X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0294213401000

Well Details

Well ID: 0294213401000
Loading map...
Location: 00/01-34-029-21W4/0
Location Alias: 00/01-34-29-21 W4M
Location Alias 2: 00/01-34-029-21 W4/00
Country: Canada
Province: Alberta
Township: 029
Meridian: 4
Range: 21
Section: 34
County/Municipality: Starland County
Well Name: PIONEER CANADA DRUMW 1-34-29-21
Operator Name: TAQA North Ltd.
License Number: 0026000
License Date: 1964-04-20
License Status: RecCertified
Spud Date: 1964-04-22
Final Drill Date: 1964-05-05
Well Total Depth: 1615.40 m
Surface Hole Latitude: 51.520154
Surface Hole Longitude: -112.868209

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1964-04-20 Obtained License
1964-05-05 Finished Drilling
1964-05-05 Well Mode changed to Drilled and Cased
1964-05-07 Production Casing Operation Performed
1964-05-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-05-21 Perforation Treatment Performed - Bullet Perforation
1964-05-24 Well Began Production
1964-05-24 Well Fluid changed to Crude Oil
1964-05-24 Well Mode changed to Flowing
1967-09-20 Well Fluid changed to Crude Oil
1967-09-20 Well Mode changed to Pumping
1975-11-28 Well Began Injection
1975-11-28 Well Fluid changed to Water
1975-11-28 Well Type changed to Disposal
1979-06-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-01-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-10-01 Well Fluid changed to Water
1993-10-01 Well Mode changed to Suspended
1993-10-01 Well Type changed to Disposal
1996-09-21 Well Log Performed
1996-09-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-09-22 Perforation Treatment Performed - Jet Perforation
1996-09-22 Plug Back Performed
1996-09-22 Well Abandoned
1996-09-22 Well Fluid changed to Water
1996-09-22 Well Mode changed to Abandoned
1996-09-22 Well Type changed to Disposal
1996-09-23 Perforation Treatment Performed - Remedial Casing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1964-05-21 Bullet Perforation 1592.90 1594.40 13
1964-05-21 Acid Treatment 1592.90 1594.40 0
1979-06-13 Acid Treatment 1592.90 1594.40 0
1981-01-24 Acid Treatment 1592.90 1594.40 0
1996-09-22 Packing Device Capped w/Cement 1580.00 1588.00 0
1996-09-22 Packing Device Capped w/Cement 1510.00 1519.00 0
1996-09-22 Perforation 305.00 305.50 24
1996-09-23 Remedial Casing Cementing 305.00 305.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 48 0.0 0.0 0.0
1968 2992 0.0 0.0 0.0
1969 1303 0.0 0.0 0.0
1970 6117 0.0 0.0 0.0
1971 2640 0.0 0.0 0.0
1972 1610 0.0 0.0 0.0
1975 0 0.0 0.0 0.0
1976 0 0.0 0.0 0.0
1977 0 0.0 0.0 0.0
1978 0 0.0 0.0 0.0
1979 0 0.0 0.0 0.0
1980 0 0.0 0.0 0.0
1981 0 0.0 0.0 0.0
1982 0 0.0 0.0 0.0
1983 0 0.0 0.0 0.0
1984 0 0.0 0.0 0.0
1985 0 0.0 0.0 0.0
1986 0 0.0 0.0 0.0
1987 0 0.0 0.0 0.0
1988 0 0.0 0.0 0.0
1989 0 0.0 0.0 0.0
1990 0 0.0 0.0 0.0
1991 0 0.0 0.0 0.0
1992 0 0.0 0.0 0.0
1993 0 0.0 0.0 0.0

For data sources see[5]

References