If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0294272508000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.510179,"lon":-113.662498,"icon":""}]} |
Location: 00/08-25-029-27W4/0 | |
Location Alias: 00/08-25-29-27 W4M | |
Location Alias 2: 00/08-25-029-27 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 029 | |
Meridian: 4 | |
Range: 27 | |
Section: 25 | |
County/Municipality: Mountain View County | |
Well Name: EMBER ET AL LPINECK 8-25-29-27 | |
Operator Name: Ember Resources Inc. | |
License Number: 0436785 | |
License Date: 2011-09-14 | |
License Status: Issued | |
Spud Date: 2011-10-14 | |
Final Drill Date: 2011-10-15 | |
Well Total Depth: 1093.00 m | |
Surface Hole Latitude: 51.510179 | |
Surface Hole Longitude: -113.662498 |
Date | Event |
---|---|
2011-09-14 | Obtained License |
2011-10-06 | Surface Casing Operation Performed |
2011-10-15 | Finished Drilling |
2011-10-15 | Production Casing Operation Performed |
2011-10-15 | Rig Released |
2011-10-15 | Well Mode changed to Drilled and Cased |
2011-10-22 | Well Log Performed |
2011-11-06 | Perforation Treatment Performed - Jet Perforation |
2011-11-06 | Well Log Performed |
2011-11-24 | Perforation Treatment Performed - Fractured |
2011-11-30 | Well Began Production |
2011-11-30 | Well Fluid changed to Coalbed Methane-Coals and Other |
2011-11-30 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-11-06 | Perforation | 733.50 | 734.50 | 13 |
2011-11-06 | Perforation | 643.00 | 644.00 | 13 |
2011-11-06 | Perforation | 633.50 | 634.00 | 13 |
2011-11-06 | Perforation | 627.00 | 629.00 | 13 |
2011-11-06 | Perforation | 595.00 | 596.00 | 13 |
2011-11-06 | Perforation | 572.00 | 572.50 | 13 |
2011-11-06 | Perforation | 565.50 | 566.00 | 13 |
2011-11-06 | Perforation | 561.50 | 562.00 | 13 |
2011-11-06 | Perforation | 438.00 | 439.50 | 13 |
2011-11-06 | Perforation | 344.50 | 346.00 | 13 |
2011-11-06 | Perforation | 323.00 | 324.00 | 13 |
2011-11-06 | Perforation | 725.00 | 725.50 | 13 |
2011-11-06 | Perforation | 314.00 | 314.50 | 13 |
2011-11-24 | Fracture | 733.50 | 734.50 | 0 |
2011-11-24 | Fracture | 725.00 | 725.50 | 0 |
2011-11-24 | Fracture | 721.00 | 722.00 | 0 |
2011-11-24 | Fracture | 712.00 | 714.00 | 0 |
2011-11-24 | Fracture | 703.60 | 704.10 | 0 |
2011-11-24 | Fracture | 686.00 | 686.50 | 0 |
2011-11-24 | Fracture | 667.00 | 667.50 | 0 |
2011-11-24 | Fracture | 663.00 | 663.50 | 0 |
2011-11-24 | Fracture | 644.00 | 645.50 | 0 |
2011-11-06 | Perforation | 721.00 | 722.00 | 13 |
2011-11-24 | Fracture | 643.00 | 644.00 | 0 |
2011-11-24 | Fracture | 633.50 | 634.00 | 0 |
2011-11-24 | Fracture | 627.00 | 629.00 | 0 |
2011-11-24 | Fracture | 595.00 | 596.00 | 0 |
2011-11-24 | Fracture | 572.00 | 572.50 | 0 |
2011-11-24 | Fracture | 565.50 | 566.00 | 0 |
2011-11-24 | Fracture | 561.50 | 562.00 | 0 |
2011-11-24 | Fracture | 438.00 | 439.50 | 0 |
2011-11-24 | Fracture | 344.50 | 346.00 | 0 |
2011-11-24 | Fracture | 323.00 | 324.00 | 0 |
2011-11-06 | Perforation | 712.00 | 714.00 | 13 |
2011-11-24 | Fracture | 314.00 | 314.50 | 0 |
2011-11-06 | Perforation | 703.60 | 704.10 | 13 |
2011-11-06 | Perforation | 686.00 | 686.50 | 13 |
2011-11-06 | Perforation | 667.00 | 667.50 | 13 |
2011-11-06 | Perforation | 663.00 | 663.50 | 13 |
2011-11-06 | Perforation | 644.00 | 645.50 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 761 | 0.0 | 0.0 | 0.0 |
2012 | 8407 | 0.0 | 0.0 | 0.0 |
2013 | 1648 | 0.0 | 0.0 | 0.0 |
2014 | 5471 | 0.0 | 0.0 | 0.0 |
2015 | 7409 | 0.0 | 0.0 | 0.0 |
2016 | 8769 | 0.0 | 0.0 | 0.0 |
2017 | 8744 | 0.0 | 0.0 | 0.0 |
2018 | 8712 | 0.0 | 0.0 | 0.0 |
2019 | 8632 | 0.0 | 0.0 | 0.0 |
2020 | 2179 | 0.0 | 0.0 | 0.0 |
For data sources see[5]