If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0294261113020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.473353,"lon":-113.562232,"icon":""}]} |
| Location: 02/13-11-029-26W4/0 | |
| Location Alias: 02/13-11-29-26 W4M | |
| Location Alias 2: 02/13-11-029-26 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 029 | |
| Meridian: 4 | |
| Range: 26 | |
| Section: 11 | |
| County/Municipality: Kneehill County | |
| Well Name: EMBER 102 SWALWELL 13-11-29-26 | |
| Operator Name: Ember Resources Inc. | |
| License Number: 0427332 | |
| License Date: 2010-12-08 | |
| License Status: Issued | |
| Spud Date: 2010-12-17 | |
| Final Drill Date: 2010-12-29 | |
| Well Total Depth: 767.00 m | |
| Surface Hole Latitude: 51.473353 | |
| Surface Hole Longitude: -113.562232 |
| Date | Event |
|---|---|
| 2010-12-08 | Obtained License |
| 2010-12-17 | Surface Casing Operation Performed |
| 2010-12-29 | Finished Drilling |
| 2010-12-29 | Production Casing Operation Performed |
| 2010-12-29 | Rig Released |
| 2010-12-29 | Well Mode changed to Drilled and Cased |
| 2011-01-05 | Well Log Performed |
| 2011-01-24 | Perforation Treatment Performed - Jet Perforation |
| 2011-02-05 | Perforation Treatment Performed - Fractured |
| 2011-02-08 | Well Fluid changed to Gas |
| 2011-02-08 | Well Mode changed to Testing |
| 2011-02-13 | Perforation Treatment Performed - Jet Perforation |
| 2011-02-14 | Perforation Treatment Performed - Fractured |
| 2011-07-26 | Well Began Production |
| 2011-07-26 | Well Fluid changed to Coalbed Methane-Coals and Other |
| 2011-07-26 | Well Mode changed to Flowing |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2011-01-24 | Perforation | 729.00 | 731.00 | 13 |
| 2011-02-13 | Perforation | 514.30 | 514.80 | 13 |
| 2011-02-13 | Perforation | 501.20 | 503.20 | 13 |
| 2011-02-13 | Perforation | 533.40 | 533.90 | 13 |
| 2011-02-13 | Perforation | 557.80 | 558.30 | 13 |
| 2011-02-13 | Perforation | 537.30 | 538.30 | 13 |
| 2011-02-13 | Perforation | 470.60 | 471.10 | 13 |
| 2011-02-13 | Perforation | 432.20 | 432.70 | 13 |
| 2011-02-13 | Perforation | 482.40 | 482.90 | 13 |
| 2011-02-13 | Perforation | 492.00 | 495.00 | 13 |
| 2011-02-13 | Perforation | 489.00 | 490.00 | 13 |
| 2011-01-24 | Perforation | 548.00 | 550.00 | 13 |
| 2011-02-13 | Perforation | 568.50 | 569.00 | 13 |
| 2011-02-13 | Perforation | 632.70 | 633.70 | 13 |
| 2011-02-13 | Perforation | 625.70 | 626.70 | 13 |
| 2011-02-13 | Perforation | 634.60 | 635.10 | 13 |
| 2011-02-13 | Perforation | 649.90 | 650.90 | 13 |
| 2011-02-13 | Perforation | 640.70 | 642.70 | 13 |
| 2011-02-13 | Perforation | 590.90 | 591.40 | 13 |
| 2011-02-13 | Perforation | 587.50 | 589.50 | 13 |
| 2011-02-13 | Perforation | 603.90 | 604.90 | 13 |
| 2011-02-13 | Perforation | 618.30 | 618.80 | 13 |
| 2011-01-24 | Perforation | 461.00 | 463.00 | 13 |
| 2011-02-13 | Perforation | 617.20 | 617.70 | 13 |
| 2011-02-13 | Perforation | 384.80 | 385.80 | 13 |
| 2011-02-13 | Perforation | 358.50 | 361.00 | 13 |
| 2011-02-13 | Perforation | 313.00 | 315.00 | 13 |
| 2011-02-13 | Perforation | 406.00 | 408.00 | 13 |
| 2011-02-13 | Perforation | 429.00 | 430.00 | 13 |
| 2011-02-13 | Perforation | 425.00 | 427.00 | 13 |
| 2011-02-13 | Perforation | 255.00 | 256.00 | 13 |
| 2011-02-13 | Perforation | 233.00 | 235.00 | 13 |
| 2011-02-13 | Perforation | 258.00 | 261.00 | 13 |
| 2011-01-24 | Perforation | 448.00 | 450.00 | 13 |
| 2011-02-13 | Perforation | 301.50 | 304.50 | 13 |
| 2011-02-13 | Perforation | 275.00 | 278.00 | 13 |
| 2011-02-13 | Perforation | 472.00 | 474.00 | 13 |
| 2011-02-13 | Perforation | 250.90 | 251.40 | 13 |
| 2011-02-13 | Perforation | 245.50 | 246.00 | 13 |
| 2011-02-13 | Perforation | 272.40 | 272.90 | 13 |
| 2011-02-13 | Perforation | 252.30 | 253.30 | 13 |
| 2011-02-13 | Perforation | 629.00 | 631.00 | 13 |
| 2011-02-13 | Perforation | 566.00 | 567.00 | 13 |
| 2011-02-13 | Perforation | 572.00 | 575.00 | 13 |
| 2011-01-24 | Perforation | 242.00 | 244.00 | 13 |
| 2011-02-13 | Perforation | 601.00 | 602.00 | 13 |
| 2011-02-13 | Perforation | 613.00 | 615.00 | 13 |
| 2011-02-14 | Fracture | 245.50 | 650.90 | 0 |
| 2011-02-14 | Fracture | 233.00 | 244.00 | 0 |
| 2011-02-05 | Fracture | 729.00 | 731.00 | 0 |
| 2011-02-05 | Fracture | 548.00 | 550.00 | 0 |
| 2011-02-05 | Fracture | 461.00 | 463.00 | 0 |
| 2011-02-05 | Fracture | 448.00 | 450.00 | 0 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2011 | 3822 | 0.0 | 0.0 | 0.0 |
| 2012 | 8782 | 0.0 | 0.0 | 0.0 |
| 2013 | 8759 | 0.0 | 0.0 | 0.0 |
| 2014 | 8759 | 0.0 | 0.0 | 0.0 |
| 2015 | 8739 | 0.0 | 0.0 | 0.0 |
| 2016 | 8752 | 0.0 | 0.0 | 0.0 |
| 2017 | 8683 | 0.0 | 0.0 | 0.0 |
| 2018 | 8725 | 0.0 | 0.0 | 0.0 |
| 2019 | 8698 | 0.0 | 0.0 | 0.0 |
| 2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[5]