X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0285061806000

Well Details

Well ID: 0285061806000
Loading map...
Location: 00/06-18-028-06W5/0
Location Alias: 00/06-18-28-06 W5M
Location Alias 2: 00/06-18-028-06 W5/00
Country: Canada
Province: Alberta
Township: 028
Meridian: 5
Range: 06
Section: 18
County/Municipality: Municipal District of Bighorn No. 8
Well Name: Canlin WCATH 6-18-28-6
Operator Name: Canlin Energy Corporation
License Number: 0249800
License Date: 2001-01-26
License Status: Amended
Spud Date: 2001-02-13
Final Drill Date: 2001-04-15
Well Total Depth: 3940.00 m
Surface Hole Latitude: 51.387253
Surface Hole Longitude: -114.861145

For data sources see[1][2]

Well History

Date Event
2000-03-20 Well Log Performed
2001-01-26 Obtained License
2001-02-13 Direction Drilling Operation Performed - Deviate
2001-02-17 Well Log Performed
2001-02-18 Surface Casing Operation Performed
2001-04-01 Well Log Performed
2001-04-15 Finished Drilling
2001-04-15 Well Log Performed
2001-04-17 Well Log Performed
2001-04-18 Well Log Performed
2001-04-19 Well Log Performed
2001-04-21 Production Casing Operation Performed
2001-04-22 Rig Released
2001-04-22 Well Mode changed to Drilled and Cased
2001-05-25 Well Log Performed
2001-05-29 Perforation Treatment Performed - Jet Perforation
2001-05-29 Well Log Performed
2001-05-30 Perforation Treatment Performed - Jet Perforation
2001-06-04 Well Log Performed
2001-06-05 Perforation Treatment Performed - Chemical Squeeze
2001-06-08 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-06-10 Perforation Treatment Performed - Jet Perforation
2001-06-10 Well Log Performed
2001-06-11 Perforation Treatment Performed - Jet Perforation
2001-06-12 Perforation Treatment Performed - Chemical Squeeze
2001-06-14 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-06-17 Perforation Treatment Performed - Jet Perforation
2001-06-17 Well Log Performed
2001-06-20 Well Began Production
2001-06-20 Well Fluid changed to Gas
2001-06-20 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2001-02-13 0.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2001-05-29 Perforation 3838.00 3850.00 13
2001-06-10 Perforation 3717.00 3733.00 13
2001-06-11 Perforation 3710.50 3713.50 13
2001-06-11 Perforation 3694.00 3707.00 13
2001-06-12 Chemical Squeeze 3694.00 3745.00 0
2001-06-14 Acid Treatment 3694.00 3745.00 0
2001-06-17 Perforation 3750.00 3756.00 13
2001-05-29 Perforation 3821.00 3827.00 13
2001-05-29 Perforation 3803.00 3819.00 13
2001-05-29 Perforation 3783.00 3799.00 13
2001-05-30 Perforation 3777.50 3780.00 13
2001-05-30 Perforation 3770.00 3774.00 13
2001-06-05 Chemical Squeeze 3770.00 3850.00 0
2001-06-08 Acid Treatment 3770.00 3850.00 0
2001-06-10 Perforation 3734.50 3745.00 13

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2001 4129 0.0 0.0 0.0
2002 8561 0.0 0.0 0.0
2003 8666 0.0 0.0 0.0
2004 8524 0.0 0.0 0.0
2005 7978 0.0 0.0 0.0
2006 8603 0.0 0.0 0.0
2007 8543 0.0 0.0 0.0
2008 8451 0.0 0.0 0.0
2009 8301 0.0 0.0 0.0
2010 8194 0.0 0.0 0.0
2011 8088 0.0 0.0 0.0
2012 8519 0.0 0.0 0.0
2013 8160 0.0 0.0 0.0
2014 8541 0.0 0.0 0.0
2015 8759 0.0 0.0 0.0
2016 8513 0.0 0.0 0.0
2017 7703 0.0 0.0 0.0
2018 6667 0.0 0.0 0.0
2019 6530 0.0 0.0 0.0
2020 2071 0.0 0.0 0.0

For data sources see[6]

References