X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0294240516000

Well Details

Well ID: 0294240516000
Loading map...
Location: 00/16-05-029-24W4/0
Location Alias: 00/16-05-29-24 W4M
Location Alias 2: 00/16-05-029-24 W4/00
Country: Canada
Province: Alberta
Township: 029
Meridian: 4
Range: 24
Section: 05
County/Municipality: Kneehill County
Well Name: EMBER SWALWELL 16-5-29-24
Operator Name: Ember Resources Inc.
License Number: 0092843
License Date: 1981-10-21
License Status: Issued
Spud Date: 1981-10-24
Final Drill Date: 1981-11-10
Well Total Depth: 1744.00 m
Surface Hole Latitude: 51.459238
Surface Hole Longitude: -113.334517

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1981-10-21 Obtained License
1981-11-10 Finished Drilling
1981-11-10 Well Mode changed to Drilled and Cased
1981-11-12 Drill Stem Test Performed
1981-11-13 Drill Stem Test Performed
1981-11-15 Production Casing Operation Performed
1982-03-01 Well Began Production
1982-03-01 Well Fluid changed to Crude Oil
1982-03-01 Well Mode changed to Pumping
1982-03-03 Perforation Treatment Performed - Jet Perforation
1982-03-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-08-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1984-08-28 Plug Back Performed
1984-08-28 Well Fluid changed to Crude Oil
1984-08-28 Well Log Performed
1984-08-28 Well Mode changed to Abandoned Zone
1984-08-29 Perforation Treatment Performed - Jet Perforation
1984-08-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-01-19 Perforation Treatment Performed - Jet Perforation
1991-01-19 Well Log Performed
1992-01-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1992-01-27 Plug Back Performed
1992-01-29 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1982-03-03 Perforation 1687.50 1688.50 7
1992-01-29 Fracture 1432.50 1439.00 0
1982-03-03 Perforation 1690.00 1691.00 7
1982-03-04 Acid Treatment 1687.50 1691.00 0
1984-08-28 Packing Device Capped w/Cement 1684.50 1686.50 0
1984-08-29 Perforation 1675.50 1678.50 13
1984-08-30 Acid Treatment 1675.50 1678.50 0
1991-01-19 Perforation 1432.50 1438.50 13
1991-01-19 Perforation 1436.00 1439.00 13
1992-01-27 Packing Device Capped w/Cement 1657.00 1665.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1982 1817 0.0 0.0 0.0
1983 4168 0.0 0.0 0.0
1984 4108 0.0 0.0 0.0

For data sources see[5]

References