X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0304222316000

Well Details

Well ID: 0304222316000
Loading map...
Location: 00/16-23-030-22W4/0
Location Alias: 00/16-23-30-22 W4M
Location Alias 2: 00/16-23-030-22 W4/00
Country: Canada
Province: Alberta
Township: 030
Meridian: 4
Range: 22
Section: 23
County/Municipality: Kneehill County
Well Name: PINE CLIFF GPINE 16-23-30-22
Operator Name: Pine Cliff Energy Ltd.
License Number: 0401821
License Date: 2008-10-03
License Status: Issued
Spud Date: 2008-11-21
Final Drill Date: 2008-11-21
Well Total Depth: 707.00 m
Surface Hole Latitude: 51.589143
Surface Hole Longitude: -112.982907

For data sources see[1][2]

Well History

Date Event
2008-10-03 Obtained License
2008-11-21 Finished Drilling
2008-11-21 Production Casing Operation Performed
2008-11-21 Rig Released
2008-11-21 Well Mode changed to Drilled and Cased
2008-11-28 Well Log Performed
2008-12-06 Perforation Treatment Performed - Jet Perforation
2008-12-06 Well Log Performed
2008-12-09 Perforation Treatment Performed - Fractured
2009-12-02 Well Began Production
2009-12-02 Well Fluid changed to Gas
2009-12-02 Well Mode changed to Flowing
2010-02-01 Well Fluid changed to Gas
2010-02-01 Well Mode changed to Pumping
2011-11-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-11-06 Plug Back Performed
2011-11-06 Well Fluid changed to Gas
2011-11-06 Well Mode changed to Abandoned Zone
2011-11-15 Perforation Treatment Performed - Jet Perforation
2011-11-17 Perforation Treatment Performed - Jet Perforation
2011-12-21 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2008-12-06 Perforation 490.00 491.50 17
2011-11-15 Perforation 323.00 323.50 13
2011-11-15 Perforation 273.50 274.00 13
2011-11-15 Perforation 271.30 272.30 13
2011-11-15 Perforation 264.00 266.00 13
2011-11-15 Perforation 259.90 261.40 13
2011-11-15 Perforation 257.40 258.40 13
2011-11-15 Perforation 244.00 245.00 13
2011-11-15 Perforation 237.90 238.50 13
2011-11-15 Perforation 234.50 236.50 13
2011-11-17 Perforation 231.00 232.00 13
2008-12-09 Fracture 490.00 491.50 0
2011-11-17 Perforation 228.00 230.00 13
2011-11-17 Perforation 213.00 214.00 13
2011-11-17 Perforation 208.00 210.00 13
2011-12-21 Fracture 208.00 406.50 0
2011-11-06 Packing Device Capped w/Cement 477.00 485.00 0
2011-11-15 Perforation 405.50 406.50 13
2011-11-15 Perforation 398.90 399.90 13
2011-11-15 Perforation 394.00 395.00 13
2011-11-15 Perforation 361.90 362.90 13
2011-11-15 Perforation 346.00 346.50 13
2011-11-15 Perforation 338.00 339.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2009 332 0.0 0.0 0.0
2010 192 0.0 0.0 0.0

For data sources see[5]

References