X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0294242414000

Well Details

Well ID: 0294242414000
Loading map...
Location: 00/14-24-029-24W4/0
Location Alias: 00/14-24-29-24 W4M
Location Alias 2: 00/14-24-029-24 W4/00
Country: Canada
Province: Alberta
Township: 029
Meridian: 4
Range: 24
Section: 24
County/Municipality: Kneehill County
Well Name: EMBER SWALWELL 14-24-29-24
Operator Name: Ember Resources Inc.
License Number: 0385788
License Date: 2007-11-27
License Status: Issued
Spud Date: 2007-12-02
Final Drill Date: 2007-12-03
Well Total Depth: 801.00 m
Surface Hole Latitude: 51.502538
Surface Hole Longitude: -113.252338

For data sources see[1][2]

Well History

Date Event
2007-11-27 Obtained License
2007-12-02 Surface Casing Operation Performed
2007-12-03 Finished Drilling
2007-12-03 Production Casing Operation Performed
2007-12-03 Rig Released
2007-12-03 Well Mode changed to Drilled and Cased
2007-12-13 Well Log Performed
2008-01-11 Perforation Treatment Performed - Jet Perforation
2008-01-11 Well Log Performed
2008-01-31 Perforation Treatment Performed - Jet Perforation
2008-01-31 Well Log Performed
2008-02-06 Perforation Treatment Performed - Fractured
2008-07-07 Well Began Production
2008-07-07 Well Fluid changed to Coalbed Methane-Coals and Other
2008-07-07 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2008-01-11 Perforation 534.00 535.00 13
2008-01-31 Perforation 316.70 317.20 13
2008-01-31 Perforation 331.80 332.30 13
2008-01-31 Perforation 336.00 336.50 13
2008-01-31 Perforation 348.20 349.20 13
2008-01-31 Perforation 360.60 361.60 13
2008-01-31 Perforation 366.00 367.00 13
2008-01-31 Perforation 374.80 377.80 13
2008-01-31 Perforation 381.00 383.50 13
2008-01-31 Perforation 403.60 404.10 13
2008-01-31 Perforation 407.20 408.20 13
2008-01-11 Perforation 543.50 546.00 13
2008-01-31 Perforation 416.00 417.00 13
2008-01-31 Perforation 431.00 432.00 13
2008-01-31 Perforation 437.50 438.50 13
2008-01-31 Perforation 449.50 450.00 13
2008-01-31 Perforation 457.00 458.00 13
2008-02-06 Fracture 457.00 458.00 0
2008-02-06 Fracture 449.50 450.00 0
2008-02-06 Fracture 437.50 438.50 0
2008-02-06 Fracture 431.00 432.00 0
2008-02-06 Fracture 416.00 417.00 0
2008-01-11 Perforation 743.00 745.00 13
2008-02-06 Fracture 403.60 408.20 0
2008-02-06 Fracture 381.00 383.50 0
2008-02-06 Fracture 374.80 377.80 0
2008-02-06 Fracture 366.00 367.00 0
2008-02-06 Fracture 360.60 361.60 0
2008-02-06 Fracture 348.20 349.20 0
2008-02-06 Fracture 331.80 336.50 0
2008-02-06 Fracture 314.00 317.20 0
2008-02-06 Fracture 309.50 311.00 0
2008-02-06 Fracture 258.00 258.50 0
2008-01-11 Perforation 760.30 761.80 13
2008-02-06 Fracture 216.00 216.50 0
2008-02-06 Fracture 204.50 205.00 0
2008-01-31 Perforation 204.50 205.00 13
2008-01-31 Perforation 216.00 216.50 13
2008-01-31 Perforation 258.00 258.50 13
2008-01-31 Perforation 309.50 311.00 13
2008-01-31 Perforation 314.00 315.50 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2008 4272 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 8759 0.0 0.0 0.0
2011 8759 0.0 0.0 0.0
2012 8478 0.0 0.0 0.0
2013 8759 0.0 0.0 0.0
2014 8751 0.0 0.0 0.0
2015 8754 0.0 0.0 0.0
2016 8778 0.0 0.0 0.0
2017 8696 0.0 0.0 0.0
2018 8701 0.0 0.0 0.0
2019 8589 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References