If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0294263213000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.531123,"lon":-113.633062,"icon":""}]} |
Location: 00/13-32-029-26W4/0 | |
Location Alias: 00/13-32-29-26 W4M | |
Location Alias 2: 00/13-32-029-26 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 029 | |
Meridian: 4 | |
Range: 26 | |
Section: 32 | |
County/Municipality: Kneehill County | |
Well Name: EMBER SWALWELL 13-32-29-26 | |
Operator Name: Ember Resources Inc. | |
License Number: 0411072 | |
License Date: 2009-06-24 | |
License Status: Issued | |
Spud Date: 2009-10-15 | |
Final Drill Date: 2009-11-17 | |
Well Total Depth: 1032.00 m | |
Surface Hole Latitude: 51.531123 | |
Surface Hole Longitude: -113.633062 |
Date | Event |
---|---|
2009-06-24 | Obtained License |
2009-10-15 | Lost Circulation Occurred |
2009-10-15 | Surface Casing Operation Performed |
2009-11-17 | Finished Drilling |
2009-11-17 | Well Mode changed to Drilled and Cased |
2009-11-18 | Production Casing Operation Performed |
2009-11-18 | Rig Released |
2009-11-22 | Well Log Performed |
2009-12-08 | Perforation Treatment Performed - Jet Perforation |
2009-12-16 | Well Fluid changed to Gas |
2009-12-16 | Well Mode changed to Testing |
2010-01-07 | Well Began Production |
2010-01-07 | Well Fluid changed to Gas |
2010-01-07 | Well Mode changed to Flowing |
2011-10-26 | Perforation Treatment Performed - Jet Perforation |
2011-11-03 | Perforation Treatment Performed - Fractured |
2011-11-17 | Well Fluid changed to Coalbed Methane-Coals and Other |
2011-11-17 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2009-12-08 | Perforation | 917.00 | 918.00 | 13 |
2011-10-26 | Perforation | 344.10 | 344.60 | 13 |
2011-10-26 | Perforation | 369.00 | 372.00 | 13 |
2011-10-26 | Perforation | 404.00 | 406.00 | 13 |
2011-10-26 | Perforation | 423.50 | 424.00 | 13 |
2011-10-26 | Perforation | 435.00 | 436.00 | 13 |
2011-10-26 | Perforation | 438.00 | 439.00 | 13 |
2011-10-26 | Perforation | 475.30 | 475.80 | 13 |
2011-10-26 | Perforation | 505.00 | 507.00 | 13 |
2011-10-26 | Perforation | 528.70 | 529.20 | 13 |
2011-10-26 | Perforation | 534.60 | 535.60 | 13 |
2009-12-08 | Perforation | 912.50 | 913.50 | 13 |
2011-10-26 | Perforation | 542.90 | 543.40 | 13 |
2011-10-26 | Perforation | 548.60 | 549.10 | 13 |
2011-10-26 | Perforation | 591.30 | 591.80 | 13 |
2011-10-26 | Perforation | 611.20 | 613.20 | 13 |
2011-10-26 | Perforation | 615.00 | 616.50 | 13 |
2011-10-26 | Perforation | 634.10 | 634.60 | 13 |
2011-10-26 | Perforation | 644.30 | 644.80 | 13 |
2011-10-26 | Perforation | 650.90 | 651.40 | 13 |
2011-10-26 | Perforation | 662.00 | 663.00 | 13 |
2011-10-26 | Perforation | 666.00 | 666.50 | 13 |
2011-10-26 | Perforation | 225.00 | 227.00 | 13 |
2011-10-26 | Perforation | 672.40 | 672.90 | 13 |
2011-10-26 | Perforation | 673.20 | 675.20 | 13 |
2011-10-26 | Perforation | 680.30 | 680.80 | 13 |
2011-10-26 | Perforation | 681.70 | 682.20 | 13 |
2011-10-26 | Perforation | 685.20 | 685.70 | 13 |
2011-10-26 | Perforation | 694.00 | 694.50 | 13 |
2011-10-26 | Perforation | 695.40 | 695.90 | 13 |
2011-10-26 | Perforation | 696.10 | 696.60 | 13 |
2011-10-26 | Perforation | 701.00 | 704.00 | 13 |
2011-11-03 | Fracture | 225.00 | 704.00 | 0 |
2011-10-26 | Perforation | 276.90 | 277.40 | 13 |
2011-10-26 | Perforation | 285.00 | 286.00 | 13 |
2011-10-26 | Perforation | 294.20 | 294.70 | 13 |
2011-10-26 | Perforation | 295.10 | 295.60 | 13 |
2011-10-26 | Perforation | 301.40 | 301.90 | 13 |
2011-10-26 | Perforation | 303.00 | 306.00 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2009 | 24 | 0.0 | 0.0 | 0.0 |
2010 | 8599 | 0.0 | 0.0 | 0.0 |
2011 | 8757 | 0.0 | 0.0 | 0.0 |
2012 | 8783 | 0.0 | 0.0 | 0.0 |
2013 | 8759 | 0.0 | 0.0 | 0.0 |
2014 | 8759 | 0.0 | 0.0 | 0.0 |
2015 | 8740 | 0.0 | 0.0 | 0.0 |
2016 | 8752 | 0.0 | 0.0 | 0.0 |
2017 | 8684 | 0.0 | 0.0 | 0.0 |
2018 | 8725 | 0.0 | 0.0 | 0.0 |
2019 | 8698 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2009-10-15 | Lost Circulation | 50.00 | 60.00 |
For data sources see[6]