X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0304230204000

Well Details

Well ID: 0304230204000
Loading map...
Location: 00/04-02-030-23W4/0
Location Alias: 00/04-02-30-23 W4M
Location Alias 2: 00/04-02-030-23 W4/00
Country: Canada
Province: Alberta
Township: 030
Meridian: 4
Range: 23
Section: 02
County/Municipality: Kneehill County
Well Name: HUBER CP 40 ENTICE 4-2-30-23
Operator Name: Pine Cliff Energy Ltd.
License Number: 0024931
License Date: 1963-10-08
License Status: Issued
Spud Date: 1964-02-19
Final Drill Date: 1964-03-11
Well Total Depth: 2072.60 m
Surface Hole Latitude: 51.534325
Surface Hole Longitude: -113.142976

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1963-03-21 Perforation Treatment Performed - Acid Wash - No Pressure
1963-03-21 Perforation Treatment Performed - Jet Perforation
1963-03-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1963-10-08 Obtained License
1964-02-29 Drill Stem Test Performed
1964-03-11 Finished Drilling
1964-03-13 Production Casing Operation Performed
1964-03-21 Well Mode changed to Drilled and Cased
1965-11-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1965-11-12 Perforation Treatment Performed - Jet Perforation
1965-11-14 Well Mode changed to Drilled and Cased
1977-11-23 Well Began Production
1977-11-23 Well Fluid changed to Gas
1977-11-23 Well Mode changed to Flowing
2002-11-01 Well Fluid changed to Gas
2002-11-01 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1963-03-21 Perforation 1621.50 1626.40 3
1963-03-21 Perforation 1629.20 1632.50 3
1963-03-21 Acid Wash 1621.50 1632.50 0
1963-03-22 Acid Treatment 1621.50 1632.50 0
1965-11-12 Packing Device Capped w/Cement 1610.60 1610.60 0
1965-11-12 Perforation 1389.60 1392.30 7
1965-11-12 Perforation 1393.20 1394.50 7
1965-11-12 Perforation 1395.10 1396.00 7
1965-11-12 Perforation 1396.90 1397.80 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1976 47 0.0 0.0 0.0
1977 726 0.0 0.0 0.0
1978 7571 0.0 0.0 0.0
1979 3618 0.0 0.0 0.0
1980 2803 0.0 0.0 0.0
1981 3939 0.0 0.0 0.0
1982 5549 0.0 0.0 0.0
1983 576 0.0 0.0 0.0
1984 957 0.0 0.0 0.0
1985 862 0.0 0.0 0.0
1986 971 0.0 0.0 0.0
1987 1488 0.0 0.0 0.0
1988 5323 0.0 0.0 0.0
1989 2857 0.0 0.0 0.0
1990 6710 0.0 0.0 0.0
1991 6581 0.0 0.0 0.0
1992 4160 0.0 0.0 0.0
1993 4640 0.0 0.0 0.0
1994 4019 0.0 0.0 0.0
1995 1469 0.0 0.0 0.0
1996 5657 0.0 0.0 0.0
1997 8504 0.0 0.0 0.0
1998 2936 0.0 0.0 0.0
1999 7797 0.0 0.0 0.0
2000 8501 0.0 0.0 0.0
2001 8655 0.0 0.0 0.0
2002 8333 0.0 0.0 0.0
2003 7607 0.0 0.0 0.0
2004 8783 0.0 0.0 0.0
2005 8437 0.0 0.0 0.0
2006 8711 0.0 0.0 0.0
2007 8711 0.0 0.0 0.0
2008 8615 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 8759 0.0 0.0 0.0
2011 8156 0.0 0.0 0.0
2012 8598 0.0 0.0 0.0
2013 8371 0.0 0.0 0.0
2014 8704 0.0 0.0 0.0
2015 8752 0.0 0.0 0.0
2016 7952 0.0 0.0 0.0
2017 8735 0.0 0.0 0.0
2018 8759 0.0 0.0 0.0
2019 8739 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References