X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0294041611000

Well Details

Well ID: 0294041611000
Loading map...
Location: 00/11-16-029-04W4/0
Location Alias: 00/11-16-29-04 W4M
Location Alias 2: 00/11-16-029-04 W4/00
Country: Canada
Province: Alberta
Township: 029
Meridian: 4
Range: 04
Section: 16
County/Municipality: Special Areas No. 3
Well Name: Canlin OYEN 11-16-29-4
Operator Name: Canlin Energy Corporation
License Number: 0064241
License Date: 1977-06-09
License Status: Suspension
Spud Date: 1977-06-14
Final Drill Date: 1977-06-17
Well Total Depth: 886.10 m
Surface Hole Latitude: 51.484377
Surface Hole Longitude: -110.514289

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1977-06-09 Obtained License
1977-06-17 Drill Stem Test Performed
1977-06-17 Finished Drilling
1977-06-17 Well Mode changed to Drilled and Cased
1977-06-18 Drill Stem Test Performed
1977-06-19 Production Casing Operation Performed
1977-07-18 Perforation Treatment Performed - Jet Perforation
1977-07-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1977-09-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1977-09-29 Perforation Treatment Performed - Jet Perforation
1977-10-06 Well Began Production
1977-10-06 Well Fluid changed to Gas
1977-10-06 Well Mode changed to Flowing
1988-10-01 Well Fluid changed to Gas
1988-10-01 Well Mode changed to Suspended
1999-03-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-03-27 Plug Back Performed
1999-03-27 Well Fluid changed to Gas
1999-03-27 Well Mode changed to Abandoned Zone
1999-03-29 Well Log Performed
1999-03-31 Perforation Treatment Performed - Jet Perforation
2000-06-09 Perforation Treatment Performed - Remedial Casing
2000-06-09 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1977-07-18 Perforation 867.20 869.90 10
1977-07-19 Acid Treatment 867.20 869.90 0
1977-09-29 Perforation 775.10 776.30 10
1977-09-29 Acid Treatment 775.10 776.30 0
1999-03-27 Packing Device Capped w/Cement 847.00 855.00 0
1999-03-31 Perforation 830.80 832.80 20
2000-06-09 Remedial Casing Cementing 0.10 87.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1977 331 0.0 0.0 0.0
1978 6134 0.0 0.0 0.0
1979 8333 0.0 0.0 0.0
1980 5576 0.0 0.0 0.0
1981 6236 0.0 0.0 0.0
1982 4603 0.0 0.0 0.0
1983 4621 0.0 0.0 0.0
1984 4916 0.0 0.0 0.0
1985 5193 0.0 0.0 0.0
1986 1769 0.0 0.0 0.0

For data sources see[5]

References