X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0304042210000

Well Details

Well ID: 0304042210000
Loading map...
Location: 00/10-22-030-04W4/0
Location Alias: 00/10-22-30-04 W4M
Location Alias 2: 00/10-22-030-04 W4/00
Country: Canada
Province: Alberta
Township: 030
Meridian: 4
Range: 04
Section: 22
County/Municipality: Special Areas No. 3
Well Name: CNRL HUDSON 10-22-30-4
Operator Name: Canadian Natural Resources Limited
License Number: 0059817
License Date: 1976-08-19
License Status: Abandoned
Spud Date: 1976-08-25
Final Drill Date: 1976-08-29
Well Total Depth: 910.70 m
Surface Hole Latitude: 51.585715
Surface Hole Longitude: -110.484029

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1976-08-19 Obtained License
1976-08-29 Finished Drilling
1976-08-30 Drill Stem Test Performed
1976-08-31 Drill Stem Test Performed
1976-09-01 Production Casing Operation Performed
1976-11-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-11-02 Perforation Treatment Performed - Jet Perforation
1976-11-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1976-11-06 Perforation Treatment Performed - Jet Perforation
1976-11-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-11-08 Perforation Treatment Performed - Fractured
1976-11-19 Well Mode changed to Drilled and Cased
1978-08-01 Well Began Production
1978-08-01 Well Fluid changed to Gas
1978-08-01 Well Mode changed to Flowing
1978-08-18 Well Fluid changed to Gas
1978-08-18 Well Mode changed to Suspended
1978-09-03 Well Fluid changed to Gas
1978-09-03 Well Mode changed to Flowing
1986-01-22 Well Fluid changed to Gas
1986-01-22 Well Mode changed to Suspended
2006-11-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-11-28 Plug Back Performed
2006-11-28 Well Fluid changed to Gas
2006-11-28 Well Log Performed
2006-11-28 Well Mode changed to Abandoned Zone
2006-12-04 Perforation Treatment Performed - Jet Perforation
2006-12-05 Well Log Performed
2006-12-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-12-06 Plug Back Performed
2006-12-07 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1976-11-02 Perforation 833.30 835.80 7
1976-11-02 Acid Treatment 833.30 835.80 0
1976-11-05 Packing Device Capped w/Cement 810.80 810.80 0
1976-11-06 Perforation 735.50 737.90 7
1976-11-08 Acid Treatment 735.50 737.90 0
1976-11-08 Fracture 735.50 737.90 0
2006-11-28 Packing Device Capped w/Cement 723.00 731.00 0
2006-12-04 Perforation 160.00 161.00 17
2006-12-06 Packing Device Capped w/Cement 150.00 158.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1978 2538 0.0 0.0 0.0
1979 4566 0.0 0.0 0.0
1980 3730 0.0 0.0 0.0
1982 120 0.0 0.0 0.0
1983 1506 0.0 0.0 0.0
1988 1441 0.0 0.0 0.0

For data sources see[5]

References