If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0294240511000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.454918,"lon":-113.349199,"icon":""}]} |
Location: 00/11-05-029-24W4/0 | |
Location Alias: 00/11-05-29-24 W4M | |
Location Alias 2: 00/11-05-029-24 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 029 | |
Meridian: 4 | |
Range: 24 | |
Section: 05 | |
County/Municipality: Kneehill County | |
Well Name: EMBER SWALWELL 11-5-29-24 | |
Operator Name: Ember Resources Inc. | |
License Number: 0411273 | |
License Date: 2009-07-02 | |
License Status: Issued | |
Spud Date: 2009-08-13 | |
Final Drill Date: 2009-08-14 | |
Well Total Depth: 908.00 m | |
Surface Hole Latitude: 51.454918 | |
Surface Hole Longitude: -113.349199 |
Date | Event |
---|---|
2009-07-02 | Obtained License |
2009-08-13 | Surface Casing Operation Performed |
2009-08-14 | Finished Drilling |
2009-08-14 | Production Casing Operation Performed |
2009-08-14 | Well Mode changed to Drilled and Cased |
2009-08-15 | Rig Released |
2009-09-01 | Well Log Performed |
2009-10-02 | Perforation Treatment Performed - Jet Perforation |
2009-10-07 | Perforation Treatment Performed - Fractured |
2009-11-04 | Well Began Production |
2009-11-04 | Well Fluid changed to Coalbed Methane-Coals Only |
2009-11-04 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2009-10-02 | Perforation | 203.80 | 204.30 | 13 |
2009-10-02 | Perforation | 444.90 | 445.40 | 13 |
2009-10-02 | Perforation | 488.80 | 489.30 | 13 |
2009-10-02 | Perforation | 497.40 | 497.90 | 13 |
2009-10-02 | Perforation | 501.30 | 501.80 | 13 |
2009-10-02 | Perforation | 510.00 | 511.00 | 13 |
2009-10-02 | Perforation | 517.90 | 518.40 | 13 |
2009-10-02 | Perforation | 524.70 | 525.20 | 13 |
2009-10-02 | Perforation | 526.50 | 527.00 | 13 |
2009-10-02 | Perforation | 533.00 | 534.00 | 13 |
2009-10-02 | Perforation | 550.20 | 550.70 | 13 |
2009-10-02 | Perforation | 263.20 | 263.70 | 13 |
2009-10-02 | Perforation | 551.80 | 552.30 | 13 |
2009-10-07 | Fracture | 550.20 | 552.30 | 0 |
2009-10-07 | Fracture | 533.00 | 534.00 | 0 |
2009-10-07 | Fracture | 524.70 | 527.00 | 0 |
2009-10-07 | Fracture | 517.90 | 518.40 | 0 |
2009-10-07 | Fracture | 510.00 | 511.00 | 0 |
2009-10-07 | Fracture | 497.40 | 501.80 | 0 |
2009-10-07 | Fracture | 488.80 | 489.30 | 0 |
2009-10-07 | Fracture | 444.90 | 445.40 | 0 |
2009-10-07 | Fracture | 435.90 | 437.40 | 0 |
2009-10-02 | Perforation | 267.30 | 267.80 | 13 |
2009-10-07 | Fracture | 432.60 | 433.10 | 0 |
2009-10-07 | Fracture | 422.60 | 423.10 | 0 |
2009-10-07 | Fracture | 413.50 | 414.00 | 0 |
2009-10-07 | Fracture | 393.00 | 393.50 | 0 |
2009-10-07 | Fracture | 381.80 | 382.30 | 0 |
2009-10-07 | Fracture | 267.30 | 267.80 | 0 |
2009-10-07 | Fracture | 263.20 | 263.70 | 0 |
2009-10-07 | Fracture | 203.80 | 204.30 | 0 |
2009-10-02 | Perforation | 381.80 | 382.30 | 13 |
2009-10-02 | Perforation | 393.00 | 393.50 | 13 |
2009-10-02 | Perforation | 413.50 | 414.00 | 13 |
2009-10-02 | Perforation | 422.60 | 423.10 | 13 |
2009-10-02 | Perforation | 432.60 | 433.10 | 13 |
2009-10-02 | Perforation | 435.90 | 437.40 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2009 | 1392 | 0.0 | 0.0 | 0.0 |
2010 | 8756 | 0.0 | 0.0 | 0.0 |
2011 | 8748 | 0.0 | 0.0 | 0.0 |
2012 | 8382 | 0.0 | 0.0 | 0.0 |
2013 | 8730 | 0.0 | 0.0 | 0.0 |
2014 | 8599 | 0.0 | 0.0 | 0.0 |
2015 | 8676 | 0.0 | 0.0 | 0.0 |
2016 | 8616 | 0.0 | 0.0 | 0.0 |
2017 | 7957 | 0.0 | 0.0 | 0.0 |
2018 | 5388 | 0.0 | 0.0 | 0.0 |
2019 | 6520 | 0.0 | 0.0 | 0.0 |
2020 | 2116 | 0.0 | 0.0 | 0.0 |
For data sources see[5]