X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0295011610000

Well Details

Well ID: 0295011610000
Loading map...
Location: 00/10-16-029-01W5/0
Location Alias: 00/10-16-29-01 W5M
Location Alias 2: 00/10-16-029-01 W5/00
Country: Canada
Province: Alberta
Township: 029
Meridian: 5
Range: 01
Section: 16
County/Municipality: Mountain View County
Well Name: PWEI UNIT CROSSE 10-16-29-1
Operator Name: TAQA North Ltd.
License Number: 0074716
License Date: 1979-03-02
License Status: RecCertified
Spud Date: 1979-08-08
Final Drill Date: 1979-09-01
Well Total Depth: 2845.00 m
Surface Hole Latitude: 51.485079
Surface Hole Longitude: -114.078859

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1979-03-02 Obtained License
1979-09-01 Finished Drilling
1979-09-05 Production Casing Operation Performed
1979-09-06 Well Mode changed to Drilled and Cased
1980-03-18 Perforation Treatment Performed - Jet Perforation
1980-03-20 Perforation Treatment Performed - Fractured
1980-03-26 Well Began Production
1980-03-26 Well Fluid changed to Gas
1980-03-26 Well Mode changed to Flowing
1992-03-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1992-03-14 Plug Back Performed
1992-03-15 Perforation Treatment Performed - Jet Perforation
1992-03-15 Well Log Performed
1992-03-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1992-03-16 Perforation Treatment Performed - Remedial Casing
1992-03-16 Well Fluid changed to Gas
1992-03-16 Well Log Performed
1992-03-16 Well Mode changed to Abandoned
1992-03-18 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1980-03-18 Perforation 2782.00 2787.00 7
1980-03-18 Perforation 2790.00 2792.00 7
1980-03-18 Perforation 2795.00 2796.00 7
1980-03-18 Perforation 2797.00 2800.00 7
1980-03-20 Fracture 2782.00 2800.00 0
1992-03-14 Packing Device Capped w/Cement 2724.00 2733.00 0
1992-03-15 Perforation 505.00 505.50 39
1992-03-16 Remedial Casing Cementing 505.00 505.50 0
1992-03-16 Packing Device Capped w/Cement 494.00 503.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1979 1880 0.0 0.0 0.0
1980 4413 0.0 0.0 0.0
1981 1808 0.0 0.0 0.0
1982 585 0.0 0.0 0.0
1983 95 0.0 0.0 0.0
1985 489 0.0 0.0 0.0
1990 24 0.0 0.0 0.0

For data sources see[5]

References