changed to Gas
2006-07-21 Well Mode changed to Flowing
2008-11-01 Well Structure changed to Commingled

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2006-03-06 Perforation 552.00 553.00 14
2006-03-15 Perforation 364.00 365.00 14
2006-03-15 Perforation 369.00 370.00 14
2006-03-15 Perforation 371.00 372.00 14
2006-03-15 Perforation 380.30 381.80 14
2006-03-15 Perforation 385.50 388.50 14
2006-03-15 Perforation 410.90 411.90 14
2006-03-15 Perforation 425.00 428.00 14
2006-03-15 Perforation 431.00 432.00 14
2006-03-15 Perforation 439.20 440.20 14
2006-03-15 Perforation 445.60 446.10 14
2006-03-06 Perforation 713.50 717.00 14
2006-03-15 Perforation 451.50 452.00 14
2006-03-15 Perforation 456.80 457.30 14
2006-03-15 Perforation 465.50 466.00 14
2006-03-15 Perforation 484.50 488.00 14
2006-03-25 Fracture 484.50 488.00 0
2006-03-25 Fracture 465.50 466.00 0
2006-03-25 Fracture 456.80 457.30 0
2006-03-25 Fracture 451.50 452.00 0
2006-03-25 Fracture 445.60 446.10 0
2006-03-25 Fracture 439.20 440.20 0
2006-03-06 Perforation 763.00 764.50 14
2006-03-25 Fracture 431.00 432.00 0
2006-03-25 Fracture 425.00 428.00 0
2006-03-25 Fracture 410.90 411.90 0
2006-03-25 Fracture 385.50 388.50 0
2006-03-25 Fracture 380.30 381.80 0
2006-03-25 Fracture 369.00 372.00 0
2006-03-25 Fracture 364.00 365.00 0
2006-03-25 Fracture 339.90 340.40 0
2006-03-25 Fracture 333.70 334.20 0
2006-03-25 Fracture 322.00 325.00 0
2006-03-15 Perforation 277.00 277.50 14
2006-03-25 Fracture 319.00 319.50 0
2006-03-25 Fracture 306.00 309.50 0
2006-03-25 Fracture 277.00 277.50 0
2006-03-15 Perforation 306.00 309.50 14
2006-03-15 Perforation 319.00 319.50 14
2006-03-15 Perforation 322.00 325.00 14
2006-03-15 Perforation 333.70 334.20 14
2006-03-15 Perforation 339.90 340.40 14

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2006 3936 0.0 0.0 0.0
2007 8759 0.0 0.0 0.0
2008 7319 0.0 0.0 0.0

For data sources see[5]

References