If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0294271308000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.481136,"lon":-113.666191,"icon":""}]} |
Location: 00/08-13-029-27W4/0 | |
Location Alias: 00/08-13-29-27 W4M | |
Location Alias 2: 00/08-13-029-27 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 029 | |
Meridian: 4 | |
Range: 27 | |
Section: 13 | |
County/Municipality: Mountain View County | |
Well Name: EMBER ET AL IRCANA 8-13-29-27 | |
Operator Name: Ember Resources Inc. | |
License Number: 0416457 | |
License Date: 2009-12-29 | |
License Status: Issued | |
Spud Date: 2010-01-10 | |
Final Drill Date: 2010-01-12 | |
Well Total Depth: 1098.00 m | |
Surface Hole Latitude: 51.481136 | |
Surface Hole Longitude: -113.666191 |
Date | Event |
---|---|
2009-12-29 | Obtained License |
2010-01-10 | Surface Casing Operation Performed |
2010-01-12 | Finished Drilling |
2010-01-12 | Production Casing Operation Performed |
2010-01-12 | Rig Released |
2010-01-12 | Well Mode changed to Drilled and Cased |
2010-01-19 | Well Log Performed |
2010-01-26 | Perforation Treatment Performed - Jet Perforation |
2010-01-26 | Well Log Performed |
2010-01-31 | Perforation Treatment Performed - Fractured |
2010-02-10 | Well Began Production |
2010-02-10 | Well Fluid changed to Coalbed Methane-Coals Only |
2010-02-10 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2010-01-26 | Perforation | 742.90 | 743.40 | 13 |
2010-01-26 | Perforation | 665.40 | 665.90 | 13 |
2010-01-26 | Perforation | 663.10 | 664.10 | 13 |
2010-01-26 | Perforation | 638.50 | 639.00 | 13 |
2010-01-26 | Perforation | 635.80 | 636.30 | 13 |
2010-01-26 | Perforation | 605.20 | 605.70 | 13 |
2010-01-26 | Perforation | 575.40 | 575.90 | 13 |
2010-01-26 | Perforation | 572.00 | 572.50 | 13 |
2010-01-26 | Perforation | 563.90 | 564.40 | 13 |
2010-01-26 | Perforation | 555.00 | 555.50 | 13 |
2010-01-26 | Perforation | 518.00 | 519.50 | 13 |
2010-01-26 | Perforation | 738.90 | 739.90 | 13 |
2010-01-26 | Perforation | 501.50 | 502.00 | 13 |
2010-01-26 | Perforation | 490.40 | 491.90 | 13 |
2010-01-26 | Perforation | 466.00 | 468.00 | 13 |
2010-01-26 | Perforation | 447.40 | 447.90 | 13 |
2010-01-26 | Perforation | 443.70 | 444.20 | 13 |
2010-01-26 | Perforation | 372.70 | 376.20 | 13 |
2010-01-26 | Perforation | 330.10 | 330.60 | 13 |
2010-01-26 | Perforation | 327.00 | 327.50 | 13 |
2010-01-26 | Perforation | 305.00 | 305.50 | 13 |
2010-01-26 | Perforation | 1022.40 | 1024.40 | 17 |
2010-01-26 | Perforation | 732.70 | 733.20 | 13 |
2010-01-26 | Perforation | 807.60 | 809.60 | 17 |
2010-01-26 | Perforation | 797.00 | 798.00 | 17 |
2010-01-31 | Fracture | 807.60 | 809.60 | 0 |
2010-01-31 | Fracture | 797.00 | 798.00 | 0 |
2010-01-31 | Fracture | 742.90 | 743.90 | 0 |
2010-01-31 | Fracture | 738.90 | 739.90 | 0 |
2010-01-31 | Fracture | 732.70 | 733.20 | 0 |
2010-01-31 | Fracture | 729.20 | 730.20 | 0 |
2010-01-31 | Fracture | 718.10 | 718.60 | 0 |
2010-01-31 | Fracture | 711.00 | 714.50 | 0 |
2010-01-26 | Perforation | 729.20 | 730.20 | 13 |
2010-01-31 | Fracture | 699.90 | 700.40 | 0 |
2010-01-31 | Fracture | 681.80 | 682.30 | 0 |
2010-01-31 | Fracture | 675.50 | 676.00 | 0 |
2010-01-31 | Fracture | 665.40 | 665.90 | 0 |
2010-01-31 | Fracture | 663.10 | 664.10 | 0 |
2010-01-31 | Fracture | 638.50 | 639.00 | 0 |
2010-01-31 | Fracture | 635.80 | 636.30 | 0 |
2010-01-31 | Fracture | 605.20 | 605.70 | 0 |
2010-01-31 | Fracture | 575.40 | 575.90 | 0 |
2010-01-31 | Fracture | 572.00 | 572.50 | 0 |
2010-01-26 | Perforation | 718.10 | 718.60 | 13 |
2010-01-31 | Fracture | 563.90 | 564.40 | 0 |
2010-01-31 | Fracture | 555.00 | 555.50 | 0 |
2010-01-31 | Fracture | 518.00 | 519.50 | 0 |
2010-01-31 | Fracture | 501.50 | 502.00 | 0 |
2010-01-31 | Fracture | 490.40 | 491.90 | 0 |
2010-01-31 | Fracture | 466.00 | 468.00 | 0 |
2010-01-31 | Fracture | 447.40 | 447.90 | 0 |
2010-01-31 | Fracture | 443.70 | 444.20 | 0 |
2010-01-31 | Fracture | 372.70 | 376.20 | 0 |
2010-01-31 | Fracture | 330.10 | 330.60 | 0 |
2010-01-26 | Perforation | 711.00 | 714.50 | 13 |
2010-01-31 | Fracture | 327.00 | 327.50 | 0 |
2010-01-31 | Fracture | 305.00 | 305.50 | 0 |
2010-01-26 | Perforation | 699.90 | 700.40 | 13 |
2010-01-26 | Perforation | 681.80 | 682.30 | 13 |
2010-01-26 | Perforation | 675.50 | 676.00 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2010 | 7591 | 0.0 | 0.0 | 0.0 |
2011 | 8436 | 0.0 | 0.0 | 0.0 |
2012 | 8731 | 0.0 | 0.0 | 0.0 |
2013 | 8733 | 0.0 | 0.0 | 0.0 |
2014 | 4703 | 0.0 | 0.0 | 0.0 |
2015 | 5249 | 0.0 | 0.0 | 0.0 |
2016 | 8711 | 0.0 | 0.0 | 0.0 |
2017 | 8676 | 0.0 | 0.0 | 0.0 |
2018 | 8615 | 0.0 | 0.0 | 0.0 |
2019 | 8383 | 0.0 | 0.0 | 0.0 |
2020 | 1968 | 0.0 | 0.0 | 0.0 |
For data sources see[5]