If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0295041506000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.481638,"lon":-114.482883,"icon":""}]} |
Location: 00/06-15-029-04W5/0 | |
Location Alias: 00/06-15-29-04 W5M | |
Location Alias 2: 00/06-15-029-04 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 029 | |
Meridian: 5 | |
Range: 04 | |
Section: 15 | |
County/Municipality: Mountain View County | |
Well Name: KING LOCHEND 6-15-29-4 | |
Operator Name: ORLEN Upstream Canada Ltd. | |
License Number: 0118164 | |
License Date: 1985-10-07 | |
License Status: Abandoned | |
Spud Date: 1985-10-14 | |
Final Drill Date: 1985-11-06 | |
Well Total Depth: 2351.00 m | |
Surface Hole Latitude: 51.481638 | |
Surface Hole Longitude: -114.482883 |
Date | Event |
---|---|
1985-10-07 | Obtained License |
1985-10-16 | Surface Casing Operation Performed |
1985-11-01 | Well Log Performed |
1985-11-03 | Production Casing Operation Performed |
1985-11-06 | Finished Drilling |
1985-11-06 | Perforation Treatment Performed - Open-Hole Completion |
1985-11-06 | Well Mode changed to Drilled and Cased |
1985-11-07 | Well Log Performed |
1985-11-13 | Rig Released |
1985-12-03 | Well Log Performed |
1985-12-04 | Perforation Treatment Performed - Fractured |
1985-12-04 | Perforation Treatment Performed - Jet Perforation |
1985-12-26 | Well Began Production |
1985-12-26 | Well Fluid changed to Crude Oil |
1985-12-26 | Well Mode changed to Pumping |
1997-09-01 | Well Fluid changed to Crude Oil |
1997-09-01 | Well Mode changed to Suspended |
2019-03-10 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2019-03-10 | Plug Back Performed |
2019-03-10 | Well Fluid changed to Crude Oil |
2019-03-10 | Well Log Performed |
2019-03-10 | Well Mode changed to Abandoned Zone |
2019-03-11 | Well Log Performed |
2019-12-11 | Perforation Treatment Performed - Jet Perforation |
2019-12-11 | Well Log Performed |
2019-12-12 | Perforation Treatment Performed - Jet Perforation |
2019-12-12 | Well Log Performed |
2019-12-13 | Perforation Treatment Performed - Jet Perforation |
2019-12-14 | Perforation Treatment Performed - Jet Perforation |
2019-12-14 | Well Log Performed |
2019-12-15 | Perforation Treatment Performed - Cement Squeeze |
2019-12-15 | Plug Back Performed |
2019-12-19 | Perforation Treatment Performed - Cement Plug |
2019-12-19 | Perforation Treatment Performed - Jet Perforation |
2019-12-19 | Plug Back Performed |
2019-12-19 | Well Log Performed |
2019-12-23 | Well Abandoned |
2019-12-23 | Well Fluid changed to Crude Oil |
2019-12-23 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1985-11-06 | Open Hole/Barefoot Completion | 2342.00 | 2351.00 | 0 |
2019-12-12 | Perforation | 1880.00 | 1881.00 | 12 |
2019-12-12 | Perforation | 1872.00 | 1873.00 | 12 |
2019-12-12 | Perforation | 1859.00 | 1860.00 | 12 |
2019-12-12 | Perforation | 1835.00 | 1836.00 | 12 |
2019-12-12 | Perforation | 1786.00 | 1787.00 | 12 |
2019-12-12 | Perforation | 1778.00 | 1779.00 | 12 |
2019-12-12 | Perforation | 1738.00 | 1739.00 | 12 |
2019-12-12 | Perforation | 1721.00 | 1722.00 | 12 |
2019-12-12 | Perforation | 1684.00 | 1685.00 | 12 |
2019-12-12 | Perforation | 1648.00 | 1649.00 | 12 |
1985-12-04 | Perforation | 2343.00 | 2344.00 | 13 |
2019-12-12 | Perforation | 1626.00 | 1627.00 | 12 |
2019-12-12 | Perforation | 1611.00 | 1612.00 | 12 |
2019-12-12 | Perforation | 1605.00 | 1606.00 | 12 |
2019-12-12 | Perforation | 1597.00 | 1598.00 | 12 |
2019-12-12 | Perforation | 1589.00 | 1590.00 | 12 |
2019-12-12 | Perforation | 1555.00 | 1556.00 | 12 |
2019-12-12 | Perforation | 1529.00 | 1530.00 | 12 |
2019-12-13 | Perforation | 1447.00 | 1448.00 | 12 |
2019-12-14 | Perforation | 1427.00 | 1428.00 | 12 |
2019-12-14 | Perforation | 1336.00 | 1337.00 | 12 |
1985-12-04 | Fracture | 2342.00 | 2351.00 | 0 |
2019-12-14 | Perforation | 1313.00 | 1314.00 | 12 |
2019-12-14 | Perforation | 1299.00 | 1300.00 | 12 |
2019-12-14 | Perforation | 1262.00 | 1263.00 | 12 |
2019-12-14 | Perforation | 1232.00 | 1233.00 | 12 |
2019-12-14 | Perforation | 1223.00 | 1224.00 | 12 |
2019-12-14 | Perforation | 1187.00 | 1188.00 | 12 |
2019-12-14 | Perforation | 1165.00 | 1166.00 | 12 |
2019-12-14 | Perforation | 1110.00 | 1111.00 | 12 |
2019-12-14 | Perforation | 997.00 | 998.00 | 12 |
2019-12-14 | Perforation | 986.00 | 987.00 | 12 |
2019-03-10 | Packing Device Capped w/Cement | 2330.00 | 2338.00 | 0 |
2019-12-14 | Perforation | 964.00 | 965.00 | 12 |
2019-12-14 | Perforation | 918.00 | 919.00 | 12 |
2019-12-14 | Perforation | 884.00 | 885.00 | 12 |
2019-12-14 | Perforation | 855.00 | 856.00 | 12 |
2019-12-14 | Perforation | 847.00 | 848.00 | 12 |
2019-12-14 | Perforation | 839.00 | 840.00 | 12 |
2019-12-14 | Perforation | 803.00 | 804.00 | 12 |
2019-12-14 | Perforation | 756.00 | 757.00 | 12 |
2019-12-14 | Perforation | 694.00 | 695.00 | 12 |
2019-12-14 | Perforation | 624.00 | 625.00 | 12 |
2019-12-11 | Perforation | 2083.00 | 2084.00 | 12 |
2019-12-15 | Cement Squeeze | 624.00 | 2084.00 | 0 |
2019-12-19 | Perforation | 615.00 | 616.00 | 12 |
2019-12-19 | Perforation | 576.00 | 577.00 | 12 |
2019-12-19 | Perforation | 513.00 | 514.00 | 12 |
2019-12-19 | Perforation | 441.00 | 442.00 | 12 |
2019-12-19 | Perforation | 307.00 | 308.00 | 12 |
2019-12-19 | Perforation | 287.00 | 288.00 | 12 |
2019-12-19 | Perforation | 218.00 | 219.00 | 12 |
2019-12-19 | Cement Plug | 218.00 | 980.00 | 0 |
2019-12-11 | Perforation | 2031.00 | 2032.00 | 12 |
2019-12-11 | Perforation | 1941.00 | 1942.00 | 12 |
2019-12-11 | Perforation | 1905.00 | 1906.00 | 12 |
2019-12-11 | Perforation | 1891.00 | 1892.00 | 12 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1985 | 288 | 0.0 | 0.0 | 0.0 |
1986 | 8223 | 0.0 | 0.0 | 0.0 |
1987 | 8537 | 0.0 | 0.0 | 0.0 |
1988 | 8687 | 0.0 | 0.0 | 0.0 |
1989 | 8087 | 0.0 | 0.0 | 0.0 |
1990 | 7470 | 0.0 | 0.0 | 0.0 |
1991 | 7367 | 0.0 | 0.0 | 0.0 |
1992 | 6120 | 0.0 | 0.0 | 0.0 |
1993 | 8043 | 0.0 | 0.0 | 0.0 |
1994 | 1262 | 0.0 | 0.0 | 0.0 |
1995 | 2796 | 0.0 | 0.0 | 0.0 |
1996 | 6800 | 0.0 | 0.0 | 0.0 |
1997 | 2076 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2019-12-23 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]