X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0294010210000

Well Details

Well ID: 0294010210000
Loading map...
Location: 00/10-02-029-01W4/0
Location Alias: 00/10-02-29-01 W4M
Location Alias 2: 00/10-02-029-01 W4/00
Country: Canada
Province: Alberta
Township: 029
Meridian: 4
Range: 01
Section: 02
County/Municipality: Special Areas No. 3
Well Name: CASS ANTELOPE 10-2-29-1
Operator Name: M.L. Cass Petroleum Corporation
License Number: 0139855
License Date: 1989-05-19
License Status: Abandoned
Spud Date: 1989-06-02
Final Drill Date: 1989-06-09
Well Total Depth: 929.00 m
Surface Hole Latitude: 51.454530
Surface Hole Longitude: -110.034587

For data sources see[1][2]

Well History

Date Event
1989-05-19 Obtained License
1989-06-03 Surface Casing Operation Performed
1989-06-07 Drill Stem Test Performed
1989-06-07 Well Log Performed
1989-06-08 Production Casing Operation Performed
1989-06-09 Finished Drilling
1989-06-09 Rig Released
1989-06-24 Well Log Performed
1989-06-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1989-06-26 Perforation Treatment Performed - Jet Perforation
1989-06-26 Plug Back Performed
1989-06-26 Well Mode changed to Drilled and Cased
1993-12-01 Well Began Production
1993-12-01 Well Fluid changed to Gas
1993-12-01 Well Mode changed to Flowing
2003-09-15 Well Fluid changed to Gas
2003-09-15 Well Mode changed to Closed
2004-09-17 Well Log Performed
2004-09-18 Well Log Performed
2004-09-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-09-19 Perforation Treatment Performed - Jet Perforation
2004-09-19 Plug Back Performed
2004-09-19 Well Fluid changed to Gas
2004-09-19 Well Log Performed
2004-09-19 Well Mode changed to Abandoned Zone
2004-09-20 Perforation Treatment Performed - Acid Squeeze - Press Used
2004-09-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-09-21 Perforation Treatment Performed - Remedial Casing
2004-11-25 Perforation Treatment Performed - Acid Squeeze - Press Used
2004-11-25 Perforation Treatment Performed - Jet Perforation
2004-11-25 Well Log Performed
2004-11-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-11-26 Perforation Treatment Performed - Remedial Casing
2004-11-29 Perforation Treatment Performed - Jet Perforation
2004-11-29 Well Log Performed
2004-11-30 Perforation Treatment Performed - Acid Squeeze - Press Used
2004-11-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-11-30 Perforation Treatment Performed - Remedial Casing
2004-12-02 Perforation Treatment Performed - Acid Squeeze - Press Used
2004-12-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-12-02 Perforation Treatment Performed - Jet Perforation
2004-12-02 Perforation Treatment Performed - Remedial Casing
2004-12-02 Well Log Performed
2004-12-04 Perforation Treatment Performed - Cement Plug
2004-12-04 Perforation Treatment Performed - Jet Perforation
2004-12-04 Perforation Treatment Performed - Remedial Casing
2004-12-04 Well Log Performed
2006-01-10 Perforation Treatment Performed - Jet Perforation
2007-11-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-11-06 Well Log Performed
2007-11-07 Well Abandoned
2007-11-07 Well Fluid changed to Gas
2007-11-07 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1989-06-26 Perforation 785.00 787.00 13
2004-11-25 Perforation 261.00 261.50 13
2004-11-25 Perforation 251.50 252.00 13
2004-11-25 Acid Treatment 251.50 261.50 0
2004-11-26 Remedial Casing Cementing 251.50 261.50 0
2004-11-26 Packing Device Capped w/Cement 235.50 255.90 0
2004-11-29 Perforation 231.00 231.90 13
2004-11-29 Perforation 225.00 225.90 13
2004-11-30 Acid Treatment 225.00 231.90 0
2004-11-30 Remedial Casing Cementing 225.00 231.90 0
2004-11-30 Packing Device Capped w/Cement 215.80 229.00 0
1989-06-26 Packing Device Capped w/Cement 772.00 780.00 0
2004-12-02 Perforation 213.00 214.10 13
2004-12-02 Perforation 207.00 208.10 13
2004-12-02 Acid Treatment 207.00 214.10 0
2004-12-02 Remedial Casing Cementing 207.00 214.10 0
2004-12-02 Packing Device Capped w/Cement 193.80 211.50 0
2004-12-04 Perforation 173.00 176.30 13
2004-12-04 Remedial Casing Cementing 173.00 176.30 0
2004-12-04 Cement Plug 153.10 193.80 0
2006-01-10 Perforation 173.00 176.30 13
2006-01-10 Perforation 207.00 214.10 13
1989-06-26 Perforation 730.00 732.00 13
2007-11-06 Packing Device Capped w/Cement 182.00 200.00 0
2007-11-06 Packing Device Capped w/Cement 162.00 170.00 0
2004-09-19 Packing Device Capped w/Cement 720.00 728.00 0
2004-09-19 Perforation 413.50 414.00 13
2004-09-19 Perforation 390.50 391.00 13
2004-09-20 Acid Treatment 390.50 414.00 0
2004-09-21 Remedial Casing Cementing 390.50 414.00 0
2004-09-21 Packing Device Capped w/Cement 347.00 408.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1993 647 0.0 0.0 0.0
1994 3540 0.0 0.0 0.0
1995 444 0.0 0.0 0.0
2003 718 0.0 0.0 0.0

For data sources see[5]

References