If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0294270912000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.468709,"lon":-113.752899,"icon":""}]} |
Location: 00/12-09-029-27W4/0 | |
Location Alias: 00/12-09-29-27 W4M | |
Location Alias 2: 00/12-09-029-27 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 029 | |
Meridian: 4 | |
Range: 27 | |
Section: 09 | |
County/Municipality: Mountain View County | |
Well Name: EMBER ET AL ENTICE 12-9-29-27 | |
Operator Name: Ember Resources Inc. | |
License Number: 0448762 | |
License Date: 2012-09-27 | |
License Status: Issued | |
Spud Date: 2012-10-27 | |
Final Drill Date: 2012-10-28 | |
Well Total Depth: 1144.10 m | |
Surface Hole Latitude: 51.468709 | |
Surface Hole Longitude: -113.752899 |
Date | Event |
---|---|
2012-09-27 | Obtained License |
2012-10-27 | Surface Casing Operation Performed |
2012-10-28 | Finished Drilling |
2012-10-28 | Production Casing Operation Performed |
2012-10-28 | Rig Released |
2012-10-28 | Well Mode changed to Drilled and Cased |
2012-11-02 | Well Log Performed |
2012-11-08 | Perforation Treatment Performed - Jet Perforation |
2012-11-08 | Well Log Performed |
2012-11-20 | Perforation Treatment Performed - Fractured |
2012-12-17 | Well Began Production |
2012-12-17 | Well Fluid changed to Coalbed Methane-Coals and Other |
2012-12-17 | Well Mode changed to Flowing |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2012-10-27 | Precision Drilling Corporation | 180 | N/A | Drill To LD |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-11-08 | Perforation | 775.50 | 776.00 | 13 |
2012-11-08 | Perforation | 693.30 | 694.30 | 13 |
2012-11-08 | Perforation | 689.80 | 690.30 | 13 |
2012-11-08 | Perforation | 681.50 | 682.50 | 13 |
2012-11-08 | Perforation | 670.50 | 672.00 | 13 |
2012-11-08 | Perforation | 622.70 | 623.20 | 13 |
2012-11-08 | Perforation | 619.20 | 620.20 | 13 |
2012-11-08 | Perforation | 616.50 | 617.00 | 13 |
2012-11-08 | Perforation | 608.80 | 610.30 | 13 |
2012-11-08 | Perforation | 529.00 | 530.00 | 13 |
2012-11-08 | Perforation | 522.00 | 526.00 | 13 |
2012-11-08 | Perforation | 762.00 | 763.00 | 13 |
2012-11-08 | Perforation | 508.00 | 511.00 | 13 |
2012-11-08 | Perforation | 482.50 | 483.00 | 13 |
2012-11-08 | Perforation | 480.00 | 481.50 | 13 |
2012-11-08 | Perforation | 475.50 | 476.50 | 13 |
2012-11-08 | Perforation | 369.30 | 369.80 | 13 |
2012-11-08 | Perforation | 361.50 | 362.00 | 13 |
2012-11-08 | Perforation | 351.00 | 351.50 | 13 |
2012-11-20 | Fracture | 775.50 | 776.00 | 0 |
2012-11-20 | Fracture | 762.00 | 763.00 | 0 |
2012-11-20 | Fracture | 757.20 | 758.70 | 0 |
2012-11-08 | Perforation | 757.20 | 758.70 | 13 |
2012-11-20 | Fracture | 748.90 | 750.90 | 0 |
2012-11-20 | Fracture | 743.00 | 743.50 | 0 |
2012-11-20 | Fracture | 740.00 | 740.50 | 0 |
2012-11-20 | Fracture | 728.00 | 729.50 | 0 |
2012-11-20 | Fracture | 722.70 | 723.20 | 0 |
2012-11-20 | Fracture | 706.50 | 708.50 | 0 |
2012-11-20 | Fracture | 693.30 | 694.30 | 0 |
2012-11-20 | Fracture | 689.80 | 690.30 | 0 |
2012-11-20 | Fracture | 681.50 | 682.50 | 0 |
2012-11-20 | Fracture | 670.50 | 672.00 | 0 |
2012-11-08 | Perforation | 748.90 | 750.90 | 13 |
2012-11-20 | Fracture | 622.70 | 623.20 | 0 |
2012-11-20 | Fracture | 619.20 | 620.20 | 0 |
2012-11-20 | Fracture | 616.50 | 617.00 | 0 |
2012-11-20 | Fracture | 608.80 | 610.30 | 0 |
2012-11-20 | Fracture | 529.00 | 530.00 | 0 |
2012-11-20 | Fracture | 522.00 | 526.00 | 0 |
2012-11-20 | Fracture | 508.00 | 511.00 | 0 |
2012-11-20 | Fracture | 482.50 | 483.00 | 0 |
2012-11-20 | Fracture | 480.00 | 481.50 | 0 |
2012-11-20 | Fracture | 475.50 | 476.50 | 0 |
2012-11-08 | Perforation | 743.00 | 743.50 | 13 |
2012-11-20 | Fracture | 369.30 | 369.80 | 0 |
2012-11-20 | Fracture | 361.50 | 362.00 | 0 |
2012-11-20 | Fracture | 351.00 | 351.50 | 0 |
2012-11-08 | Perforation | 740.00 | 740.50 | 13 |
2012-11-08 | Perforation | 728.00 | 729.50 | 13 |
2012-11-08 | Perforation | 722.70 | 723.20 | 13 |
2012-11-08 | Perforation | 706.50 | 708.50 | 13 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 359 | 0.0 | 0.0 | 0.0 |
2013 | 8757 | 0.0 | 0.0 | 0.0 |
2014 | 5028 | 0.0 | 0.0 | 0.0 |
2015 | 8710 | 0.0 | 0.0 | 0.0 |
2016 | 8749 | 0.0 | 0.0 | 0.0 |
2017 | 8705 | 0.0 | 0.0 | 0.0 |
2018 | 8738 | 0.0 | 0.0 | 0.0 |
2019 | 8484 | 0.0 | 0.0 | 0.0 |
2020 | 1571 | 0.0 | 0.0 | 0.0 |
For data sources see[6]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2012-10-28 | No Incident Encountered | 0.00 | 0.00 |
2012-11-20 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[7]