X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0304211908000

Well Details

Well ID: 0304211908000
Loading map...
Location: 00/08-19-030-21W4/0
Location Alias: 00/08-19-30-21 W4M
Location Alias 2: 00/08-19-030-21 W4/00
Country: Canada
Province: Alberta
Township: 030
Meridian: 4
Range: 21
Section: 19
County/Municipality: Kneehill County
Well Name: PINE CLIFF GPINE 8-19-30-21
Operator Name: Pine Cliff Energy Ltd.
License Number: 0402080
License Date: 2008-10-09
License Status: Issued
Spud Date: 2008-11-10
Final Drill Date: 2008-11-10
Well Total Depth: 691.00 m
Surface Hole Latitude: 51.582967
Surface Hole Longitude: -112.935999

For data sources see[1][2]

Well History

Date Event
2008-10-09 Obtained License
2008-11-10 Finished Drilling
2008-11-10 Production Casing Operation Performed
2008-11-10 Well Mode changed to Drilled and Cased
2008-11-11 Rig Released
2008-11-24 Well Log Performed
2008-12-02 Well Log Performed
2008-12-06 Perforation Treatment Performed - Jet Perforation
2008-12-06 Well Log Performed
2008-12-10 Perforation Treatment Performed - Fractured
2009-02-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-02-07 Perforation Treatment Performed - Jet Perforation
2009-02-07 Plug Back Performed
2009-02-07 Well Mode changed to Abandoned Zone
2009-02-12 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2008-12-06 Perforation 637.00 640.00 17
2009-02-07 Perforation 320.00 321.00 13
2009-02-07 Perforation 261.00 263.00 13
2009-02-07 Perforation 259.00 260.00 13
2009-02-07 Perforation 245.50 247.50 13
2009-02-07 Perforation 239.50 240.50 13
2009-02-07 Perforation 235.50 236.50 13
2009-02-07 Perforation 226.50 227.50 13
2009-02-07 Perforation 223.50 224.00 13
2009-02-07 Perforation 214.00 215.00 13
2009-02-07 Perforation 207.00 209.00 13
2008-12-06 Perforation 572.50 573.50 17
2009-02-12 Fracture 207.00 390.50 0
2008-12-10 Fracture 572.50 640.00 0
2009-02-07 Packing Device Capped w/Cement 557.00 565.00 0
2009-02-07 Perforation 389.50 390.50 13
2009-02-07 Perforation 379.00 379.50 13
2009-02-07 Perforation 377.50 378.00 13
2009-02-07 Perforation 343.50 345.00 13
2009-02-07 Perforation 327.50 328.50 13

For data sources see[4]



References