X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0285011406000

Well Details

Well ID: 0285011406000
Loading map...
Location: 00/06-14-028-01W5/0
Location Alias: 00/06-14-28-01 W5M
Location Alias 2: 00/06-14-028-01 W5/00
Country: Canada
Province: Alberta
Township: 028
Meridian: 5
Range: 01
Section: 14
County/Municipality: Rocky View County
Well Name: PMW G-3 CROSSE 6-14-28-1
Operator Name: TAQA North Ltd.
License Number: 0044616
License Date: 1972-12-22
License Status: Suspension
Spud Date: 1972-12-27
Final Drill Date: 1973-01-13
Well Total Depth: 2372.90 m
Surface Hole Latitude: 51.391938
Surface Hole Longitude: -114.040477

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1972-12-22 Obtained License
1973-01-13 Finished Drilling
1973-01-13 Well Mode changed to Drilled and Cased
1973-01-15 Production Casing Operation Performed
1973-01-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1973-01-20 Perforation Treatment Performed - Jet Perforation
1973-01-25 Well Began Production
1973-01-25 Well Fluid changed to Crude Oil
1973-01-25 Well Mode changed to Flowing
1973-01-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1974-03-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1974-03-04 Well Fluid changed to Crude Oil
1974-03-04 Well Mode changed to Abandoned Zone
1974-03-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1974-03-06 Perforation Treatment Performed - Jet Perforation
1975-06-11 Well Log Performed
1989-03-17 Well Log Performed
1989-03-18 Perforation Treatment Performed - Jet Perforation
2001-05-01 Perforation Treatment Performed - Jet Perforation
2001-05-02 Perforation Treatment Performed - Remedial Casing
2001-05-03 Perforation Treatment Performed - Jet Perforation
2001-05-03 Perforation Treatment Performed - Remedial Casing
2001-05-07 Perforation Treatment Performed - Jet Perforation
2008-11-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-11-28 Plug Back Performed
2008-11-28 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1973-01-20 Perforation 2334.20 2337.80 7
1989-03-18 Perforation 2050.00 2054.00 13
1989-03-18 Perforation 2056.00 2066.00 13
1989-03-18 Perforation 2068.00 2072.00 13
2001-05-01 Perforation 1378.30 1378.80 9
2001-05-02 Remedial Casing Cementing 1378.30 1378.80 0
2001-05-03 Perforation 382.00 385.00 13
2001-05-03 Remedial Casing Cementing 382.00 385.00 0
2001-05-07 Perforation 1327.70 1334.40 13
2001-05-07 Perforation 1344.20 1353.30 13
2008-11-28 Packing Device Capped w/Cement 2035.00 2043.00 0
1973-01-20 Acid Treatment 2334.20 2337.80 0
1973-01-26 Acid Treatment 2334.20 2337.80 0
1974-03-04 Packing Device Capped w/Cement 2109.40 2118.40 0
1974-03-06 Perforation 2070.50 2074.20 7
1974-03-06 Perforation 2063.80 2068.10 7
1974-03-06 Perforation 2058.30 2062.00 7
1974-03-06 Perforation 2052.80 2055.30 7
1974-03-06 Acid Treatment 2052.80 2074.20 0

For data sources see[4]



References