X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0294162510000

Well Details

Well ID: 0294162510000
Loading map...
Location: 00/10-25-029-16W4/0
Location Alias: 00/10-25-29-16 W4M
Location Alias 2: 00/10-25-029-16 W4/00
Country: Canada
Province: Alberta
Township: 029
Meridian: 4
Range: 16
Section: 25
County/Municipality: Special Areas No. 2
Well Name: MAYNARD ET AL COYOTE 10-25-29-16
Operator Name: Maynard Energy Inc.
License Number: 0096103
License Date: 1982-06-02
License Status: RecCertified
Spud Date: 1982-06-09
Final Drill Date: 1982-06-13
Well Total Depth: 1315.00 m
Surface Hole Latitude: 51.512554
Surface Hole Longitude: -112.125274

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1982-06-02 Obtained License
1982-06-09 Lost Circulation Occurred
1982-06-13 Finished Drilling
1982-06-14 Production Casing Operation Performed
1982-07-22 Perforation Treatment Performed - Jet Perforation
1982-07-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1982-07-23 Perforation Treatment Performed - Jet Perforation
1982-07-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1982-07-27 Perforation Treatment Performed - Jet Perforation
1982-08-08 Perforation Treatment Performed - Jet Perforation
1982-08-18 Well Mode changed to Drilled and Cased
1982-09-26 Well Began Production
1982-09-26 Well Fluid changed to Gas
1982-09-26 Well Mode changed to Flowing
1984-11-27 Well Fluid changed to Gas
1984-11-27 Well Mode changed to Suspended
1986-06-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1986-06-24 Plug Back Performed
1986-06-24 Well Abandoned
1986-06-24 Well Fluid changed to Gas
1986-06-24 Well Log Performed
1986-06-24 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1982-07-22 Perforation 1271.00 1273.00 7
1982-07-22 Perforation 1251.50 1253.00 7
1982-07-23 Packing Device Capped w/Cement 1237.00 1245.00 0
1982-07-23 Perforation 1220.00 1221.00 7
1982-07-27 Packing Device Capped w/Cement 1102.00 1110.00 0
1982-07-27 Perforation 559.00 560.00 13
1982-08-08 Perforation 560.00 561.00 0
1986-06-24 Packing Device Capped w/Cement 542.00 550.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1982 326 0.0 0.0 0.0
1983 330 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1982-06-09 Lost Circulation 9.00 9.00

For data sources see[6]

References