X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0294010703002

Well Details

Well ID: 0294010703002
Loading map...
Location: 00/03-07-029-01W4/2
Location Alias: 00/03-07-29-01 W4M
Location Alias 2: 00/03-07-029-01 W4/02
Country: Canada
Province: Alberta
Township: 029
Meridian: 4
Range: 01
Section: 07
County/Municipality: Special Areas No. 3
Well Name: NUVISTA HILAND 3-7-29-1
Operator Name: NuVista Energy Ltd.
License Number: 0365848
License Date: 2006-11-10
License Status: Suspension
Spud Date: 2006-11-23
Final Drill Date: 2006-11-25
Well Total Depth: 904.30 m
Surface Hole Latitude: 51.462504
Surface Hole Longitude: -110.134397

For data sources see[1][2]

Well History

Date Event
2006-11-10 Obtained License
2006-11-25 Finished Drilling
2006-11-25 Well Mode changed to Drilled and Cased
2006-11-26 Production Casing Operation Performed
2006-11-26 Rig Released
2006-11-26 Surface Casing Operation Performed
2006-11-26 Well Log Performed
2006-12-02 Perforation Treatment Performed - Jet Perforation
2006-12-02 Well Log Performed
2006-12-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-12-03 Perforation Treatment Performed - Jet Perforation
2006-12-03 Plug Back Performed
2006-12-14 Perforation Treatment Performed - Jet Perforation
2006-12-14 Well Log Performed
2006-12-23 Well Began Production
2006-12-23 Well Fluid changed to Gas
2006-12-23 Well Mode changed to Flowing
2013-08-01 Well Fluid changed to Gas
2013-08-01 Well Mode changed to Suspended
2015-05-01 Well Fluid changed to Gas
2015-05-01 Well Mode changed to Flowing
2016-09-01 Well Fluid changed to Gas
2016-09-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2006-12-02 Perforation 875.50 877.00 17
2006-12-02 Perforation 873.00 874.00 17
2006-12-03 Packing Device Capped w/Cement 863.00 871.00 0
2006-12-03 Perforation 828.50 829.50 17
2006-12-14 Perforation 755.00 756.00 17
2006-12-14 Perforation 756.00 757.00 17
2006-12-14 Perforation 757.00 758.00 17

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2006 210 0.0 0.0 0.0
2007 8547 0.0 0.0 0.0
2008 8654 0.0 0.0 0.0
2009 6576 0.0 0.0 0.0
2010 8646 0.0 0.0 0.0
2011 8526 0.0 0.0 0.0
2012 3506 0.0 0.0 0.0
2015 4717 0.0 0.0 0.0
2016 24 0.0 0.0 0.0

For data sources see[5]

References