If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0304230204002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.534325,"lon":-113.142976,"icon":""}]} |
Location: 00/04-02-030-23W4/2 | |
Location Alias: 00/04-02-30-23 W4M | |
Location Alias 2: 00/04-02-030-23 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 030 | |
Meridian: 4 | |
Range: 23 | |
Section: 02 | |
County/Municipality: Kneehill County | |
Well Name: HUBER CP 40 ENTICE 4-2-30-23 | |
Operator Name: Pine Cliff Energy Ltd. | |
License Number: 0024931 | |
License Date: 1963-10-08 | |
License Status: Issued | |
Spud Date: 1964-02-19 | |
Final Drill Date: 1964-03-11 | |
Well Total Depth: 2072.60 m | |
Surface Hole Latitude: 51.534325 | |
Surface Hole Longitude: -113.142976 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1963-03-21 | Perforation Treatment Performed - Acid Wash - No Pressure |
1963-03-21 | Perforation Treatment Performed - Jet Perforation |
1963-03-22 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1963-10-08 | Obtained License |
1964-02-29 | Drill Stem Test Performed |
1964-03-11 | Finished Drilling |
1964-03-13 | Production Casing Operation Performed |
1965-11-12 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1965-11-12 | Perforation Treatment Performed - Jet Perforation |
1965-11-14 | Well Mode changed to Drilled and Cased |
1984-07-31 | Well Began Production |
1984-07-31 | Well Fluid changed to Gas |
1984-07-31 | Well Mode changed to Flowing |
1995-06-01 | Well Fluid changed to Gas |
1995-06-01 | Well Mode changed to Suspended |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1963-03-21 | Perforation | 1621.50 | 1626.40 | 3 |
1963-03-21 | Perforation | 1629.20 | 1632.50 | 3 |
1963-03-21 | Acid Wash | 1621.50 | 1632.50 | 0 |
1963-03-22 | Acid Treatment | 1621.50 | 1632.50 | 0 |
1965-11-12 | Packing Device Capped w/Cement | 1610.60 | 1610.60 | 0 |
1965-11-12 | Perforation | 1389.60 | 1392.30 | 7 |
1965-11-12 | Perforation | 1393.20 | 1394.50 | 7 |
1965-11-12 | Perforation | 1395.10 | 1396.00 | 7 |
1965-11-12 | Perforation | 1396.90 | 1397.80 | 7 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1968 | 0 | 0.0 | 0.0 | 0.0 |
1972 | 2 | 0.0 | 0.0 | 0.0 |
1976 | 3 | 0.0 | 0.0 | 0.0 |
1980 | 68 | 0.0 | 0.0 | 0.0 |
1982 | 216 | 0.0 | 0.0 | 0.0 |
1984 | 2453 | 0.0 | 0.0 | 0.0 |
1985 | 2689 | 0.0 | 0.0 | 0.0 |
1986 | 2062 | 0.0 | 0.0 | 0.0 |
1987 | 1917 | 0.0 | 0.0 | 0.0 |
1989 | 738 | 0.0 | 0.0 | 0.0 |
1991 | 89 | 0.0 | 0.0 | 0.0 |
1992 | 1333 | 0.0 | 0.0 | 0.0 |
For data sources see[5]