If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0294192416000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.50132,"lon":-112.539761,"icon":""}]} |
Location: 00/16-24-029-19W4/0 | |
Location Alias: 00/16-24-29-19 W4M | |
Location Alias 2: 00/16-24-029-19 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 029 | |
Meridian: 4 | |
Range: 19 | |
Section: 24 | |
County/Municipality: Starland County | |
Well Name: TEAC AERIAL 16-24-29-19 | |
Operator Name: Trident Exploration (Alberta) Corp. | |
License Number: 0186637 | |
License Date: 1996-03-08 | |
License Status: Issued | |
Spud Date: 1996-04-27 | |
Final Drill Date: 1996-05-03 | |
Well Total Depth: 1345.00 m | |
Surface Hole Latitude: 51.501320 | |
Surface Hole Longitude: -112.539761 |
Date | Event |
---|---|
1996-03-08 | Obtained License |
1996-04-28 | Surface Casing Operation Performed |
1996-04-29 | Direction Drilling Operation Performed - Deviate |
1996-05-03 | Finished Drilling |
1996-05-03 | Well Log Performed |
1996-05-03 | Well Mode changed to Drilled and Cased |
1996-05-04 | Production Casing Operation Performed |
1996-05-04 | Rig Released |
1996-05-16 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1996-05-16 | Perforation Treatment Performed - Jet Perforation |
1996-05-16 | Plug Back Performed |
1996-05-28 | Well Log Performed |
1996-07-12 | Well Began Production |
1996-07-12 | Well Fluid changed to Gas |
1996-07-12 | Well Mode changed to Flowing |
2019-03-01 | Well Fluid changed to Gas |
2019-03-01 | Well Mode changed to Pumping |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
1996-04-29 | 686.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1996-05-16 | Perforation | 1313.50 | 1317.50 | 26 |
1996-05-16 | Packing Device Capped w/Cement | 1308.00 | 1311.00 | 0 |
1996-05-16 | Perforation | 1299.00 | 1302.50 | 13 |
1996-05-16 | Perforation | 1303.50 | 1305.00 | 13 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1996 | 4095 | 0.0 | 0.0 | 0.0 |
1997 | 8606 | 0.0 | 0.0 | 0.0 |
1998 | 8476 | 0.0 | 0.0 | 0.0 |
1999 | 8495 | 0.0 | 0.0 | 0.0 |
2000 | 8388 | 0.0 | 0.0 | 0.0 |
2001 | 8616 | 0.0 | 0.0 | 0.0 |
2002 | 8651 | 0.0 | 0.0 | 0.0 |
2003 | 8715 | 0.0 | 0.0 | 0.0 |
2004 | 8640 | 0.0 | 0.0 | 0.0 |
2005 | 8749 | 0.0 | 0.0 | 0.0 |
2006 | 8725 | 0.0 | 0.0 | 0.0 |
2007 | 8627 | 0.0 | 0.0 | 0.0 |
2008 | 8537 | 0.0 | 0.0 | 0.0 |
2009 | 8635 | 0.0 | 0.0 | 0.0 |
2010 | 8513 | 0.0 | 0.0 | 0.0 |
2011 | 8495 | 0.0 | 0.0 | 0.0 |
2012 | 8504 | 0.0 | 0.0 | 0.0 |
2013 | 8639 | 0.0 | 0.0 | 0.0 |
2014 | 7630 | 0.0 | 0.0 | 0.0 |
2015 | 8259 | 0.0 | 0.0 | 0.0 |
2016 | 6876 | 0.0 | 0.0 | 0.0 |
2017 | 8036 | 0.0 | 0.0 | 0.0 |
2018 | 8759 | 0.0 | 0.0 | 0.0 |
2019 | 2879 | 0.0 | 0.0 | 0.0 |
For data sources see[6]