X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0304231906022

Well Details

Well ID: 0304231906022
Loading map...
Location: 02/06-19-030-23W4/2
Location Alias: 02/06-19-30-23 W4M
Location Alias 2: 02/06-19-030-23 W4/02
Country: Canada
Province: Alberta
Township: 030
Meridian: 4
Range: 23
Section: 19
County/Municipality: Kneehill County
Well Name: EMBER 102 GPINE 6-19-30-23
Operator Name: Ember Resources Inc.
License Number: 0336490
License Date: 2005-08-16
License Status: Issued
Spud Date: 2005-09-07
Final Drill Date: 2005-09-08
Well Total Depth: 844.00 m
Surface Hole Latitude: 51.582911
Surface Hole Longitude: -113.228684

For data sources see[1][2]

Well History

Date Event
2005-08-16 Obtained License
2005-09-07 Surface Casing Operation Performed
2005-09-08 Finished Drilling
2005-09-08 Production Casing Operation Performed
2005-09-08 Rig Released
2005-09-08 Well Mode changed to Drilled and Cased
2005-09-25 Well Log Performed
2005-10-12 Perforation Treatment Performed - Jet Perforation
2005-10-20 Perforation Treatment Performed - Jet Perforation
2005-10-29 Perforation Treatment Performed - Fractured
2005-11-24 Well Began Production
2005-11-24 Well Fluid changed to Coalbed Methane-Coals Only
2005-11-24 Well Mode changed to Flowing
2008-02-07 Well Structure changed to Commingled

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2005-10-12 Perforation 564.00 566.00 14
2005-10-20 Perforation 369.50 370.00 14
2005-10-20 Perforation 398.90 399.90 14
2005-10-20 Perforation 403.20 404.20 14
2005-10-20 Perforation 404.80 405.80 14
2005-10-20 Perforation 406.30 407.30 14
2005-10-20 Perforation 412.50 413.50 14
2005-10-20 Perforation 442.20 443.20 14
2005-10-20 Perforation 466.00 467.00 14
2005-10-20 Perforation 472.90 473.40 14
2005-10-20 Perforation 480.50 481.00 14
2005-10-12 Perforation 574.50 576.50 14
2005-10-20 Perforation 481.50 482.50 14
2005-10-20 Perforation 489.00 490.00 14
2005-10-29 Fracture 489.00 490.00 0
2005-10-29 Fracture 480.50 482.50 0
2005-10-29 Fracture 472.90 473.40 0
2005-10-29 Fracture 466.00 467.00 0
2005-10-29 Fracture 442.20 443.20 0
2005-10-29 Fracture 412.50 413.50 0
2005-10-29 Fracture 403.20 407.30 0
2005-10-29 Fracture 398.90 399.90 0
2005-10-12 Perforation 797.00 799.00 14
2005-10-29 Fracture 369.50 370.00 0
2005-10-29 Fracture 363.30 364.30 0
2005-10-29 Fracture 354.50 355.00 0
2005-10-29 Fracture 341.90 346.00 0
2005-10-29 Fracture 224.00 225.00 0
2005-10-12 Perforation 803.00 804.50 14
2005-10-20 Perforation 224.00 225.00 14
2005-10-20 Perforation 341.90 342.40 14
2005-10-20 Perforation 344.50 346.00 14
2005-10-20 Perforation 354.50 355.00 14
2005-10-20 Perforation 363.30 364.30 14

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2005 912 0.0 0.0 0.0
2006 8759 0.0 0.0 0.0
2007 8759 0.0 0.0 0.0
2008 888 0.0 0.0 0.0

For data sources see[5]

References