X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0294041611003

Well Details

Well ID: 0294041611003
Loading map...
Location: 00/11-16-029-04W4/3
Location Alias: 00/11-16-29-04 W4M
Location Alias 2: 00/11-16-029-04 W4/03
Country: Canada
Province: Alberta
Township: 029
Meridian: 4
Range: 04
Section: 16
County/Municipality: Special Areas No. 3
Well Name: Canlin OYEN 11-16-29-4
Operator Name: Canlin Energy Corporation
License Number: 0064241
License Date: 1977-06-09
License Status: Suspension
Spud Date: 1977-06-14
Final Drill Date: 1977-06-17
Well Total Depth: 886.10 m
Surface Hole Latitude: 51.484377
Surface Hole Longitude: -110.514289

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1977-06-09 Obtained License
1977-06-17 Drill Stem Test Performed
1977-06-17 Finished Drilling
1977-06-17 Well Mode changed to Drilled and Cased
1977-06-18 Drill Stem Test Performed
1977-06-19 Production Casing Operation Performed
1977-07-18 Perforation Treatment Performed - Jet Perforation
1977-07-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1977-09-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1977-09-29 Perforation Treatment Performed - Jet Perforation
1999-03-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-03-27 Plug Back Performed
1999-03-29 Well Log Performed
1999-03-31 Perforation Treatment Performed - Jet Perforation
1999-03-31 Well Mode changed to Drilled and Cased
2000-05-19 Well Began Production
2000-05-19 Well Fluid changed to Gas
2000-05-19 Well Mode changed to Flowing
2000-06-09 Perforation Treatment Performed - Remedial Casing
2000-06-09 Well Log Performed
2008-11-01 Well Fluid changed to Gas
2008-11-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1977-07-18 Perforation 867.20 869.90 10
1977-07-19 Acid Treatment 867.20 869.90 0
1977-09-29 Perforation 775.10 776.30 10
1977-09-29 Acid Treatment 775.10 776.30 0
1999-03-27 Packing Device Capped w/Cement 847.00 855.00 0
1999-03-31 Perforation 830.80 832.80 20
2000-06-09 Remedial Casing Cementing 0.10 87.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2000 5052 0.0 0.0 0.0
2001 8506 0.0 0.0 0.0
2002 8727 0.0 0.0 0.0
2003 8746 0.0 0.0 0.0
2004 8751 0.0 0.0 0.0
2005 8492 0.0 0.0 0.0
2006 8543 0.0 0.0 0.0
2007 8607 0.0 0.0 0.0
2008 6010 0.0 0.0 0.0

For data sources see[5]

References