X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0294213516000

Well Details

Well ID: 0294213516000
Loading map...
Location: 00/16-35-029-21W4/0
Location Alias: 00/16-35-29-21 W4M
Location Alias 2: 00/16-35-029-21 W4/00
Country: Canada
Province: Alberta
Township: 029
Meridian: 4
Range: 21
Section: 35
County/Municipality: Starland County
Well Name: SLE GPINE 16-35-29-21
Operator Name: SanLing Energy Ltd.
License Number: 0006512
License Date: 1953-05-29
License Status: Suspension
Spud Date: 1953-06-01
Final Drill Date: 1953-06-27
Well Total Depth: 1729.10 m
Surface Hole Latitude: 51.530375
Surface Hole Longitude: -112.844156

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1953-05-29 Obtained License
1953-06-27 Finished Drilling
1953-06-27 Well Mode changed to Drilled and Cased
1953-06-28 Liner Casing Operation Performed
1953-06-28 Perforation Treatment Performed - Open-Hole Completion
1953-07-11 Well Began Production
1953-07-11 Well Fluid changed to Crude Oil
1953-07-11 Well Mode changed to Flowing
1953-07-12 Perforation Treatment Performed - Acid Wash - No Pressure
1955-05-17 Perforation Treatment Performed - Bullet Perforation
1955-05-17 Perforation Treatment Performed - Jet Perforation
1955-05-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1955-05-26 Perforation Treatment Performed - Acid Wash - No Pressure
1955-05-31 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1955-06-01 Perforation Treatment Performed - Bullet Perforation
1955-06-01 Perforation Treatment Performed - Jet Perforation
1973-01-29 Well Fluid changed to Crude Oil
1973-01-29 Well Mode changed to Pumping
1982-05-28 Perforation Treatment Performed - Jet Perforation
1994-03-01 Perforation Treatment Performed - Jet Perforation
1994-03-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-12-02 Well Fluid changed to Crude Oil
1997-12-02 Well Mode changed to Suspended
2007-03-05 Well Log Performed
2007-03-08 Well Log Performed
2007-03-09 Perforation Treatment Performed - Cement Plug
2007-03-12 Well Log Performed
2007-04-02 Perforation Treatment Performed - Jet Perforation
2007-04-02 Well Log Performed
2007-04-04 Perforation Treatment Performed - Cement Plug
2007-04-05 Perforation Treatment Performed - Jet Perforation
2007-04-30 Perforation Treatment Performed - Cement Squeeze
2007-05-01 Perforation Treatment Performed - Cement Plug
2007-05-02 Perforation Treatment Performed - Jet Perforation
2007-05-02 Well Log Performed
2007-05-03 Perforation Treatment Performed - Cement Squeeze
2007-05-08 Well Log Performed
2007-05-09 Perforation Treatment Performed - Jet Perforation
2007-05-09 Well Log Performed
2007-05-10 Perforation Treatment Performed - Cement Squeeze
2007-05-11 Perforation Treatment Performed - Jet Perforation
2007-05-11 Well Log Performed
2007-05-12 Perforation Treatment Performed - Jet Perforation
2007-05-12 Well Log Performed
2007-05-13 Perforation Treatment Performed - Cement Squeeze
2007-05-14 Perforation Treatment Performed - Cement Squeeze
2007-05-14 Well Log Performed
2007-05-15 Perforation Treatment Performed - Cement Squeeze
2007-05-15 Perforation Treatment Performed - Jet Perforation
2007-05-15 Well Log Performed
2007-05-16 Perforation Treatment Performed - Cement Squeeze

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1953-06-28 Open Hole/Barefoot Completion 1686.20 1696.80 0
1982-05-28 Perforation 1684.30 1689.80 7
1994-03-01 Perforation 1672.40 1677.00 20
1994-03-04 Acid Treatment 1672.40 1677.00 0
2007-03-09 Cement Plug 1671.00 1689.80 0
2007-04-02 Perforation 1196.00 1197.00 13
2007-04-04 Cement Plug 1010.00 1188.20 0
2007-04-05 Perforation 1005.00 1006.00 13
2007-04-30 Cement Squeeze 1005.00 1006.00 0
2007-05-01 Cement Plug 750.00 999.90 0
2007-05-02 Perforation 505.00 506.00 13
1953-07-12 Acid Wash 1686.20 1696.80 0
2007-05-03 Cement Squeeze 505.00 506.00 0
2007-05-09 Perforation 411.00 412.00 13
2007-05-10 Cement Squeeze 411.00 412.00 0
2007-05-11 Perforation 310.00 311.00 13
2007-05-11 Perforation 217.00 218.00 13
2007-05-12 Perforation 261.00 262.00 13
2007-05-13 Cement Squeeze 310.00 311.00 0
2007-05-14 Cement Squeeze 261.00 262.00 0
2007-05-15 Cement Squeeze 217.00 218.00 0
2007-05-15 Perforation 209.00 210.00 13
1955-05-17 Perforation 1717.20 1718.80 10
2007-05-16 Cement Squeeze 209.00 210.00 0
1955-05-17 Bullet Perforation 1717.20 1718.80 10
1955-05-22 Acid Treatment 1717.20 1718.80 0
1955-05-26 Acid Wash 1717.20 1718.80 0
1955-05-31 Packing Device Capped w/Cement 1714.20 1714.20 0
1955-06-01 Perforation 1697.40 1698.30 13
1955-06-01 Bullet Perforation 1692.20 1693.80 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 5144 0.0 0.0 0.0
1968 5232 0.0 0.0 0.0
1969 4008 0.0 0.0 0.0
1970 3956 0.0 0.0 0.0
1971 4236 0.0 0.0 0.0
1972 5176 0.0 0.0 0.0
1973 7453 0.0 0.0 0.0
1974 8384 0.0 0.0 0.0
1975 6470 0.0 0.0 0.0
1976 6582 0.0 0.0 0.0
1977 6423 0.0 0.0 0.0
1978 8304 0.0 0.0 0.0
1979 7966 0.0 0.0 0.0
1980 8471 0.0 0.0 0.0
1981 7624 0.0 0.0 0.0
1982 8051 0.0 0.0 0.0
1983 5930 0.0 0.0 0.0
1984 8661 0.0 0.0 0.0
1985 8701 0.0 0.0 0.0
1986 8398 0.0 0.0 0.0
1987 8293 0.0 0.0 0.0
1988 7787 0.0 0.0 0.0
1989 8294 0.0 0.0 0.0
1990 8223 0.0 0.0 0.0
1991 8478 0.0 0.0 0.0
1992 8621 0.0 0.0 0.0
1993 8704 0.0 0.0 0.0
1994 8552 0.0 0.0 0.0
1995 8380 0.0 0.0 0.0
1996 2273 0.0 0.0 0.0

For data sources see[5]

References