X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0304011210002

Well Details

Well ID: 0304011210002
Loading map...
Location: 00/10-12-030-01W4/2
Location Alias: 00/10-12-30-01 W4M
Location Alias 2: 00/10-12-030-01 W4/02
Country: Canada
Province: Alberta
Township: 030
Meridian: 4
Range: 01
Section: 12
County/Municipality: Special Areas No. 3
Well Name: CNRL ANTELOPE 10-12-30-1
Operator Name: Canadian Natural Resources Limited
License Number: 0012860
License Date: 1957-01-02
License Status: Abandoned
Spud Date: 1957-01-06
Final Drill Date: 1957-01-31
Well Total Depth: 882.70 m
Surface Hole Latitude: 51.556548
Surface Hole Longitude: -110.013788

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1957-01-02 Obtained License
1957-01-20 Drill Stem Test Performed
1957-01-21 Drill Stem Test Performed
1957-01-23 Drill Stem Test Performed
1957-01-24 Drill Stem Test Performed
1957-01-27 Drill Stem Test Performed
1957-01-28 Drill Stem Test Performed
1957-01-30 Drill Stem Test Performed
1957-01-31 Finished Drilling
1957-02-02 Production Casing Operation Performed
1957-02-09 Perforation Treatment Performed - Bullet Perforation
1957-02-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1957-02-22 Perforation Treatment Performed - Bullet Perforation
1957-03-01 Perforation Treatment Performed - Cement Plug
1964-08-26 Perforation Treatment Performed - Bullet Perforation
1964-08-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-09-18 Well Mode changed to Drilled and Cased
1964-12-12 Well Began Production
1964-12-12 Well Fluid changed to Gas
1964-12-12 Well Mode changed to Flowing
1971-10-25 Well Fluid changed to Gas
1971-10-25 Well Mode changed to Suspended
1983-02-01 Well Fluid changed to Gas
1983-02-01 Well Mode changed to Flowing
1993-09-01 Perforation Treatment Performed - Acid Squeeze - Press Used
2002-05-01 Well Fluid changed to Gas
2002-05-01 Well Mode changed to Suspended
2002-08-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-08-23 Plug Back Performed
2002-08-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-08-27 Plug Back Performed
2002-08-27 Well Abandoned
2002-08-27 Well Fluid changed to Gas
2002-08-27 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1957-02-09 Bullet Perforation 854.70 857.10 13
2002-08-27 Packing Device Capped w/Cement 692.00 700.00 0
1957-02-22 Packing Device Capped w/Cement 848.90 848.90 0
1957-02-22 Bullet Perforation 710.20 715.10 13
1957-03-01 Cement Plug 842.80 848.90 0
1964-08-26 Bullet Perforation 854.70 857.10 13
1964-08-27 Acid Treatment 710.20 715.10 0
1964-08-27 Acid Treatment 854.70 857.10 0
1993-09-01 Acid Treatment 854.70 857.10 0
2002-08-23 Packing Device Capped w/Cement 837.00 845.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 0 0.0 0.0 0.0
1969 0 0.0 0.0 0.0
1970 1007 0.0 0.0 0.0
1973 1003 0.0 0.0 0.0
1974 48 0.0 0.0 0.0
1975 15 0.0 0.0 0.0
1981 48 0.0 0.0 0.0
1983 5571 0.0 0.0 0.0
1984 5682 0.0 0.0 0.0
1985 4242 0.0 0.0 0.0
1986 5041 0.0 0.0 0.0
1987 4676 0.0 0.0 0.0
1988 4486 0.0 0.0 0.0
1989 4789 0.0 0.0 0.0
1990 4928 0.0 0.0 0.0
1991 5913 0.0 0.0 0.0
1992 8515 0.0 0.0 0.0
1993 145 0.0 0.0 0.0
1994 3490 0.0 0.0 0.0
1995 6164 0.0 0.0 0.0
1996 96 0.0 0.0 0.0

For data sources see[5]

References