If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0294273612000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.528233,"lon":-113.680366,"icon":""}]} |
Location: 00/12-36-029-27W4/0 | |
Location Alias: 00/12-36-29-27 W4M | |
Location Alias 2: 00/12-36-029-27 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 029 | |
Meridian: 4 | |
Range: 27 | |
Section: 36 | |
County/Municipality: Mountain View County | |
Well Name: EMBER ET AL LPINECK 12-36-29-27 | |
Operator Name: Ember Resources Inc. | |
License Number: 0423100 | |
License Date: 2010-08-31 | |
License Status: Issued | |
Spud Date: 2011-02-19 | |
Final Drill Date: 2011-02-20 | |
Well Total Depth: 1120.00 m | |
Surface Hole Latitude: 51.528233 | |
Surface Hole Longitude: -113.680366 |
Date | Event |
---|---|
2010-08-31 | Obtained License |
2011-01-16 | Surface Casing Operation Performed |
2011-02-20 | Finished Drilling |
2011-02-20 | Well Mode changed to Drilled and Cased |
2011-02-21 | Production Casing Operation Performed |
2011-02-21 | Rig Released |
2011-02-25 | Well Log Performed |
2011-03-06 | Perforation Treatment Performed - Jet Perforation |
2011-03-06 | Well Log Performed |
2011-03-18 | Well Began Production |
2011-03-18 | Well Fluid changed to Coalbed Methane-Coals and Other |
2011-03-18 | Well Mode changed to Flowing |
2011-10-28 | Perforation Treatment Performed - Fractured |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-03-06 | Perforation | 1021.00 | 1022.00 | 13 |
2011-03-06 | Perforation | 700.80 | 701.30 | 13 |
2011-03-06 | Perforation | 683.50 | 684.00 | 13 |
2011-03-06 | Perforation | 679.20 | 679.70 | 13 |
2011-03-06 | Perforation | 663.50 | 665.00 | 13 |
2011-03-06 | Perforation | 662.50 | 663.00 | 13 |
2011-03-06 | Perforation | 639.20 | 639.70 | 13 |
2011-03-06 | Perforation | 594.50 | 595.50 | 13 |
2011-03-06 | Perforation | 591.50 | 594.00 | 13 |
2011-03-06 | Perforation | 586.20 | 587.20 | 13 |
2011-03-06 | Perforation | 584.50 | 585.00 | 13 |
2011-03-06 | Perforation | 831.50 | 832.50 | 13 |
2011-03-06 | Perforation | 543.50 | 546.00 | 13 |
2011-03-06 | Perforation | 524.00 | 525.00 | 13 |
2011-03-06 | Perforation | 520.50 | 522.00 | 13 |
2011-03-06 | Perforation | 396.00 | 396.50 | 13 |
2011-03-06 | Perforation | 368.50 | 370.00 | 13 |
2011-03-06 | Perforation | 366.50 | 367.50 | 13 |
2011-03-06 | Perforation | 364.50 | 365.50 | 13 |
2011-03-06 | Perforation | 358.50 | 359.50 | 13 |
2011-03-06 | Perforation | 345.60 | 346.10 | 13 |
2011-03-06 | Perforation | 336.80 | 337.30 | 13 |
2011-03-06 | Perforation | 748.00 | 749.00 | 13 |
2011-10-28 | Fracture | 748.00 | 749.00 | 0 |
2011-10-28 | Fracture | 747.00 | 747.50 | 0 |
2011-10-28 | Fracture | 733.70 | 734.20 | 0 |
2011-10-28 | Fracture | 731.50 | 732.00 | 0 |
2011-10-28 | Fracture | 726.00 | 727.00 | 0 |
2011-10-28 | Fracture | 718.50 | 719.00 | 0 |
2011-10-28 | Fracture | 717.20 | 717.70 | 0 |
2011-10-28 | Fracture | 700.80 | 701.30 | 0 |
2011-10-28 | Fracture | 683.50 | 684.00 | 0 |
2011-10-28 | Fracture | 679.20 | 679.70 | 0 |
2011-03-06 | Perforation | 747.00 | 747.50 | 13 |
2011-10-28 | Fracture | 663.50 | 665.00 | 0 |
2011-10-28 | Fracture | 662.50 | 663.00 | 0 |
2011-10-28 | Fracture | 639.20 | 639.70 | 0 |
2011-10-28 | Fracture | 594.50 | 595.50 | 0 |
2011-10-28 | Fracture | 591.50 | 594.00 | 0 |
2011-10-28 | Fracture | 586.20 | 587.20 | 0 |
2011-10-28 | Fracture | 584.50 | 585.00 | 0 |
2011-10-28 | Fracture | 543.50 | 546.00 | 0 |
2011-10-28 | Fracture | 524.00 | 525.00 | 0 |
2011-10-28 | Fracture | 520.50 | 522.00 | 0 |
2011-03-06 | Perforation | 733.70 | 734.20 | 13 |
2011-10-28 | Fracture | 396.00 | 396.50 | 0 |
2011-10-28 | Fracture | 368.50 | 370.00 | 0 |
2011-10-28 | Fracture | 366.50 | 367.50 | 0 |
2011-10-28 | Fracture | 364.50 | 365.50 | 0 |
2011-10-28 | Fracture | 358.50 | 359.50 | 0 |
2011-10-28 | Fracture | 345.60 | 346.10 | 0 |
2011-10-28 | Fracture | 336.80 | 337.30 | 0 |
2011-03-06 | Perforation | 731.50 | 732.00 | 13 |
2011-03-06 | Perforation | 726.00 | 727.00 | 13 |
2011-03-06 | Perforation | 718.50 | 719.00 | 13 |
2011-03-06 | Perforation | 717.20 | 717.70 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 6196 | 0.0 | 0.0 | 0.0 |
2012 | 8730 | 0.0 | 0.0 | 0.0 |
2013 | 8392 | 0.0 | 0.0 | 0.0 |
2014 | 7799 | 0.0 | 0.0 | 0.0 |
2015 | 8625 | 0.0 | 0.0 | 0.0 |
2016 | 8335 | 0.0 | 0.0 | 0.0 |
2017 | 8220 | 0.0 | 0.0 | 0.0 |
2018 | 7950 | 0.0 | 0.0 | 0.0 |
2019 | 7027 | 0.0 | 0.0 | 0.0 |
2020 | 1654 | 0.0 | 0.0 | 0.0 |
For data sources see[5]