X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0285020213000

Well Details

Well ID: 0285020213000
Loading map...
Location: 00/13-02-028-02W5/0
Location Alias: 00/13-02-28-02 W5M
Location Alias 2: 00/13-02-028-02 W5/00
Country: Canada
Province: Alberta
Township: 028
Meridian: 5
Range: 02
Section: 02
County/Municipality: Rocky View County
Well Name: BONAVISTA CROSS 13-2-28-2
Operator Name: Bonavista Energy Corporation
License Number: 0011945
License Date: 1956-07-31
License Status: Issued
Spud Date: 1956-08-03
Final Drill Date: 1956-09-20
Well Total Depth: 2625.90 m
Surface Hole Latitude: 51.371144
Surface Hole Longitude: -114.186168

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1956-07-31 Obtained License
1956-08-25 Drill Stem Test Performed
1956-09-14 Drill Stem Test Performed
1956-09-16 Drill Stem Test Performed
1956-09-20 Drill Stem Test Performed
1956-09-20 Finished Drilling
1956-09-20 Well Mode changed to Drilled and Cased
1956-09-22 Production Casing Operation Performed
1956-09-28 Perforation Treatment Performed - Bullet Perforation
1956-10-03 Perforation Treatment Performed - Acid Wash - No Pressure
1956-10-06 Perforation Treatment Performed - Fractured
1956-10-11 Well Began Production
1956-10-11 Well Fluid changed to Crude Oil
1956-10-11 Well Mode changed to Flowing
1962-06-01 Perforation Treatment Performed - Acid Wash - No Pressure
1962-06-04 Well Fluid changed to Crude Oil
1962-06-04 Well Mode changed to Pumping
1966-10-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1966-10-06 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1956-09-28 Bullet Perforation 2047.60 2051.30 13
1956-10-03 Acid Wash 2047.60 2051.30 0
1956-10-06 Fracture 2047.60 2051.30 0
1962-06-01 Acid Wash 2047.60 2051.30 0
1966-10-06 Acid Treatment 2047.60 2051.30 0
1966-10-06 Fracture 2047.60 2051.30 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 744 0.0 0.0 0.0
1968 7140 0.0 0.0 0.0
1969 8720 0.0 0.0 0.0
1970 8355 0.0 0.0 0.0
1971 8731 0.0 0.0 0.0
1972 8715 0.0 0.0 0.0
1973 8406 0.0 0.0 0.0
1974 8073 0.0 0.0 0.0
1975 8087 0.0 0.0 0.0
1976 7416 0.0 0.0 0.0
1977 8759 0.0 0.0 0.0
1978 7795 0.0 0.0 0.0
1979 8669 0.0 0.0 0.0
1980 8685 0.0 0.0 0.0
1981 7876 0.0 0.0 0.0
1982 5808 0.0 0.0 0.0
1983 8475 0.0 0.0 0.0
1984 8547 0.0 0.0 0.0
1985 8119 0.0 0.0 0.0
1986 8651 0.0 0.0 0.0
1987 8664 0.0 0.0 0.0
1988 8723 0.0 0.0 0.0
1989 8519 0.0 0.0 0.0
1990 8464 0.0 0.0 0.0
1991 8735 0.0 0.0 0.0
1992 8381 0.0 0.0 0.0
1993 8567 0.0 0.0 0.0
1994 8354 0.0 0.0 0.0
1995 8607 0.0 0.0 0.0
1996 7893 0.0 0.0 0.0
1997 8533 0.0 0.0 0.0
1998 8707 0.0 0.0 0.0
1999 8759 0.0 0.0 0.0
2000 8514 0.0 0.0 0.0
2001 8356 0.0 0.0 0.0
2002 8587 0.0 0.0 0.0
2003 8699 0.0 0.0 0.0
2004 8256 0.0 0.0 0.0
2005 8583 0.0 0.0 0.0
2006 8569 0.0 0.0 0.0
2007 8746 0.0 0.0 0.0
2008 8623 0.0 0.0 0.0
2009 8610 0.0 0.0 0.0
2010 8490 0.0 0.0 0.0
2011 8574 0.0 0.0 0.0
2012 8462 0.0 0.0 0.0
2013 8547 0.0 0.0 0.0
2014 8354 0.0 0.0 0.0
2015 8129 0.0 0.0 0.0
2016 8737 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8491 0.0 0.0 0.0
2019 8627 0.0 0.0 0.0
2020 2157 0.0 0.0 0.0

For data sources see[5]

References