If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0294273606000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.524726,"lon":-113.674058,"icon":""}]} |
Location: 00/06-36-029-27W4/0 | |
Location Alias: 00/06-36-29-27 W4M | |
Location Alias 2: 00/06-36-029-27 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 029 | |
Meridian: 4 | |
Range: 27 | |
Section: 36 | |
County/Municipality: Mountain View County | |
Well Name: EMBER ET AL LPINECK 6-36-29-27 | |
Operator Name: Ember Resources Inc. | |
License Number: 0423074 | |
License Date: 2010-08-31 | |
License Status: Issued | |
Spud Date: 2011-02-16 | |
Final Drill Date: 2011-02-17 | |
Well Total Depth: 1108.00 m | |
Surface Hole Latitude: 51.524726 | |
Surface Hole Longitude: -113.674058 |
Date | Event |
---|---|
2010-08-31 | Obtained License |
2011-01-15 | Surface Casing Operation Performed |
2011-02-17 | Finished Drilling |
2011-02-17 | Production Casing Operation Performed |
2011-02-17 | Well Mode changed to Drilled and Cased |
2011-02-18 | Rig Released |
2011-02-23 | Well Log Performed |
2011-03-09 | Perforation Treatment Performed - Jet Perforation |
2011-03-09 | Well Log Performed |
2011-03-18 | Well Began Production |
2011-03-18 | Well Fluid changed to Coalbed Methane-Coals and Other |
2011-03-18 | Well Mode changed to Flowing |
2011-09-20 | Perforation Treatment Performed - Fractured |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-03-09 | Perforation | 949.50 | 950.50 | 13 |
2011-03-09 | Perforation | 704.50 | 705.00 | 13 |
2011-03-09 | Perforation | 691.50 | 692.00 | 13 |
2011-03-09 | Perforation | 677.20 | 677.70 | 13 |
2011-03-09 | Perforation | 675.50 | 676.00 | 13 |
2011-03-09 | Perforation | 670.60 | 671.10 | 13 |
2011-03-09 | Perforation | 655.00 | 656.00 | 13 |
2011-03-09 | Perforation | 649.00 | 650.00 | 13 |
2011-03-09 | Perforation | 629.30 | 629.80 | 13 |
2011-03-09 | Perforation | 586.20 | 587.20 | 13 |
2011-03-09 | Perforation | 579.30 | 580.30 | 13 |
2011-03-09 | Perforation | 833.50 | 834.50 | 13 |
2011-03-09 | Perforation | 577.20 | 577.70 | 13 |
2011-03-09 | Perforation | 559.30 | 559.80 | 13 |
2011-03-09 | Perforation | 555.00 | 556.50 | 13 |
2011-03-09 | Perforation | 540.50 | 541.50 | 13 |
2011-03-09 | Perforation | 503.50 | 507.00 | 13 |
2011-03-09 | Perforation | 468.50 | 469.50 | 13 |
2011-03-09 | Perforation | 463.50 | 464.00 | 13 |
2011-03-09 | Perforation | 389.80 | 390.30 | 13 |
2011-03-09 | Perforation | 342.00 | 343.00 | 13 |
2011-03-09 | Perforation | 332.00 | 333.00 | 13 |
2011-03-09 | Perforation | 831.00 | 833.00 | 13 |
2011-09-20 | Fracture | 740.00 | 741.00 | 0 |
2011-09-20 | Fracture | 729.00 | 729.50 | 0 |
2011-09-20 | Fracture | 727.00 | 727.50 | 0 |
2011-09-20 | Fracture | 725.40 | 725.90 | 0 |
2011-09-20 | Fracture | 711.60 | 712.10 | 0 |
2011-09-20 | Fracture | 707.00 | 707.50 | 0 |
2011-09-20 | Fracture | 704.50 | 705.00 | 0 |
2011-09-20 | Fracture | 691.50 | 692.00 | 0 |
2011-09-20 | Fracture | 677.20 | 677.70 | 0 |
2011-09-20 | Fracture | 675.50 | 676.00 | 0 |
2011-03-09 | Perforation | 740.00 | 741.00 | 13 |
2011-09-20 | Fracture | 670.60 | 671.10 | 0 |
2011-09-20 | Fracture | 655.00 | 656.00 | 0 |
2011-09-20 | Fracture | 649.00 | 650.00 | 0 |
2011-09-20 | Fracture | 629.30 | 629.80 | 0 |
2011-09-20 | Fracture | 586.20 | 587.20 | 0 |
2011-09-20 | Fracture | 579.30 | 580.30 | 0 |
2011-09-20 | Fracture | 577.20 | 577.70 | 0 |
2011-09-20 | Fracture | 559.30 | 559.80 | 0 |
2011-09-20 | Fracture | 555.00 | 556.50 | 0 |
2011-09-20 | Fracture | 540.50 | 541.50 | 0 |
2011-03-09 | Perforation | 729.00 | 729.50 | 13 |
2011-09-20 | Fracture | 503.50 | 507.00 | 0 |
2011-09-20 | Fracture | 468.50 | 469.50 | 0 |
2011-09-20 | Fracture | 463.50 | 464.00 | 0 |
2011-09-20 | Fracture | 389.80 | 390.30 | 0 |
2011-09-20 | Fracture | 342.00 | 343.00 | 0 |
2011-09-20 | Fracture | 332.00 | 333.00 | 0 |
2011-03-09 | Perforation | 727.00 | 727.50 | 13 |
2011-03-09 | Perforation | 725.40 | 725.90 | 13 |
2011-03-09 | Perforation | 711.60 | 712.10 | 13 |
2011-03-09 | Perforation | 707.00 | 707.50 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 2309 | 0.0 | 0.0 | 0.0 |
2012 | 8730 | 0.0 | 0.0 | 0.0 |
2013 | 8402 | 0.0 | 0.0 | 0.0 |
2014 | 7794 | 0.0 | 0.0 | 0.0 |
2015 | 8579 | 0.0 | 0.0 | 0.0 |
2016 | 7385 | 0.0 | 0.0 | 0.0 |
2017 | 8565 | 0.0 | 0.0 | 0.0 |
2018 | 8577 | 0.0 | 0.0 | 0.0 |
2019 | 8215 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[5]