X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0304033011000

Well Details

Well ID: 0304033011000
Loading map...
Location: 00/11-30-030-03W4/0
Location Alias: 00/11-30-30-03 W4M
Location Alias 2: 00/11-30-030-03 W4/00
Country: Canada
Province: Alberta
Township: 030
Meridian: 4
Range: 03
Section: 30
County/Municipality: Special Areas No. 3
Well Name: Canlin SEDALIA 11-30-30-3
Operator Name: Canlin Energy Corporation
License Number: 0204154
License Date: 1997-07-30
License Status: Abandoned
Spud Date: 1997-07-31
Final Drill Date: 1997-08-04
Well Total Depth: 937.00 m
Surface Hole Latitude: 51.600875
Surface Hole Longitude: -110.419716

For data sources see[1][2]

Well History

Date Event
1997-07-30 Obtained License
1997-08-01 Surface Casing Operation Performed
1997-08-04 Drill Stem Test Performed
1997-08-04 Finished Drilling
1997-08-04 Well Log Performed
1997-08-07 Production Casing Operation Performed
1997-08-07 Rig Released
1997-08-07 Well Mode changed to Drilled and Cased
1997-08-16 Well Log Performed
1997-08-17 Perforation Treatment Performed - Jet Perforation
1997-10-04 Well Log Performed
1997-10-05 Perforation Treatment Performed - Jet Perforation
1999-02-24 Well Began Production
1999-02-24 Well Fluid changed to Gas
1999-02-24 Well Mode changed to Flowing
2001-03-31 Well Fluid changed to Gas
2001-03-31 Well Mode changed to Suspended
2002-09-10 Well Fluid changed to Gas
2002-09-10 Well Mode changed to Flowing
2006-04-01 Well Fluid changed to Gas
2006-04-01 Well Mode changed to Suspended
2018-01-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2018-01-16 Plug Back Performed
2018-01-16 Well Fluid changed to Gas
2018-01-16 Well Log Performed
2018-01-16 Well Mode changed to Abandoned Zone
2018-01-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2018-01-17 Plug Back Performed
2018-01-17 Well Log Performed
2018-01-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2018-01-18 Plug Back Performed
2018-01-18 Well Log Performed
2018-01-21 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1997-08-17 Perforation 886.00 887.50 14
1997-10-05 Perforation 843.00 847.00 14
2018-01-16 Packing Device Capped w/Cement 862.80 871.20 0
2018-01-17 Packing Device Capped w/Cement 827.80 836.20 0
2018-01-17 Packing Device Capped w/Cement 426.80 435.20 0
2018-01-18 Packing Device Capped w/Cement 361.80 370.20 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1999 7335 0.0 0.0 0.0
2000 7607 0.0 0.0 0.0
2002 1083 0.0 0.0 0.0
2003 766 0.0 0.0 0.0
2004 927 0.0 0.0 0.0
2005 21 0.0 0.0 0.0
2006 431 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-01-17 No Incident Encountered 0.00 0.00

For data sources see[6]

References