X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0294271712000

Well Details

Well ID: 0294271712000
Loading map...
Location: 00/12-17-029-27W4/0
Location Alias: 00/12-17-29-27 W4M
Location Alias 2: 00/12-17-029-27 W4/00
Country: Canada
Province: Alberta
Township: 029
Meridian: 4
Range: 27
Section: 17
County/Municipality: Mountain View County
Well Name: EMBER ENTICE 12-17-29-27
Operator Name: Ember Resources Inc.
License Number: 0448840
License Date: 2012-10-01
License Status: Issued
Spud Date: 2012-10-19
Final Drill Date: 2012-10-20
Well Total Depth: 1147.10 m
Surface Hole Latitude: 51.484703
Surface Hole Longitude: -113.775923

For data sources see[1][2]

Well History

Date Event
2012-10-01 Obtained License
2012-10-19 Surface Casing Operation Performed
2012-10-20 Finished Drilling
2012-10-20 Well Mode changed to Drilled and Cased
2012-10-21 Production Casing Operation Performed
2012-10-21 Rig Released
2012-10-25 Well Log Performed
2012-11-03 Perforation Treatment Performed - Jet Perforation
2012-11-03 Well Log Performed
2012-11-12 Perforation Treatment Performed - Fractured
2012-12-04 Well Began Production
2012-12-04 Well Fluid changed to Coalbed Methane-Coals and Other
2012-12-04 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-10-19 Precision Drilling Corporation 180 N/A Drill To LD

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-11-03 Perforation 1080.50 1081.50 13
2012-11-03 Perforation 711.00 712.00 13
2012-11-03 Perforation 708.80 709.80 13
2012-11-03 Perforation 701.00 701.50 13
2012-11-03 Perforation 636.30 637.30 13
2012-11-03 Perforation 626.60 629.60 13
2012-11-03 Perforation 498.00 499.50 13
2012-11-03 Perforation 376.00 377.00 13
2012-11-03 Perforation 365.60 366.10 13
2012-11-12 Fracture 776.80 777.30 0
2012-11-12 Fracture 773.70 774.20 0
2012-11-03 Perforation 776.80 777.30 13
2012-11-12 Fracture 763.50 765.50 0
2012-11-12 Fracture 758.00 759.00 0
2012-11-12 Fracture 756.50 757.00 0
2012-11-12 Fracture 750.70 751.20 0
2012-11-12 Fracture 741.00 741.50 0
2012-11-12 Fracture 726.40 728.40 0
2012-11-12 Fracture 711.00 712.00 0
2012-11-12 Fracture 708.80 709.80 0
2012-11-12 Fracture 701.00 701.50 0
2012-11-12 Fracture 636.30 637.30 0
2012-11-03 Perforation 773.70 774.20 13
2012-11-12 Fracture 628.60 629.60 0
2012-11-12 Fracture 498.00 499.50 0
2012-11-12 Fracture 376.00 377.00 0
2012-11-12 Fracture 365.60 366.10 0
2012-11-03 Perforation 763.50 765.50 13
2012-11-03 Perforation 758.00 759.00 13
2012-11-03 Perforation 756.50 757.00 13
2012-11-03 Perforation 750.70 751.20 13
2012-11-03 Perforation 741.00 741.50 13
2012-11-03 Perforation 726.40 728.40 13

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 663 0.0 0.0 0.0
2013 8755 0.0 0.0 0.0
2014 5038 0.0 0.0 0.0
2015 8735 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8701 0.0 0.0 0.0
2018 8638 0.0 0.0 0.0
2019 8628 0.0 0.0 0.0
2020 2160 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-10-21 No Incident Encountered 0.00 0.00
2012-11-12 No Incident Encountered 0.00 0.00

For data sources see[7]

References