X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0294141503002

Well Details

Well ID: 0294141503002
Loading map...
Location: 00/03-15-029-14W4/2
Location Alias: 00/03-15-29-14 W4M
Location Alias 2: 00/03-15-029-14 W4/02
Country: Canada
Province: Alberta
Township: 029
Meridian: 4
Range: 14
Section: 15
County/Municipality: Special Areas No. 2
Well Name: AMOCO WILDUNN 3-15-29-14
Operator Name: ConocoPhillips Canada Resources Corp.
License Number: 0005683
License Date: 1952-11-21
License Status: RecCertified
Spud Date: 1952-12-06
Final Drill Date: 1953-01-17
Well Total Depth: 1411.20 m
Surface Hole Latitude: 51.476258
Surface Hole Longitude: -111.894860

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1952-11-21 Obtained License
1952-12-13 Drill Stem Test Performed
1952-12-16 Drill Stem Test Performed
1952-12-17 Drill Stem Test Performed
1952-12-24 Drill Stem Test Performed
1952-12-25 Drill Stem Test Performed
1952-12-27 Drill Stem Test Performed
1952-12-31 Drill Stem Test Performed
1953-01-13 Drill Stem Test Performed
1953-01-14 Drill Stem Test Performed
1953-01-17 Finished Drilling
1953-01-17 Well Mode changed to Drilled and Cased
1953-01-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1953-01-24 Perforation Treatment Performed - Jet Perforation
1953-01-26 Perforation Treatment Performed - Cement Plug
1953-01-26 Production Casing Operation Performed
1953-01-27 Perforation Treatment Performed - Acid Wash - No Pressure
1963-11-08 Perforation Treatment Performed - Cement Squeeze
1963-11-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1963-11-10 Perforation Treatment Performed - Jet Perforation
1969-08-22 Perforation Treatment Performed - Cement Plug
1969-08-24 Perforation Treatment Performed - Jet Perforation
1969-08-25 Perforation Treatment Performed - Acid Wash - No Pressure
1969-12-09 Perforation Treatment Performed - Cement Squeeze
1969-12-10 Perforation Treatment Performed - Jet Perforation
1969-12-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1970-01-14 Well Began Production
1970-01-14 Well Fluid changed to Gas
1970-01-14 Well Mode changed to Flowing
1979-08-25 Perforation Treatment Performed - Cement Squeeze
1979-08-26 Perforation Treatment Performed - Jet Perforation
1979-08-28 Perforation Treatment Performed - Cement Squeeze
1979-08-28 Perforation Treatment Performed - Jet Perforation
1979-08-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-09-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1979-09-01 Perforation Treatment Performed - Jet Perforation
1979-09-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-09-11 Perforation Treatment Performed - Cement Squeeze
1979-09-11 Well Abandoned
1979-09-11 Well Fluid changed to Gas
1979-09-11 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1953-01-24 Perforation 1098.50 1100.90 10
1969-08-25 Acid Wash 936.70 937.90 0
1969-12-09 Cement Squeeze 936.70 939.10 0
1969-12-10 Perforation 918.40 919.30 10
1969-12-10 Perforation 920.20 921.10 10
1969-12-10 Perforation 922.30 923.20 7
1969-12-11 Acid Treatment 918.40 923.20 0
1979-08-25 Cement Squeeze 918.40 923.20 0
1979-08-26 Perforation 842.00 843.50 7
1979-08-26 Perforation 845.00 846.50 7
1979-08-28 Cement Squeeze 842.00 846.50 0
1953-01-24 Acid Treatment 1098.50 1100.90 10
1979-08-28 Perforation 819.00 822.50 7
1979-08-28 Perforation 825.00 826.50 7
1979-08-29 Acid Treatment 819.00 826.50 0
1979-09-01 Packing Device Capped w/Cement 784.00 792.00 0
1979-09-01 Perforation 273.50 278.00 13
1979-09-09 Acid Treatment 273.50 278.00 0
1979-09-11 Cement Squeeze 273.50 278.00 0
1953-01-26 Cement Plug 1321.30 1411.20 0
1953-01-27 Acid Wash 1098.50 1100.90 0
1963-11-08 Cement Squeeze 1098.50 1100.90 0
1963-11-10 Perforation 937.90 939.10 13
1963-11-10 Acid Treatment 937.90 939.10 0
1969-08-22 Cement Plug 947.90 1321.30 0
1969-08-24 Perforation 936.70 937.90 10

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1970 1791 0.0 0.0 0.0
1971 7046 0.0 0.0 0.0
1972 7596 0.0 0.0 0.0
1973 7707 0.0 0.0 0.0
1974 6520 0.0 0.0 0.0
1975 7564 0.0 0.0 0.0
1976 7856 0.0 0.0 0.0
1977 2902 0.0 0.0 0.0

For data sources see[5]

References