X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0295041506000

Well Details

Well ID: 0295041506000
Loading map...
Location: 00/06-15-029-04W5/0
Location Alias: 00/06-15-29-04 W5M
Location Alias 2: 00/06-15-029-04 W5/00
Country: Canada
Province: Alberta
Township: 029
Meridian: 5
Range: 04
Section: 15
County/Municipality: Mountain View County
Well Name: KING LOCHEND 6-15-29-4
Operator Name: ORLEN Upstream Canada Ltd.
License Number: 0118164
License Date: 1985-10-07
License Status: Abandoned
Spud Date: 1985-10-14
Final Drill Date: 1985-11-06
Well Total Depth: 2351.00 m
Surface Hole Latitude: 51.481638
Surface Hole Longitude: -114.482883

For data sources see[1][2]

Well History

Date Event
1985-10-07 Obtained License
1985-10-16 Surface Casing Operation Performed
1985-11-01 Well Log Performed
1985-11-03 Production Casing Operation Performed
1985-11-06 Finished Drilling
1985-11-06 Perforation Treatment Performed - Open-Hole Completion
1985-11-06 Well Mode changed to Drilled and Cased
1985-11-07 Well Log Performed
1985-11-13 Rig Released
1985-12-03 Well Log Performed
1985-12-04 Perforation Treatment Performed - Fractured
1985-12-04 Perforation Treatment Performed - Jet Perforation
1985-12-26 Well Began Production
1985-12-26 Well Fluid changed to Crude Oil
1985-12-26 Well Mode changed to Pumping
1997-09-01 Well Fluid changed to Crude Oil
1997-09-01 Well Mode changed to Suspended
2019-03-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-03-10 Plug Back Performed
2019-03-10 Well Fluid changed to Crude Oil
2019-03-10 Well Log Performed
2019-03-10 Well Mode changed to Abandoned Zone
2019-03-11 Well Log Performed
2019-12-11 Perforation Treatment Performed - Jet Perforation
2019-12-11 Well Log Performed
2019-12-12 Perforation Treatment Performed - Jet Perforation
2019-12-12 Well Log Performed
2019-12-13 Perforation Treatment Performed - Jet Perforation
2019-12-14 Perforation Treatment Performed - Jet Perforation
2019-12-14 Well Log Performed
2019-12-15 Perforation Treatment Performed - Cement Squeeze
2019-12-15 Plug Back Performed
2019-12-19 Perforation Treatment Performed - Cement Plug
2019-12-19 Perforation Treatment Performed - Jet Perforation
2019-12-19 Plug Back Performed
2019-12-19 Well Log Performed
2019-12-23 Well Abandoned
2019-12-23 Well Fluid changed to Crude Oil
2019-12-23 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1985-11-06 Open Hole/Barefoot Completion 2342.00 2351.00 0
2019-12-12 Perforation 1880.00 1881.00 12
2019-12-12 Perforation 1872.00 1873.00 12
2019-12-12 Perforation 1859.00 1860.00 12
2019-12-12 Perforation 1835.00 1836.00 12
2019-12-12 Perforation 1786.00 1787.00 12
2019-12-12 Perforation 1778.00 1779.00 12
2019-12-12 Perforation 1738.00 1739.00 12
2019-12-12 Perforation 1721.00 1722.00 12
2019-12-12 Perforation 1684.00 1685.00 12
2019-12-12 Perforation 1648.00 1649.00 12
1985-12-04 Perforation 2343.00 2344.00 13
2019-12-12 Perforation 1626.00 1627.00 12
2019-12-12 Perforation 1611.00 1612.00 12
2019-12-12 Perforation 1605.00 1606.00 12
2019-12-12 Perforation 1597.00 1598.00 12
2019-12-12 Perforation 1589.00 1590.00 12
2019-12-12 Perforation 1555.00 1556.00 12
2019-12-12 Perforation 1529.00 1530.00 12
2019-12-13 Perforation 1447.00 1448.00 12
2019-12-14 Perforation 1427.00 1428.00 12
2019-12-14 Perforation 1336.00 1337.00 12
1985-12-04 Fracture 2342.00 2351.00 0
2019-12-14 Perforation 1313.00 1314.00 12
2019-12-14 Perforation 1299.00 1300.00 12
2019-12-14 Perforation 1262.00 1263.00 12
2019-12-14 Perforation 1232.00 1233.00 12
2019-12-14 Perforation 1223.00 1224.00 12
2019-12-14 Perforation 1187.00 1188.00 12
2019-12-14 Perforation 1165.00 1166.00 12
2019-12-14 Perforation 1110.00 1111.00 12
2019-12-14 Perforation 997.00 998.00 12
2019-12-14 Perforation 986.00 987.00 12
2019-03-10 Packing Device Capped w/Cement 2330.00 2338.00 0
2019-12-14 Perforation 964.00 965.00 12
2019-12-14 Perforation 918.00 919.00 12
2019-12-14 Perforation 884.00 885.00 12
2019-12-14 Perforation 855.00 856.00 12
2019-12-14 Perforation 847.00 848.00 12
2019-12-14 Perforation 839.00 840.00 12
2019-12-14 Perforation 803.00 804.00 12
2019-12-14 Perforation 756.00 757.00 12
2019-12-14 Perforation 694.00 695.00 12
2019-12-14 Perforation 624.00 625.00 12
2019-12-11 Perforation 2083.00 2084.00 12
2019-12-15 Cement Squeeze 624.00 2084.00 0
2019-12-19 Perforation 615.00 616.00 12
2019-12-19 Perforation 576.00 577.00 12
2019-12-19 Perforation 513.00 514.00 12
2019-12-19 Perforation 441.00 442.00 12
2019-12-19 Perforation 307.00 308.00 12
2019-12-19 Perforation 287.00 288.00 12
2019-12-19 Perforation 218.00 219.00 12
2019-12-19 Cement Plug 218.00 980.00 0
2019-12-11 Perforation 2031.00 2032.00 12
2019-12-11 Perforation 1941.00 1942.00 12
2019-12-11 Perforation 1905.00 1906.00 12
2019-12-11 Perforation 1891.00 1892.00 12

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1985 288 0.0 0.0 0.0
1986 8223 0.0 0.0 0.0
1987 8537 0.0 0.0 0.0
1988 8687 0.0 0.0 0.0
1989 8087 0.0 0.0 0.0
1990 7470 0.0 0.0 0.0
1991 7367 0.0 0.0 0.0
1992 6120 0.0 0.0 0.0
1993 8043 0.0 0.0 0.0
1994 1262 0.0 0.0 0.0
1995 2796 0.0 0.0 0.0
1996 6800 0.0 0.0 0.0
1997 2076 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-12-23 No Incident Encountered 0.00 0.00

For data sources see[6]

References