X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0295010810000

Well Details

Well ID: 0295010810000
Loading map...
Location: 00/10-08-029-01W5/0
Location Alias: 00/10-08-29-01 W5M
Location Alias 2: 00/10-08-029-01 W5/00
Country: Canada
Province: Alberta
Township: 029
Meridian: 5
Range: 01
Section: 08
County/Municipality: Rocky View County
Well Name: CZAR ET AL CROSS 10-8-29-1
Operator Name: Canadian Natural Resources Limited
License Number: 0072765
License Date: 1978-11-03
License Status: Re-Entered
Spud Date: 1978-11-12
Final Drill Date: 1979-01-05
Well Total Depth: 2875.00 m
Surface Hole Latitude: 51.467979
Surface Hole Longitude: -114.102466

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1978-11-03 Obtained License
1978-12-02 Drill Stem Test Performed
1978-12-14 Drill Stem Test Performed
1978-12-15 Drill Stem Test Performed
1978-12-29 Drill Stem Test Performed
1979-01-05 Finished Drilling
1979-01-05 Well Log Performed
1979-01-05 Well Mode changed to Drilled and Cased
1979-01-08 Production Casing Operation Performed
1979-02-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-02-28 Perforation Treatment Performed - Jet Perforation
1979-03-02 Perforation Treatment Performed - Fractured
1979-03-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1979-03-23 Perforation Treatment Performed - Jet Perforation
1979-03-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-03-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1979-03-29 Perforation Treatment Performed - Jet Perforation
1979-03-31 Perforation Treatment Performed - Fractured
1979-06-01 Well Began Production
1979-06-01 Well Fluid changed to Crude Oil
1979-06-01 Well Mode changed to Pumping
1980-01-01 Well Fluid changed to Crude Oil
1980-01-01 Well Mode changed to Suspended
1990-07-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1990-07-23 Plug Back Performed
1990-07-23 Well Fluid changed to Crude Oil
1990-07-23 Well Mode changed to Abandoned and Re-entered
1990-07-28 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1979-02-28 Perforation 2817.00 2833.00 7
1979-03-29 Perforation 2138.00 2142.00 7
1979-03-29 Perforation 2146.00 2151.00 7
1979-03-31 Fracture 2132.00 2151.00 0
1990-07-23 Packing Device Capped w/Cement 2117.00 2125.00 0
1979-02-28 Acid Treatment 2817.00 2833.00 0
1979-03-02 Fracture 2817.00 2833.00 0
1979-03-21 Packing Device Capped w/Cement 2772.00 2780.00 0
1979-03-23 Perforation 2397.00 2400.00 7
1979-03-27 Acid Treatment 2397.00 2400.00 0
1979-03-28 Packing Device Capped w/Cement 2372.00 2380.00 0
1979-03-29 Perforation 2132.00 2133.00 7
1979-03-29 Perforation 2134.00 2137.00 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1979 2044 0.0 0.0 0.0

For data sources see[5]

References