If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0294281113000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.471881,"lon":-113.844283,"icon":""}]} |
Location: 00/13-11-029-28W4/0 | |
Location Alias: 00/13-11-29-28 W4M | |
Location Alias 2: 00/13-11-029-28 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 029 | |
Meridian: 4 | |
Range: 28 | |
Section: 11 | |
County/Municipality: Mountain View County | |
Well Name: EMBER LPINECK 13-11-29-28 | |
Operator Name: Ember Resources Inc. | |
License Number: 0410503 | |
License Date: 2009-05-15 | |
License Status: Amended | |
Spud Date: 2009-12-02 | |
Final Drill Date: 2010-01-19 | |
Well Total Depth: 1197.00 m | |
Surface Hole Latitude: 51.471881 | |
Surface Hole Longitude: -113.844283 |
Date | Event |
---|---|
2009-05-15 | Obtained License |
2009-12-02 | Surface Casing Operation Performed |
2010-01-19 | Finished Drilling |
2010-01-19 | Production Casing Operation Performed |
2010-01-19 | Rig Released |
2010-01-19 | Well Mode changed to Drilled and Cased |
2010-01-23 | Well Log Performed |
2010-02-10 | Perforation Treatment Performed - Jet Perforation |
2010-02-22 | Well Fluid changed to Gas |
2010-02-22 | Well Mode changed to Testing |
2010-03-29 | Well Began Production |
2010-03-29 | Well Fluid changed to Gas |
2010-03-29 | Well Mode changed to Flowing |
2010-08-27 | Perforation Treatment Performed - Fractured |
2010-09-06 | Perforation Treatment Performed - Jet Perforation |
2010-09-11 | Perforation Treatment Performed - Fractured |
2010-12-03 | Well Fluid changed to Coalbed Methane-Coals and Other |
2010-12-03 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2010-02-10 | Perforation | 1114.00 | 1117.00 | 13 |
2010-09-06 | Perforation | 633.00 | 637.00 | 13 |
2010-09-06 | Perforation | 700.00 | 701.00 | 13 |
2010-09-06 | Perforation | 661.00 | 664.00 | 13 |
2010-09-06 | Perforation | 646.00 | 648.00 | 13 |
2010-09-06 | Perforation | 488.00 | 491.00 | 13 |
2010-09-06 | Perforation | 465.00 | 468.00 | 13 |
2010-09-06 | Perforation | 422.00 | 425.00 | 13 |
2010-09-06 | Perforation | 500.00 | 503.00 | 13 |
2010-09-06 | Perforation | 550.00 | 552.00 | 13 |
2010-09-06 | Perforation | 539.00 | 540.00 | 13 |
2010-02-10 | Perforation | 1043.00 | 1045.00 | 13 |
2010-09-06 | Perforation | 521.00 | 523.00 | 13 |
2010-09-06 | Perforation | 785.00 | 786.00 | 13 |
2010-09-06 | Perforation | 693.30 | 694.30 | 13 |
2010-09-06 | Perforation | 678.40 | 678.90 | 13 |
2010-09-06 | Perforation | 813.10 | 813.60 | 13 |
2010-09-06 | Perforation | 840.10 | 840.60 | 13 |
2010-09-06 | Perforation | 836.10 | 836.60 | 13 |
2010-09-06 | Perforation | 824.20 | 826.20 | 13 |
2010-09-06 | Perforation | 430.40 | 430.90 | 13 |
2010-09-06 | Perforation | 805.00 | 806.00 | 13 |
2010-02-10 | Perforation | 975.00 | 978.00 | 13 |
2010-09-06 | Perforation | 773.00 | 776.00 | 13 |
2010-09-06 | Perforation | 560.10 | 560.60 | 13 |
2010-09-06 | Perforation | 576.10 | 576.60 | 13 |
2010-09-06 | Perforation | 449.10 | 449.60 | 13 |
2010-09-11 | Fracture | 422.00 | 806.00 | 0 |
2010-09-11 | Fracture | 430.40 | 840.60 | 0 |
2010-02-10 | Perforation | 442.00 | 445.00 | 13 |
2010-08-27 | Fracture | 1043.00 | 1045.00 | 0 |
2010-08-27 | Fracture | 975.00 | 978.00 | 0 |
2010-09-06 | Perforation | 590.00 | 593.00 | 13 |
2010-09-06 | Perforation | 580.00 | 583.00 | 13 |
2010-09-06 | Perforation | 573.00 | 574.00 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2010 | 4496 | 0.0 | 0.0 | 0.0 |
2011 | 8755 | 0.0 | 0.0 | 0.0 |
2012 | 8782 | 0.0 | 0.0 | 0.0 |
2013 | 8759 | 0.0 | 0.0 | 0.0 |
2014 | 8747 | 0.0 | 0.0 | 0.0 |
2015 | 8742 | 0.0 | 0.0 | 0.0 |
2016 | 8760 | 0.0 | 0.0 | 0.0 |
2017 | 8669 | 0.0 | 0.0 | 0.0 |
2018 | 8399 | 0.0 | 0.0 | 0.0 |
2019 | 8660 | 0.0 | 0.0 | 0.0 |
2020 | 2178 | 0.0 | 0.0 | 0.0 |
For data sources see[5]